Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹4.1 L+₹9,740 (2.41%)Rejected-Finance | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | NIZAR H L1 | H SAIDALAVIKOYA L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for Open excavation and depositing on Bank within initial lead of 10mt and lift of 2mt of all soil except rock etc., complete complying with standard specification. | 2 | m3 | 181 ₹362 Lowest | 190 ₹380 |
| 2.00 | Earthwork excavation for foundation and depositing on Bank within initial lead of 10mt and lift of 2mt of all soil except rock etc., complete complying with standard specification. | 1 | m3 | 362 ₹362 Lowest | 370 ₹370 |
| 3.00 | P.C.C.1:4:8 mix using 40mm metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 2 | m3 | 7,602 ₹15,204 Lowest | 7,650 ₹15,300 |
| 4.00 | Supplying and erection of Steel Centering with strutting and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 1 | m2 | 436 ₹436 Lowest | 440 ₹440 |
| 5.00 | P.C.C.1:3:6 mix using 20 MM & 40mm metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 1 | m3 | 8,304 ₹8,304 Lowest | 8,310 ₹8,310 |
| 6.00 | Brick work in cm 1:5 mix using best country bricks and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 5 | m3 | 8,572 ₹42,860 Lowest | 8,580 ₹42,900 |
| 7.00 | Supplying and fabrication of steel and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 900 | kg | 103 ₹92,700 Lowest | 110 ₹99,000 |
| 8.00 | RCC 1:1.5:3 mix using 20mm ISS metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 7 | m3 | 12,094 ₹84,658 Lowest | 12,100 ₹84,700 |
| 9.00 | P.C.C.1:2:4 mix using 20mm metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 2 | m3 | 8,975 ₹17,950 Lowest | 9,000 ₹18,000 |
| 10.00 | Plastering in cm 1:3 to 12mm thick and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 42 | m2 | 389 ₹16,338 Lowest | 395 ₹16,590 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
2 Apr 2025, 3:00 pmClosed
Executive Officer
Executive Officer Sholur Town Panchayat The Nilgiri District
Maintenance of GLR at Bokkapuram in Sholur Town Panchayat-15th FC Tied 2nd Instal 24-25
2025_DTP_535856_1
33/2025-2
Open Tender
Civil Works
Works
180 days
Sholur First Grade Town Panchayat
Others
2 documents required · 2 mandatory
₹0
₹5,000
Yes
16 Oct 2025
27 Mar 2025
2 Apr 2025
27 Mar 2025
2 Apr 2025
27 Mar 2025
27 Mar 2025 - 2 Apr 2025
Amount
Earthwork excavation for Open excavation and depositing on Bank within initial lead of 10mt and lift of 2mt of all soil except rock etc., complete complying with standard specification.
Earthwork excavation for foundation and depositing on Bank within initial lead of 10mt and lift of 2mt of all soil except rock etc., complete complying with standard specification.
P.C.C.1:4:8 mix using 40mm metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification
Supplying and erection of Steel Centering with strutting and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification
P.C.C.1:3:6 mix using 20 MM & 40mm metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification
Brick work in cm 1:5 mix using best country bricks and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification
Supplying and fabrication of steel and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification
RCC 1:1.5:3 mix using 20mm ISS metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification
P.C.C.1:2:4 mix using 20mm metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification
Plastering in cm 1:3 to 12mm thick and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification
Plastering in cm 1:5 to 12mm thick and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification
Supply and fixing of Mild steel door using L angles , M.S patta , and M.S sheet of reqiured size and gauge including priming coat the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification
Painting two coats using best emulsion and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification
Supplying and delivery of following dia "B" class GI Pipe , with standard weight and brand and the rate including all cost and conveyance of all materials to site and Labour charges etc complete complying with standard specification.
Laying and jointing G.I pipes and G.I specials to proper gradient and alighnment and testing the pipe with water and the rate including cost and conveyance of all charges etc., complete.
H SAIDALAVIKOYA (BID ID -1282801)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_637757.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .