| 1 | 1₹12.3 LAccepted-Finance M 18 HOUSING BOARD UNIT MADAYANKUTTAI POST METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | 1 | Accepted-Finance satisfied | |
| 2 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹14,600
Closing Date
15 Jun 2022, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM AOH 2022 2023 Unit II Complete overhaul of APH B Side and other related works
2022_EB_234741_1
CE / MTPS-I / SE / M-I / BM / OT. 146 / 2022-23
Open Tender
Power/Energy Projects/Products
Works
20 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹14,600
Yes
18 Jun 2022
1 Jun 2022
16 Jun 2022
1 Jun 2022
15 Jun 2022
1 Jun 2022
Amount
Opening of all manhole doors, and closing manhole doors after completion of work including changing of asbestos ropes and clamps in the doors.
Removal of ash deposit around guide bearing area and inside the APH.
Charges for cutting and removing of rigid stoppers checking and correction of rotor leveling, checking and correction of critical distance between guide bearing housing and housing sleeve and fixing, welding the rigid stoppers and provide shim packing in between guide bearing housing and permanent stoppers.
Charges for leveling and aligning of the radial sector plates and axial seal plates with respect to the rotor axis
Charges for removal of worn-out/damaged bypass seals (complete assembly CE & HE) fixing and positioning properly with new seals. (Including transporting of new materials from stores to site and scraps from site to Stores).
Charges for finding the high point in 'T' bar, adjusting the bypass seals to correct clearance and clamping properly in both hot and cold ends of APH.
Charges for replacing of rotor post seal at hot end and cutting of sealing ring segments, cutting of tracking rod stuffing boxes, kawool packing and patch up sealing ring segments and leak arresting works around the guide bearing area and fixing of rotor post seals and rectification works on the eroded portions of spool seal assembly.
Overhaul of APH soot blower mechanism including changing the bearings, soot blowers spray nozzles, if necessary and changing of lubrication etc.
Inspection of support bearing by removing the cover, drain oil, cleaning and checking level etc.
Charges for removal of worn-out radial seal in both cold end and hot end (complete assembly) and re fixing with new HT bolts & nuts and positioning. (Including transporting of new materials from Stores to site and scraps from site to stores).
Charges for removal of worn-out axial seal in both cold end and hot end (complete assembly) and re fixing with new HT bolts & nuts and positioning. (Including transporting of new materials from Stores to site and scraps from site to stores).
Charges for fixing up straight edge after finding the low point of sector plate, adjusting the radial seals to correct clearance and clamping the seals in both hot end and cold end of APH.
Charges for fixing up straight edge after finding the low point of axial seal plate, adjusting the axial seals to correct clearance and clamping the seals properly.
Charges for removal of existing ‘T’ bars, fixing new / old 'T' bar and adjusting to correct radius and clamping properly.
Charges for cutting and removal of bypass seal fixing angle and fixing the same /new after carried out rectification works at the center section fixing plate with correct radius.
Charges for transporting of 6mm M.S./ Checkered plates from Central Stores/MTPS to Boiler area, cutting into required size, leading, lifting, positioning on the eroded portions of the APH housing and welding the same
Charges for reconditioning / renewal of Axial seal plate to sector plate seal, Kawool retainer box, link adjuster box.
Cleaning of steam coil Air pre heater.
Water washing of Air pre heater.
Removal of cold end baskets from its position, leading to the adjacent area of Air Pre heaters, dry cleaning, high pressure jet water cleaning and then air cleaning of the cold end baskets, putting the heating elements after rectification of cold end diaphragm and cold end gratings.
Charges for Rectification of cold end heating element door seating flange at the rotor shell and refitting of cold end heating elements doors.
Charges for Providing new flange for the Axial seal plate to sector plate seal adjusted door.
Charges for Patch up work on the eroded portion of the cold end Diaphragm plate.
Charges for Rectification of Hot end stationary Spool and renewing the retainer ring, Packing rings and etc.,
Charges for Providing platform and dismantling after completion of work.
Fixing new protection cover for the soot blower pipe, Renewal of eroded guard pipe and Renewal of new pipe.
Dismantling & cleaning the lube oil lines of Guide bearing & Support Bearings with air & steam and reassembling.
Rectification of the Air Pre heater eroded portion of the center section of the Guide bearing.
Removal of accumulated ash at center section connecting plate area of APH.
Cutting gas
Supertherme E7018 Welding rod rate.
Welding Rod
Consumables and T & Ps for item S.No.1 to 29.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .