| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Finance H NO 344 HARGOBIND COLONY BAHADURGARH DISTT PATIALA | BAHADURGARH | PATIALA | ₹1.2 L | L1 | Admitted-Finance |
| 2 | L2₹1.3 L+₹13,933.05 (12.0%)Admitted-Finance 01 ENTERPRISES | ₹1.3 L+₹13,933.05 (12.0%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Anmol Construction Company L1 | RUPINDER SINGH CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundation of structure as per drawing and technical specification, including setting out construction of shoring and bracing removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil.Depth 3 m to 6 m. | 1 | cum | 89.85 ₹89.85 Lowest | 107.87 ₹107.87 |
| 2.00 | Laying plain cement concrete 1:3:6 (M- 10) nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete in all respects. | 1 | cum | 4,891.66 ₹4,891.66 Lowest | 5,480.34 ₹5,480.34 |
| 3.00 | Plain/RCC in sub structure complete as per drawing and technical Specifications. PCC Grade M25. Height upto 5m using concrete mixer | 1 | cum | 7,065.19 ₹7,065.19 Lowest | 7,915.44 ₹7,915.44 |
| 4.00 | Plain/RCC in sub structurecomplete as per drawing and technical Specifications. PCC Grade M20. Height upto 5m using concrete mixer | 1 | cum | 6,617.46 ₹6,617.46 Lowest | 7,413.83 ₹7,413.83 |
| 5.00 | Plain/RCC in sub structurecomplete as per drawing and technical Specifications. PCC Grade M15. Height upto 5m using concrete mixer | 1 | cum | 6,048.6 ₹6,048.6 Lowest | 6,776.51 ₹6,776.51 |
| 6.00 | PCC 1:4:8 with Stone Ballast 40 mm gauge using concrete mixer volume metric type | 1 | cum | 4,929.48 ₹4,929.48 Lowest | 5,522.71 ₹5,522.71 |
| 7.00 | Centering and Shuttering for face of walls, partitions, retaining walls and the like(vertical or battering), including attached pilasters, buttresses etc when curved. | 1 | sqm | 502.14 ₹502.14 Lowest | 562.57 ₹562.57 |
| 8.00 | Supplying, Fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specifications | 1 | tonne | 77,831.62 ₹77,831.62 Lowest | 87,198.16 ₹87,198.16 |
| 9.00 | Providing, Stringing out, cutting, Jointing and testing of ISI Marked D.I. Pipe (S&S) as per IS 8329 K7 and laying the same in trenches to correct alignment and gradients, jointed with rubber tyton joints fitted complete including all cartage, cost of rubber ring. | 1 | Meter | 7,741.4 ₹7,741.4 Lowest | 8,673.02 ₹8,673.02 |
Tender Value
₹1.5 L
EMD Value
₹3,000
Closing Date
5 Jun 2026, 10:30 amClosed
Executive Engineer
Executive Engineer, Bathinda Canal and Ground water Division, Bathinda
ESTIMATE FOR CONSTRUCTION OF OUTLET 306790/R OF BATHINDA BRANCH
2026_WR_166103_1
05/22A/2026-27
Open Tender
Civil Works - Canal
Item Rate
Bathinda
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹3,000
8 Jun 2026
15 Apr 2026
5 Jun 2026
15 Apr 2026
5 Jun 2026
15 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Earth work in excavation of foundation of structure as per drawing and technical specification, including setting out construction of shoring and bracing removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil.Depth 3 m to 6 m. | - | cum | - | - |
| - | Laying plain cement concrete 1:3:6 (M- 10) nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete in all respects. | - | cum | - | - |
| - | Plain/RCC in sub structure complete as per drawing and technical Specifications. PCC Grade M25. Height upto 5m using concrete mixer | - | cum | - | - |
| - | Plain/RCC in sub structurecomplete as per drawing and technical Specifications. PCC Grade M20. Height upto 5m using concrete mixer | - | cum | - | - |
| - | Plain/RCC in sub structurecomplete as per drawing and technical Specifications. PCC Grade M15. Height upto 5m using concrete mixer | - | cum | - | - |
| - | PCC 1:4:8 with Stone Ballast 40 mm gauge using concrete mixer volume metric type | - | cum | - | - |
| - | Centering and Shuttering for face of walls, partitions, retaining walls and the like(vertical or battering), including attached pilasters, buttresses etc when curved. | - | sqm | - | - |
| - | Supplying, Fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specifications | - | tonne | - | - |
| - | Providing, Stringing out, cutting, Jointing and testing of ISI Marked D.I. Pipe (S&S) as per IS 8329 K7 and laying the same in trenches to correct alignment and gradients, jointed with rubber tyton joints fitted complete including all cartage, cost of rubber ring. | - | Meter | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
BOQ_337064.xls
BOQ • 0.28 MB
TB01.xls
Additional Documents • 0.03 MB
crgdm13.pdf
PDF • 0.37 MB
crgdm12.pdf
PDF • 0.37 MB
crgdm11.pdf
PDF • 0.37 MB
crgdm10.pdf
PDF • 0.37 MB
crgdm9.pdf
PDF • 0.49 MB
crgdm8.pdf
PDF • 0.49 MB
crgdm7.pdf
PDF • 0.49 MB
01.rar
PDF • 0.51 MB
crgdm6.pdf
PDF • 0.43 MB
crgdm5.pdf
PDF • 0.43 MB
crgdm4.pdf
PDF • 0.43 MB
crgdm3.pdf
PDF • 0.43 MB
crgdm2.pdf
PDF • 0.43 MB
crgdm1.pdf
PDF • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .