| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 LAccepted-Finance | ₹9.7 L | L1 | Accepted-Finance L1 |
| 2 | L2₹9.8 LRejected-Finance | ₹9.8 L | L2 | Rejected-Finance L2 |
| 3 | L3₹9.9 LRejected-Finance | ₹9.9 L | L3 | Rejected-Finance L3 |
| 4 | L4₹10.2 LRejected-Finance | ₹10.2 L | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | KAMARAJ L1 | ARAVIND MUGESH L2 | SASIKUMAR A L3 | venkadesh L4 |
|---|---|---|---|---|---|---|---|
| 1.00Providing Cement Concrete Road at Oorani East Street in Anaikulam Village and Panchayat in Kadayanallur Panchayat Union | |||||||
| 2.00 | Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for Corewall foundation etc., complete. | 7.2 | cum | 149 ₹1,072.80 | 150 ₹1,080 | 160 ₹1,152 | 200 ₹1,440 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete. | 69.36 | cum | 5,255 ₹3.6 L | 5,300 ₹3.7 L | 5,340 ₹3.7 L | 5,465 ₹3.8 L |
| 4.00 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete. | 32 | sqm | 195 ₹6,240 | 200 ₹6,400 | 230 ₹7,360 | 290 ₹9,280 |
| 5.00 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete. | 9.2 | cum | 5,890 ₹54,188 | 5,900 ₹54,280 | 5,950 ₹54,740 | 6,140 ₹56,488 |
| 6.00 | Supplying and filling with Red gravel from an approved quarry with an initial lead of 1km including all cost and conveyance and all labour charges for watering, ramming etc., complete. | 64.56 | cum | 285 ₹18,399.60 | 290 ₹18,722.40 | 315 ₹20,336.40 | 382 ₹24,661.92 |
| 7.00 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal top Finish using Trowel Machine with necessary Genset Arrangements including cost and conveyance of all materials, watering, curing and compacting and all other incidental charges etc., | 52.27 | cum | 7,290 ₹3.8 L | 7,300 ₹3.8 L | 7,350 ₹3.8 L | 7,480 ₹3.9 L |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount | 1,48,578 ₹1.5 L | 1,49,339 ₹1.5 L | 1,50,868 ₹1.5 L | 1,55,142 ₹1.6 L |
Tender Value
₹10.3 L
EMD Value
₹10,330
Closing Date
26 Dec 2025, 4:00 pmClosed
BDO
BDO,KADAYANALLUR
Providing Cement Concrete Road at Oorani East Street in Anaikulam Village and Panchayat in Kadayanallur Panchayat Union, Tenkasi District under Mines and Minerals Fund 2023-24 (EST.AMT- 10.33L)
2025_RDTN_634434_1
AnaiPT/001/2025
Open Tender
Civil Works
180 days
KADAYANALLUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,330
19 Feb 2026
19 Dec 2025
26 Dec 2025
19 Dec 2025
26 Dec 2025
19 Dec 2025
Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for Corewall foundation etc., complete.
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete.
Supplying and filling with Red gravel from an approved quarry with an initial lead of 1km including all cost and conveyance and all labour charges for watering, ramming etc., complete.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal top Finish using Trowel Machine with necessary Genset Arrangements including cost and conveyance of all materials, watering, curing and compacting and all other incidental charges etc.,
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_759151.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
BOQ_759151.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid