| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LAccepted-AOC | ₹1.1 L | L1 | Accepted-AOC L1 Accept |
| 2 | L2₹1.1 LRejected-Finance | ₹1.1 L | L2 | Rejected-Finance L2 Reject |
| Sl No | Description | Qty | Unit | S. KRISHNAMOORTHY L2 | SELVAKUMAR CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00Renovation of School Building RCC Roof at Kothamangalam PUES in Kothamangalam Panchayat | |||||
| 2.00 | Dismantling the existing one course of Pressed tile roof finish in cement mortar and cleaned away from the site including cost of all labour charges etc., complete.(Ref.:- PWD SOR 2024-2025, Annex III- Rates of works - Unique Code- W-0038 (Page-28)) | 43.95 | Sqm | 30 ₹1,318.50 | 25.5 ₹1,120.73 |
| 3.00 | Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers (50% New Tiles) | 54.07 | Sqm | 1,130 ₹61,099.10 | 1,120 ₹60,558.40 |
| 4.00 | Painting old iron work with two finishing coats of synthetic enamel ready mixed paint including cost and conveyance of all materials to site including all labour charges for filling etc complete. | 37.08 | Sqm | 175 ₹6,489 | 166.5 ₹6,173.82 |
| 5.00 | Painting two coats with approved Black Oxide for Black board including cost and conveyance of all materials to site including all labour charges for filling etc complete. | 5.4 | Sqm | 158 ₹853.20 | 155 ₹837 |
| 6.00 | Provision for Bala Paint including cost and conveyance of all materials to site including all labour charges for filling etc complete. | 28.8 | Sqm | 755 ₹21,744 | 749.5 ₹21,585.60 |
| 7.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 1 & 6 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | Nos | 16,470.68 ₹16,470.68 | 16,249.6 ₹16,249.60 |
Tender Value
₹1.1 L
EMD Value
₹1,120
Closing Date
17 Feb 2026, 3:00 pmClosed
Bdo,Thiruvarankulam
Pt.union Office,Thiruvarankulam
Renovation of School Building RCC Roof at Kothamangalam PUES in Kothamangalam Panchayat
2026_RDTN_654711_1
Tvk/BMS/Work--7
Open Tender
Civil Works
Thiruvarankulam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1,120
24 Mar 2026
12 Feb 2026
17 Feb 2026
12 Feb 2026
17 Feb 2026
12 Feb 2026
Renovation of School Building RCC Roof at Kothamangalam PUES in Kothamangalam Panchayat
Dismantling the existing one course of Pressed tile roof finish in cement mortar and cleaned away from the site including cost of all labour charges etc., complete.(Ref.:- PWD SOR 2024-2025, Annex III- Rates of works - Unique Code- W-0038 (Page-28))
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers (50% New Tiles)
Painting old iron work with two finishing coats of synthetic enamel ready mixed paint including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Painting two coats with approved Black Oxide for Black board including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Provision for Bala Paint including cost and conveyance of all materials to site including all labour charges for filling etc complete.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 1 & 6 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.76 MB
Tvk_doc--7.pdf
Tender Documents • 0.14 MB
BOQ_785025.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid