| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹1.1 Cr+₹7.6 L (7.21%)Rejected-Finance 201 MAJNAWAN FAIZABAD SADAR FAIZABAD 224001 | FAIZABAD | AYODHYA | UTTAR PRADESH | 224001 | ₹1.1 Cr+₹7.6 L (7.21%) | L2 | Rejected-Finance HIGH RATE BIDDER |
Tender Value
Refer Docs
EMD Value
₹2.7 L
Closing Date
26 Oct 2021, 2:00 pmClosed
SE NINTH CIRCLE I W BAHRAICH
OFFICE OF SE NINTH CIRCLE I W BAHRAICH
CONSTRUCTING INLET HEAD REGULATOR AT KM 16.640 OF PARSA DEHARIYA TILAKPUR MARGINAL EMBANKMENT
2021_UPIDC_631998_2
02/SE-IX/2021-22
Open Tender
Civil Works
Item Rate
90 days
BHINGA SHRAWASTI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹2.7 L
1 Feb 2022
18 Oct 2021
26 Oct 2021
18 Oct 2021
26 Oct 2021
18 Oct 2021
Amount
E/W in digging foundation in all type of soil including all lead & lift with disposal of surplus earth for proper completion of work.
E/W making x-bundh for stoping river water by extra available earth from digging foundation&cutting existing section in all type of soil including all leads&lifts etc for proper completion of work.
Laying plain cement concrete in 1:3:6 (M-10) in foundation with 20 to 40 mm size Haldwani natural Shinghle& Hamipur coarse sand having F.M not less than 2.0 including cost of all material, labour , T&P etc required for proper completion of work.
Laying C.C. 1:2:4 using 4.75 mm to 20 mm size crushed kabrai stone grit with Hamipur coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc.required for proper completion of work.
Centering and Shuttering including cost of all material ,labour and T & P etc for proper completion of the work.
Ist class brick work in 1:4 Cement Motor with hamipur Coarse sand of F.M. not less than 2.0 including cost of all material, labour and T&P etc.required for proper completion of work.
Supply and lyaying Coarse sand graded filtter including cost of all material, labour & T&P etc required for proper completion of work.
Supply and lyaying Pea Gravel graded filtter including cost of all material, labour & T&P etc required for proper completion of work.
Supply and lyaying Haldwani Natural Shingle 20-40 mm graded filtter including cost of all material, labour & T&P etc required for proper completion of work.
Supplying and laying Ahiraura stone bolder of 20 - 40 kg laid in G.I. Wire Crate For lounching apron Including cost of all material, labour and T&P etc. required for proper completion of work.but excluding cost of G.I. Wire Crate.
Supplying and laying Ahiraura stone bolder of 20 - 40 kg in Slope Pitching Including cost of all material, labour and T&P etc. required for proper completion of work.
Supplying G.I. Wire Crate Size 2.0x1.00x0.80 m, Mesh 200x200 mm with 8 SWG Wire Including all taxes, cost of all material, labour and T&P etc. required for proper completion of work.
Deep struck/flush Pointing in 1:2 cement mortor with coarse sand Including cost of all materials,labour and T&P etc for proper completion of work.
Laying R.C.C.Hume Pipe(NP-3)1200 mm dia Including cost of all materials,labour and T&P for proper completion of work.
Supply and Fixing P.V.C. Pipe100 mm dia Including cost of all materials,labour and T&P for proper completion of work.
Providing &Fixing 0f 1200 mm cost Iron Flap Gate single faced,upward opening type Including Instalation,loading,unloading & freight at site.
12 MM thick cement plaster in 1:4 Cement mortor with hamipur Coarse sand of F.M. not less than 2.0 Including cost of all materials,labour and T&P etc for proper completion of work.
E/W For Recuipment of embankment section by dismenteled X- bundh in all type of soil including all leads&lifts etc for proper completion of work.
supply and Fixing sign board on angle iron frame 40x40x6 mm , 25x3 mm flat iron bracing 18 SWG MS sheet with one coat of red oxide primer with letter writting i/c cost of all material labour T&P etc. required for proper completion of work .
Ist class Brick on edge pitching in 1:3 CM. with Hamirpur coarse sand having FM not less than 2.00 Including cost of all materials,labour and T&P etc for proper completion of work.
Boring with 150 mm casing pipe including lowering of assembly and extracting casing pipe with T&P and equipment upto 30 m.
Hiring charges of 5 H.P. Disel Pump / Gen set including operator and P.O.L. for Running Hours.
FOR SITE OFFICE E/W in digging foundation(for building work) in all type of soil including all lead & lift with disposal of surplus earth for proper completion of work.
R.C.C.work in 1:1.5:3 with 4.75 - 20 mm.size crushed grit , coarse sand F.M. not less than 2.0 including cost of all material ,labour and T & P for proper completion of the work.
Centering and Shuttering for R.C.C.work including cost of all material ,labour and T & P for proper completion of the work.
Supplying & placing of Reinforcement I/C cutting,bending with cost of binding wire etc all for completion of work.
Ist. ClassBrick Work in 1:6 Cement Mortar with coarse sand including cost of all material ,labour and T & P for proper completion of the work.(for building work)
Ist. ClassBrick Work(thickness below 12c.m.) in 1:4 Cement Mortar with coarse sand including cost of all material ,labour and T & P for proper completion of the work.(for building work)
Providing and laying 15 mm Cement Plaster with 1:6 cement and coarse sand including cost of all material ,labour and T & P for proper completion of the work.
Providing and laying 12 mm Cement Plaster with 1:6 cement and coarse sand including cost of all material ,labour and T & P for proper completion of the work.
Supplying & Fixing Flush 32 mm thick Doors with all fixtures & fastenings including fixing of wooden cleats and stoper and I/C fixing and adjustment of hinges,bolt,locks etc.
25 mm thick c.c. 1:2:4 with 4.75 - 20 mm.size crushed grit , coarse sand F.M. not less than 2.0 including cost of all material ,labour and T & P for proper completion of the flooring finished with floating coat of neat cement.
Finishing wall with water proofing cement paint of approved make such as super snowcem, of required shade on new wall surface (two coat) over one coat cement primer I/C all cost of materials ,labour and T&P etc .
Distempering with dry distemper of approved brand (two coats) over one priming coat of whiting on new surface after throughly brushing the surface free from dropping and other forgein mater I/C preparing the surface even and sand paper smooth I/C all cost of materials ,labour and T&P etc.
Dry Earth filling including manual compaction,dressing with 30.0 M lead &1.5 M lifts with proper completion of work.
Fabrication of mild steei/Iron work in grill,railing,door and window Frames I/C cutting, drilling,welding/riviting and hinges,where necessary & fixing in position I/C all cost of material,labour,T&P etc required for completion of work with one coat red oxide primer.
Supplying & Fixing 4.0 mm thick Glass panel including putty,nails/C all cost of materials ,labour and T&P etc .
M/S V.K. CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .