| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.0 LAccepted-AOC | ₹39.0 L Quoted ₹39.7 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹42.1 L+₹2.4 L (6.06%)Rejected-Finance | ₹42.1 L+₹2.4 L (6.06%) | L2 | Rejected-Finance Not being L1 |
| 3 | L3₹43.9 L+₹4.2 L (10.6%)Rejected-Finance | ₹43.9 L+₹4.2 L (10.6%) | L3 | Rejected-Finance Not Being L1 |
| 4 | L4₹44.3 L+₹4.5 L (11.4%)Rejected-Finance FLAT NO 1004 BUILDING NO L 11 KEDAR HOUSING SOCIETY 10TH FLOOR SECTOR NO 21 TALOJA PHASE 2 PANVEL RAIGAD NAVI MUMBAI 410208 | NAVI MUMBAI | RAIGAD | MAHARASHTRA | 410208 | ₹44.3 L+₹4.5 L (11.4%) | L4 | Rejected-Finance Not Being L1 |
| Sl No | Description | Qty | Unit | K R Electricals L2 | SHRI SULAI ELECTRICALS L3 | M/s ASPIRE ENGINEERING ENTERPRISES L4 | DIAMOND ENTERPRISES L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Material and labour for periodical repair, maintenance & overhauling of 11 KV HT VCB 630/800 Amp including opening, checking, cleaning with CTC, cleaning wiping of insulating component, incl primary & secondary current enjection test , Insulation resistance test Primary to secondary & Primary to earth and report to be submitted , cleaning of spouts, busbars, supports, CT, PT, cleaning contact tips, cover the expossed portion of busbar with HT tape & heat shrinkable sleeves, spout insulators for visible crack, tightness of fasterners holding moving contacts, check & correct the buffer gap adjustment & mechanism settings, meters. Testing and calibration of all relays fitted in control panels from authorized testing team of the OEM, such as earth fault relays, over current relays fitted in HT 11 KV panels for its corrections & setting with main control panel relays & MSEDCL so that individual VCB shall be tripped prior to main panel, contractor shall submit testing and calibration report showing all set parameters. Testing, cleaning & overhauling of complete operating mechanism for smooth functioning, checking of control panel wiring for operation & protection for tripping & closing & rectifying the defects all equipments including Deoxidizing of all electrical contacts replacement unserviceable wiring with ferrule & lugs, reassembling & testing of complete VCB all as directed specified and directed by Engineer in Charge .
VCB Trolley
1. Checked mechanism alignment with all mounting parts.
2. Checked No/Off component gaps of poles
3. Checked isolating contacts and alignments
4. Checked Aux switch, Limit switches, test service and its operation and function.
5 Checked IR test of pole, V, I in respect of earth and between phases.
6 Checked all hardware and tightened properly where ever required.
7.Checked close trip coil and its plugin movments/alighnment with close trip shafts
8. Checked spring changing ON - OFF manual opereting
9. Cleaning done properly with DC - 226 spray
10.Lubrication done properly for all moving parts
11. Checked Rack-In-Out assembly opertion | 42 | Job | 8,350 ₹3,50,700 | 7,900 ₹3,31,800 Lowest | 8,600 ₹3,61,200 | 8,300 ₹3,48,600 |
| 1.02VCB panel 1 . Checked plug contact and spout 2 . Checked shuther operetion 3 . Checked inter locks opereting 4 . Checked busbars connection with CT / PT's and cables 5 . Cleaning done for CT chambers properly 6 . checked tretst of all panels 7 . checked all fuses MCB's A/P relays 8 . checked OCEF realy triping 9 . checked relay/ meter control chambers 10 . lubrication and claning done for all chambers and all switchs 11 . After work VCB taken in sa and checked operting same found ok | |||||||
| 1.03Note:- i) Required spare parts for replacement will be measured and paid under relivant item as supply only. Item No-2 to 36 ii) Cost of Labour for replacement is demed to be included under this item. Iii) Repairs to be carried out by OEM Authorized agency only. | |||||||
| 2.00 | Supply Only Trip Catch Assembly | 2 | Each | 5,200 ₹10,400 | 9,000 ₹18,000 | 5,500 ₹11,000 | 5,000 ₹10,000 Lowest |
| 3.00 | Supply Only Trip Shaft Assembly. | 4 | Each | 1,050 ₹4,200 | 2,200 ₹8,800 | 1,150 ₹4,600 | 1,000 ₹4,000 Lowest |
| 4.00 | Supply Only closing shaft Assembly. | 4 | Each | 1,050 ₹4,200 | 2,200 ₹8,800 | 1,150 ₹4,600 | 1,000 ₹4,000 Lowest |
| 5.00 | Supply Only Spring charge Indicator Assembly. | 4 | Each | 1,025 ₹4,100 | 2,000 ₹8,000 | 1,050 ₹4,200 | 1,000 ₹4,000 Lowest |
| 6.00 | Supply Only Motor cut off limit switch Assembly. | 4 | Each | 1,200 ₹4,800 | 1,700 ₹6,800 | 1,500 ₹6,000 | 1,100 ₹4,400 Lowest |
| 7.00 | Supply Only Spring charging handle. | 4 | Each | 1,600 ₹6,400 | 2,400 ₹9,600 | 1,800 ₹7,200 | 1,500 ₹6,000 Lowest |
| 8.00 | Supply Only Closing Coil Assembly, DC. 12Voltage. | 3 | Each | 2,600 ₹7,800 | 3,500 ₹10,500 | 2,700 ₹8,100 | 2,500 ₹7,500 Lowest |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
17 Dec 2025, 6:00 pmClosed
CWE AF NAGPUR
HQ CWE AF NAGPUR VAYUSENA NAGAR, NAGPUR 440007 MILITARY ENGINEER SERVICES
REPAIR AND MAINT OF HT OVER HEAD LINE HT CABLE GOD POWER TRANSFORMER DISTRIBUTION TRANSFORMER HT VCB HT OCB PANEL AND OTHER CONNECTED WORKS AT 11 BRD AF STN OJHAR
2025_MES_741916_1
80728/E8
Open Tender
Civil Works
Item Rate
GE AF OJHAR
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE AF OJHAR
₹80,000
Yes
12 Feb 2026
28 Nov 2025
19 Dec 2025
28 Nov 2025
17 Dec 2025
12 Dec 2025
Amount
Material and labour for periodical repair, maintenance & overhauling of 11 KV HT VCB 630/800 Amp including opening, checking, cleaning with CTC, cleaning wiping of insulating component, incl primary & secondary current enjection test , Insulation resistance test Primary to secondary & Primary to earth and report to be submitted , cleaning of spouts, busbars, supports, CT, PT, cleaning contact tips, cover the expossed portion of busbar with HT tape & heat shrinkable sleeves, spout insulators for visible crack, tightness of fasterners holding moving contacts, check & correct the buffer gap adjustment & mechanism settings, meters. Testing and calibration of all relays fitted in control panels from authorized testing team of the OEM, such as earth fault relays, over current relays fitted in HT 11 KV panels for its corrections & setting with main control panel relays & MSEDCL so that individual VCB shall be tripped prior to main panel, contractor shall submit testing and calibration report showing all set parameters. Testing, cleaning & overhauling of complete operating mechanism for smooth functioning, checking of control panel wiring for operation & protection for tripping & closing & rectifying the defects all equipments including Deoxidizing of all electrical contacts replacement unserviceable wiring with ferrule & lugs, reassembling & testing of complete VCB all as directed specified and directed by Engineer in Charge . VCB Trolley 1. Checked mechanism alignment with all mounting parts. 2. Checked No/Off component gaps of poles 3. Checked isolating contacts and alignments 4. Checked Aux switch, Limit switches, test service and its operation and function. 5 Checked IR test of pole, V, I in respect of earth and between phases. 6 Checked all hardware and tightened properly where ever required. 7.Checked close trip coil and its plugin movments/alighnment with close trip shafts 8. Checked spring changing ON - OFF manual opereting 9. Cleaning done properly with DC - 226 spray 10.Lubrication done properly for all moving parts 11. Checked Rack-In-Out assembly opertion
VCB panel 1 . Checked plug contact and spout 2 . Checked shuther operetion 3 . Checked inter locks opereting 4 . Checked busbars connection with CT / PT's and cables 5 . Cleaning done for CT chambers properly 6 . checked tretst of all panels 7 . checked all fuses MCB's A/P relays 8 . checked OCEF realy triping 9 . checked relay/ meter control chambers 10 . lubrication and claning done for all chambers and all switchs 11 . After work VCB taken in sa and checked operting same found ok
Note:- i) Required spare parts for replacement will be measured and paid under relivant item as supply only. Item No-2 to 36 ii) Cost of Labour for replacement is demed to be included under this item. Iii) Repairs to be carried out by OEM Authorized agency only.
Supply Only Trip Catch Assembly
Supply Only Trip Shaft Assembly.
Supply Only closing shaft Assembly.
Supply Only Spring charge Indicator Assembly.
Supply Only Motor cut off limit switch Assembly.
Supply Only Spring charging handle.
Supply Only Closing Coil Assembly, DC. 12Voltage.
Supply Only Tripping Coil Assemblyy, DC 12.Voltage.
Supply Only Auxiliary switch 6 NO/6NC.
Supply Only Indicating VCB Lamps (RYB) LED type of Shape & Size as per existing complete all as directed. MAKE : TENICK / L&T or equivalent .
Supply Only Push Button element with one NO / NC MAKE : TENICK / L&T or equivalent.
Supply Only HRC Fuse for PTs 11 KV capacity 1 to 16 Amp.
Supply only warm Gear Wheel with Main Shaft Assembly any type
Supply only insulated VI Seprators
Supply only Big Cam Assembly , VCB
Supply only Closing Spring Assembly
Supply only Tripping Spring Assembly
Supply only 32 pin plug socket Assembly
Supply only TNC switch
Supply only Anti Pumping Device
Supply only Z-Z Micro Switch
Supply only support Insulator
Supply only Drive link with Adjuster
Supply only Test service Limit Switch
Supply only PT fuse 3.15 Amp
Supply only (VCB) Heater Single Ph, 230 V, AC
Supply only Digital Volt meter 11 KV
Supply only Digital Ampmeter 11 KV
Supply and fixing 11 KV Epoxy resin cast indoor gun type Three phase potential transformer ratio 11 KV/ 3 Accuracy class-0.5 and 3 P, burden-10 A 50 Hz, bill-12/28 and VF-1.2 Cont 1.9 or 8 hrs with PT fuse 3.15 Amp suitable for Existing 11 KV VCB make Crompton 630 Amp.
Supply and fixing Current Transformer duel core Class - SP10 & Class - I, VA - 15, 11 KV 50/5 Amps resine casting.
Supply and fixing Current Transformer duel core Class - SP10 & Class - I, VA - 15, 11 KV 100/5 Amps resine casting.
Supply and fixing spring charging motor retrofit. For HT VCB 11 KV Make CG, or equivalent
Supply and fixing Vaccum Interruptor , single phase, 11 KV Make CG, or equivalent
Supply and fixing power pack with batter back up suitable for HT VCB 11 KV input voltage 230/110 AC, Output 24/30/48/110/220 V DC , back up 15-20 minutes with LED Indicator.
Material and labour for maintenance & overhauling of 11 KV OCB including opening, checking, cleaning, wiping of insulating component, primary & secondary circuits, busbars, supports, CT, PT, cleaning contact tips, cover the expossed portion of busbar with HT tape & heat shrinkable sleeves, cleaning of oil tank, tightness of fasterners holding moving contacts, check & correct the buffer gap adjustment & mechanism settings, meters, & Testing and calibration of all relays fitted in control panels from authorized testing team of the OEM, such as earth fault relays, over current relays fitted in HT 11 KV panels for its corrections & setting with main control panel relays so that individual OCB shall be tripped prior to main panel, contractor shall submit testing and calibration report showing all set parameters, testing, cleaning & overhauling of complete operating mechanism for smooth functioning, checking of control panel wiring for operation & protection for tripping & closing & rectifying the defects all equipments including Deoxidizing of all electrical contacts replacement unserviceable wiring with ferrule & lugs, and other minor parts as reqd at site reassembling & testing of complete OCB all as directed specified and directed.
Supply and fix in replacement three phase over current & earth relay, Model- CGI 14N in CG or equvalent, with 3 phase O/C + E/F + High set, 50/51 RYBN, Numerical Relay, Lowest O.C-1s, Highest O/C-1hs, Lower D/F-0s, Highest E/F Ohs, including calibration of relay with existing system so that fault can be arrested in individual panel, all as specified and directed.
Supply, installation, testing and commissionig Battery bank 24 volt,( 12X2V) , 100Ah at 10 Hrs discharge rate, self contained, floor mounted, sheet steel, cabinet with two tiers for housing and including low maint batteries with battery charger unit Make: Exide - Model No. UPST-24V-100Ah - sealed maintenance free VRLA battery, initialy charged complete with all accessaries suitable for DC supply of HT VCB, operated from 415 v, 3 phase, 50 Hz ,AC supply.
Supply and fixing in replacement Battery charger unit 24V/30V/10 Amp with displayMake: Exide - Model No. UPST-24V/30V-80Ah complete with all accessaries suitable for DC supply of HT VCB, operated from 415 v, 3 phase, 50 Hz ,AC supply.
Material and labour for Breakdown Maintenance of 11 KV HT VCB/OCB 630/800 Amp including Testing and calibration of all relays fitted in control panels from authorized testing team/rep of the OEM, such as earth fault relays, over current relays fitted in HT 11 KV panels for its corrections & setting with main control panel relays 11 KV VCB panels for its corrections & setting with main control panel relays & MSEDCL so that individual VCB shall be tripped prior to main panel, contractor shall submit testing and calibration report showing all set parameters. Testing, cleaning & overhauling of complete operating mechanism for smooth functioning for smooth functioning, checking & rectifying the defects of all equipments complete all as directed specified and directed.
Material and labour for Onload filtration and dehydration of transformer oil by on load filtration plant machine to achive minimum 40 KV dielectric strength complete and submitted the testing repot of the dielectric strength and contents of acid before and after filtration at different locations of 11 KV / 440 V installations all as specified and as directed.
Material and labour for Filling only new transformer oil for topping up or replacement of transformer oil in the OCB, Oil switch, transformers 11 KV / 440 V at different locations during the process of filtration, all as directed and specified.
Disconnected earthing strip from transformer body and neutral at site . Testing of earth resistance of each earthing of transformer (2Neutral and2 Body earthing ) and report to be submitted at AGE E/M Office complete all as directed up to 1000 KVA transformer.
Disconnected electric supply of transformer at site and Opening the cable box HT& LT side and carried out the insulation resistance test HV to LV and LV to LV of each type of transformer by arranging outside agency/OEM and re-assembleing the same and report to be submitted at AGE E/M Office complete all as directed up to 1000 KVA transformer
Taking down carefully transformer at site and dismantling / Opening the same and taking out coil and core assemebly through reputed firm to be approved by GE and carried out minor repair such as as replacement of HV/LV Bushing, termination rod, nut bolts,identifing the leakage & replacing bushing gasket/washer , etc and re-fixing in position including testing of present di-electric strength of transformer oil and re-assembleing the transformer complete all as directed by Engr in Charge up to 500 KVA transformer (Fixing rate for sl no 48 to 51 is included with the job)
Supply only non metel Part- HV bushing complete with packing for transformer of capacity up to 500 KVA and for working pressure 11 KV complete all as specified and as directed.
Supply of HT Bushing rod of suitable size for transformer of capacity up to 500 KVA
Supply only non metel Part- LV bushing complete with packing for transformer of capacity up to 1000 KVA and for working pressure 11 KV complete all as specified and as directed.
Material & labour main gasket of transformer and other gasket set complete all as specified and directed.
Taking down unserviceable transofrmer with the help of crane and transporting from site / AGE E/M Yard to civil work shop for repair by reputed firm ( As approved by GE) opening & draining out oil from transformer tank and opening/dismantling top cover along with conservator and 03 Nos of HT bushings,4nos of LT bushings,1no of earth bushing, disconnecting HV winding connection from bushing stud and LV winding from bushings studs care fully.cleaning /washing of tank ,removing dirt sludge and sticky materials from all parts of transformer including core and cooling fins ,removal of core assembly & its varnishing ,reassembling after replacement of damaged parts of transformers after repairs ,making all connections & load tap changer connections and filling dehydrated transformer oil off load tap changer and other winding connections from top of the core carefully and all as per manufacturer specifications and as directed by Engineer-In-Charge. (Note- Winding & Transformer oil will be measured & paid separately rest all activity including ovening are deemed to be included with the quoted rate for smooth workingand giving rated voltage of the transformer.All parts /component replaced shall be identical to those specified by OEM) capacity up to 500 KVA transformer.)
All as per item No 52 but 750 and 1000 KVA Transformer complete all as specified and as direcetd.
Material and labour super enameled copper winding wire for rewinding of HV side of transformer as per original gauge incuding insulating material such as cotton tape, packing and sleeves etc varnishing by vacuum impregnation and baking of coil core assembly for copper wound transformer complete all as specified and as direcetd.
Material and labour super enameled copper winding wire for rewinding of LV side of transformer as per original gauge incuding insulating material such as cotton tape, packing and sleeves etc varnishing by vacuum impregnation and baking of coil core assembly for copper wound transformer complete all as specified and as direcetd.
Material and labour for insulated hardware and insulating material \varnishing for HV winding as insulation complete as per manufacturers specifications and standard practice ,complete all as specified & as directed.
Material and labour for insulated hardware and insulating material \varnishing for LV winding as insulation complete as per manufacturers specifications and standard practice ,complete all as specified & as directed.
Material and labour for replacement of silica gel in breathers of transformers of various capacities including taking down of unserviceable silica gel complete all as directed.
Supply and fix breather assembly air tight made out of metal body and transparent acrylic glass suitable for various sizes of transformer.
Supply and fix dial type thermometer for measuring winding /oil temperature of transformer and including taking down old UNSV dial type thermometer from the pocket to safe custody.
Material & labour for maintenance of two pole 11 KV structure including cleaning the parts/removing old rusted nuts,bolts & washers and replacement of jumpers & their thimbles, worn out insulators, greasing with silicon grease, alligning of GOD knife and tightening of GOD parts to ensure smooth meshing & isolation to ensure safety while working ,cleaning & prepration of surfaces of HT steel tubular pole(two pole structure having channels upto 28 Nos of length upto 2.5 mtrs,various angles,clamps,anti-clamping device),complete all as specified and directed.
Taking down serviceable VCB 11 KV after disconnecting of all electrical connection from bus bar , Making suitable size of MS base frame ( as designed by Engr-in-Charg.) for 11 KV HT VCB Dismantling of old and unservicable steel structure cross arms and M&L for fabrication of steel structure cross arms, bracings, supports, clamps and back plates fabricated from strucural steel sections including nuts, bolts, washers,welding, bending cold or hot, drilling holes for bolts, in any shape or size as per site requirement, with & inclusive of one coat red oxide primer & one under coat and one finishing coat of synthetic enamel paint after preperation of surfaces all as soecified, as directed.
Supply and fix in replacement Air Break switch, gang operated triple pole mechanically operated mounted on insulator and steel frame with operating mechanism and locking arrangement worked from ground level for current rating up to 200 amps,11000 volts all including fix and moving contacts, post insulators, operating rod, handle etc complete with necessary connections/ rabbit jumpers with suitable ACSR conducto & thimble with heavy duty alkathine pipe all as specified and as directed. Make:- Jaipuria/Pactil/Atlas.
Supply and fix in replacement DO(drop out ) Fuse assembly,expulsion type , 100 Amp 11 KV complete with necessary connections fittings / jumpers with suitable rabit ACSR conductor all as specified by Engineer in charge Make:- Jaipuria/Pactil/Atlas.
Supply & fix in replacement (HT) lightening arrestor expulsion type complete with all fittings, 65 kilo amps discharge capacity working pressure 11000 volts, distribution class including inter connecting with & including GI Strip 25X4mm. duly insulated on pole upto test point.complete all as specified and directed.(Set of Three)
Supply & fix jointing and testing in replacement HT cable jointing kit for 11 KV(earthed) grade cable heat shrink for end termination out door type joint complete with jointing matrial and accessaries suitable for 3 core XLPE armoured aluminium conductor cable of size 50 sqmm to 95 sqmm complete all as specified and as directed.
All same as per item no. 66 here-in before but cable of size 120 Sqmm to 185 Sqmm.
All same as per item no. 66 here in before but for indoor type end termination joints for cable size of 50 to 95 Sqmm.
All same as per item no. 66 here in before but for indoor type end termination joints 120 sqmm to 185 sqmm
All same as per item no. 66 here-in before but for straight through type joints for 50 to 95 Sqmm cable.
All same as per item no. 66 here-in before but for straight through type joints for 120 to 185 Sqmm cable.
Material & labour for carring out fault detection of HT underground XLPE electrical cable located in 11 BRD station complex with the help of surge generator pulse,cable route tracer,ECHO cable fault detector with high frequency distance calculator (Fault locating van) of MSEDCL (testing division) or equivalent approved vendor,identifing the the fault carring out necessary and additional exacavation in any type of strata for exposing the cable fault , verification of fault/detoriated portion of the cables & fault confirmation , complete all as specified and directed by Engineer-in-Charge. Note : The HT cable passing through dense forest JCB must be rquired for excavation of cable and surface cleaning for fault finding. If fault not located by the contractor within specified time-limit a recovery of an amount of Rs. 5000/- will be recovered per day.
Material and labour for Painting of transformer 11KV/433V Indoor/Outdoor type with two coat of synthetic enamel grey paint after cleaning and scraping of old paint, oil, rust etc complete including writing SM Nos with white synthetic enameled paint complete all as per specified as directed by Engineer - in - charge of the 500 KVA to 1000 KVA Capacity.
All as per item No- 73 but 250 KVA to 200 KVA
All as per item No- 73 but 100 KVA to 25 KVA
Material and labour for manual scraping of old painted surface and providing spray painting as per existing colour with one coat of synthetic enamelled paint of existing colour on outer surface of VCB including writing SM No and MES No. on VCB Body, complete all as directed.
Supply and mild steel plates chequerred channels, square cut or notched ( ordinary and counter sunk) forming holes without any attachment of steel Fe - 410W ( Gde-E-250) quality - B as in florring and is supproting members of required size and section duly cutting and welding with foundation etc all as directed.
Material and labour for cable route indicator fabricated constructed/fabricated on 600x180x40mm Precast RCC/PCC, duly painted with yellow colour synthetic enamel paint complete marking name on MS round disc silver painted duly reinforced in RCC precast route indicator with nomenclature of “HT cable 3x 120 Sq mm/HT cable Joint” in letters with suitable visible front including grouted in ground with PCC 1:4:8 type D-2 complete all as specified and directed.
Supply & laying in trenchs or passing through pipe, fixed to pole or as indicated at site, commissioning and testing XLPE insulated, screened, PVC bedded, galvanised steel strip or wire armoured electric power cable (earthed) with stranded aluminium conductor,11000 volts, grade of size 3 core 95 Sqmm complete all as specified and as directed by Engr-in-Charge including taking out old u/s HT Cable
All as per item No 79 here-in-before above but 3 core 120 Sqmm
All as per item No 79 here-in-before above but 3 core 185 Sqmm ( near HAL pond )
Taking down old existing cable 185/120/95 sqmm 3 core from trench rectified the defects from the store and relaying/reouting of the same complete all as specified and as directed by Engr-in-Charge (Note- HT joints will be measured and paid separately.and excavation and earth work will be measured and paid separately)
Material and labour for cleaning the cable duct at 11 KV sub stn by taking out old existing seviceable 11 KV HT cable 120/95 sqmm 3 core from cable duct by opening of cable duct cover removing the soil/ dust etc ,cleaning the duct /trench and keeping the duct cover on its original position complete all as specified and as directed.
Excavation in trenches carefully for taking out or relaying existing/ new servicable HTUG cable not. exceeding 1.5 mtr wide and not exc 1.5 mtr in depth and getting out in soft/loose soil all as directed.
Returning filling in trenches including spreading, leveling, watering and well ramming in layers not exceeding 25 cm all as specified and as directed.
Removing of surplus soil to a distance not exceeding 50 mtr and depositing in low lavel where directed at a level not exceeding 1.5 mtr above the starting point all as directed.
Material and labour river sand cushioning/filling completely dry in trenches 8cm below the cable and 15 cm abobe the cable and punned down to a total thicknes of sand 18 cm cpmplete all as specified and as directed.
Supply and fixing un-reinforced precast concrete cable covers class HV,type 1 flat of size 300x180x40 mm from excaveted trench under srl item No.1 herein before and staking properly aside for reuse to a distance not existing 50 mtr as directed.
Supply and fix 80mm dia bore galvanized iron tubing, light grade including all fitting for cable protection etc laid in floor or fixed to poles with clamps etc all as specified and directed.Make- Prakesh surya/Swastik/Jindal.
Material and labour for Boring of holes under Road, Pavements, Hard Standing by manually at a depth 0.6 Mtr from top surface complete all as specified and directed.
Material & labour for trenchless parallel boring by using mechanical pneumatic drilling machine under existing road, pavment, hardstanding by trenchless technology(HDD boring/augering) using ultra sounding technique without damaging existing road and making good the disturbed surfaces inculiding supply and insertion of 150 mm dia HDPE Pipe suitable for 0.4Mpa working pressure, not less than 0.6metre below the existing top surface complete all as specified and directed. Notes : Quoted unit rate for this item is deemed to be inclusive of necessary earth work, transportation charges of drilling plants and connected complete tools complete all as specified and directed.
Supply & fix earth continuty conductor or main earthing copper strip of 32X6 mm dia for VCB earthing connection as required all as directed by Engg. in charge. Note :- i) The distance between porcelain insulator will be included .
Supply and fixing testing and installation of 11 KV , RMU - LBSF, CRCA panel of thickness shall not be less than 2mm thick having (02 Incoming and 02 out going) with 11 KV , 630 A - Load Break Switch (LBS) 21 KA for 1 Sec - 04 11 KV HRC fuse set with auto trip system - 02 Earth Switch - 02 Room space heater with thermostat - 04 Heat shrink sleeved copper bus-bar for incoming, Door interlocking mechanism, Tripping mechanism, Epoxy insulator for bus supports, End plate provided at outgoing side for end termination, M S base frame Tentative panel size is around 3000 x 950 x 1840 mm in height and is to prior approval from the Engg-in-Charge. Also, necessary PCC/Civil foundation/ MS Structure steel work and any other alteration/ modification required at site is deemed to be included with the quoted rates. Panel shall having lifing lugs, Detachable opening handle/window for isolator blade position, ON/OFF mechancial indicator and emergency mechancial trip knob. Make : EL-Tech controls/Crompton/ABB/Siemens
Material and labour for grubbing up tree trunk including cutting of trunk portion protruding over ground, digging out roots,earthing chamers,GI strips ,debries,cleaning the area with the help of JCB , filling holes and levelling of the ground & well ramming, stacking of serviceable material at MES yard and removing of serviceable /unserviceable materials to a distance n exc 100 m and clearing site complete all as directed.
Material and labour for Cutting of branches of trees having girth exceeding 5 cm but not exceeding 28 cm in over head conductor span approximate length 30-40 mtr including disposal of unserviceable material to a distance 100 mtr for removing/ cleaning over head ACSR conductor around 3 mtrs,complete all as directed. Note : T &P for above mentioned work included in quoted rate.
Material and labour for cleaning and preparation of surfaces of angle iron by emmery paper and applying two coats of synthetic enamel paint over and including one coat of zinc oxide primer to angle iron and two coats of aluminium paint to chain link fencing around the transformer yard of size 5 mtrs x 5 mtrs with & including applying two coats of exterior cement base paint to external surfaces of transformers platform including stairs,complete all as specified and directed.
Restringing of existing HT overhead line of copper/ACSR conductor after opening of binding wire from insulator and bringing the sag within permissible limit rebinding the same with insulator with 16 SWG aluminium wire/suitable copper wire all including renewal of jumpers by providing heavy duty alkathine pipe of approved quality, reconnecting the service connections after cleaning the carbon and foreign material complete all as directed. (Note : All the tree branches obstructing to the O.H line shall be trimmed up to 3 mtr away from the O.H line,complete all as directed. Unit rate quoted shall be deemed to be inclusive of charges for the trimming of trees.)
Supply and fix in replacement of post top insulator porcelain, vitreous, white, brown or green insulator for 11000 volts grade ,complete all as directed.
Supply and laying stone aggregate 40 mm grade including lime powder ,complete all as directed.
Material & labour for the arranging the crane/hydra for lifting the transformer/DG set from the existing place by disconnecting HV/LV supply and earthing connectionsand shifting to the another location /platform and connecting HV/LV supply and earthing connections ,complete all as directed.
Supply & fix in replacement of under voltage relay duly wired using the requisite size copper cable& lugs CT/PT wiring, trip circuit connection ,complete all as specified and directed.
Supply and laying High voltage insulation electric mat 2.5.0 mm thick fot voltage up to 11 KV for electrical pupose as per IS IS-15652-2006 (superseding IS 5424) suitable for electrical shock safty of of sizes 2m x 1m complete all as directed.
Material and labour for removal of green vegetation from substations, pumphouse area by spraying the weedicide chemical Glufosinate ammonium 13.5% W/W SL using spray pump for burning of the grass on 500 Sq M Area including removing the vegetation from its roots by deploying labours and necessary T&P ,levelling &ramming the surface making agregates devoid of vegetation complete from existing place & depositing the vegetation away from the places , complete all as specified and directed.
Note : The amount against Schedule of Credit on Page No. 40 shall be deducted from the total amount quoted against Sch 'A' while deriving lum Sum for Acceptance.
K R Electricals (BID ID -3508491)
SHRI SULAI ELECTRICALS (BID ID -3509988)
M/s ASPIRE ENGINEERING ENTERPRISES (BID ID -3510078)
Bidder Name
SHRI SULAI ELECTRICALS
K R Electricals
DIAMOND ENTERPRISES
M/s ASPIRE ENGINEERING ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
PS80728.pdf
Tender Documents • 1.41 MB
BOQ_830773.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .