| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹40.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹40.0 L+₹4,398.73 (0.11%)Admitted-Finance 534 ASHIRVAD MAL GODAM ROAD SULTANPUR 228001 | SULTANPUR | SULTANPUR | UTTAR PRADESH | 228001 | L2 | Admitted-Finance | ||
| 3 | L2₹40.0 L+₹4,398.73 (0.11%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹40.0 L
EMD Value
₹79,900
Closing Date
17 Mar 2026, 11:00 amClosed
executive officer nagar panchayat phulpur
nagar panchayat office
in ward 3 shekhpur pashchimi in front of shishu mandir school beautification of talab
2026_DOLBU_1119446_1
talabfy2526
Open Tender
Civil Works
Percentage
in ward 3 shekhpur pashchimi
only eligible firms
2 documents required · 2 mandatory
₹4,720
executive officer nagar panchayat phulpur
₹79,900
24 Mar 2026
24 Feb 2026
17 Mar 2026
24 Feb 2026
17 Mar 2026
24 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Mitti v Baundarywall | |||||
| 1.01 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. : . As per DSR 2.31 | 1,500 | Sqm. | 12.94 | ₹19,410 |
| 1.02 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.Hard rock (requiring blasting) .As per DSR 2.7.2 | 475 | Cum. | 642.68 | ₹3,05,273 |
| 1.03 | Boring with hydraulic piling rigs with power units, providing and installing cast in situ single under reamed piles of specified diameter and length below pile cap in M-25 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete. (Length of pile for payment shall be measured upto to the bottom of pile cap) : .300 mm dia piles As per DSR 20.3.1 | 17.5 | Rm | 2,253.22 | ₹39,431.35 |
| 1.04 | Extra over single under ream for providing additional bulbs in underreamed piles, under specified diameter(only the nos. of extra bulbs are to be paid) : .300 mm dia piles As per DSR 20.4.1 | 5 | No | 1,930.33 | ₹9,651.65 |
| 1.05 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.Hard rock (requiring blasting) .As per DSR 2.7.2 | 243 | Cum. | 642.68 | ₹1,56,171.24 |
| 1.06 | Earth work in cutting or in embankment in ordinary soil, excavtion to be in the form of regular pits not exceeding 0.50 mtr. In depth and earth work in embankment to be in 20 cm. Layers, including ramming and dressing the surface to required levels and slops and also including 1.5 meter lift and 30 meter lead the earth from cutting to be used in making embankment or to be deposited as spoil bank within 30 meter distance as directed by Engineer incharge.with 5.0.km cortege As per DSR 2.25(a) | 339 | Cum. | 514.87 | ₹1,74,540.93 |
| 1.07 | Concrete with 4 cm gauge brick ballast fine sand of 1.25 F.M. and cement in proportion of 1:4:8 in foundations and under floors including supply of all materials, labour, tools & plants etc. required for proper completion of the work.As per DSR No.4.1.8 | 46.45 | Cum. | 5,006.82 | ₹2,32,566.79 |
| 1.08 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering , finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).As per DSR-5.3 | 33.38 | Cum. | 8,454.71 | ₹2,82,218.22 |
| 1.09 | Mild steel or iron in Plain work such as RCC or R.B. work(when not inclded in an over all rates) wrought torequired shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping and hooks... As per DSR No.5.22.6 | 2,897 | Kg | 79.27 | ₹2,29,645.19 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.94 MB
BOQ_2081602.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .