Loading…
Loading…
Tender Value
₹19.5 L
EMD Value
₹39,040
Closing Date
30 Jun 2026, 4:00 pmDue today
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer Jal Shakti PHE Division Kathua
Executive Engineer Jal Shakti PHE Division Kathua
BOQ
2026_PHE_313158_10
enit 21 of 2026-27
Open Tender
Civil Works - Water Works
30 days
Kathua
SBD
2 documents required · 2 mandatory
₹1,000
Executive Engineer Jal Shakti PHE Division Kathua
₹39,040
20 Jun 2026
20 Jun 2026
1 Jul 2026
20 Jun 2026
30 Jun 2026
20 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/by mechanical means including stacking of pipes within 50 meters lead as per direction of Engineer in charge : Above 40 mm nominal bore | 60 | m | 121.65 | ₹7,299 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavatedearth as directed:
All kinds of soil. | 86.4 | Cum | 479.3 | ₹41,411.52 |
| 3 | Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) 65 mm dia (M) | 180 | m | 1,018.05 | ₹1,83,249 |
| 4 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work. 65 mm dia (M) G.I. pipes | 60 | m | 80.3 | ₹4,818 |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of
foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 73.44 | Cum | 180.55 | ₹13,259.59 |
| 6 | Providing and fixing C.I. sluice valves (with cap) complete with bolts, nuts, rubber insertions etc. (the tail pieces if required will be paid separately) 65 mm dia. | 1 | No | 3,500 | ₹3,500 |
| 7 | Welding, including transportation of plant at site etc. complete By electric plant | 1,538.6 | Cm | 6.2 | ₹9,539.32 |
| 8 | Knitted wire crates of size (6 x 1.50 x 1.50 m) including transportation to site including B.A wire (72 no crates) | 4,608 | Kg | 77 | ₹3,54,816 |
| 9 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge All kinds of soil : | 663 | Cum | 187.3 | ₹1,24,179.9 |
| 10 | Hand-packing stones in wire-crates; excluding cost of crates and stones | 972 | Cum | 371.15 | ₹3,60,757.8 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_1013490.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid