| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹87,968.80Accepted-AOC | ₹87,968.80 | L1 | Accepted-AOC Lowly Quated |
| 2 | L2₹95,997.26+₹8,028.46 (9.13%)Rejected-AOC | ₹95,997.26+₹8,028.46 (9.13%) | L2 | Rejected-AOC Highly Quated |
| Sl No | Description | Qty | Unit | Senthamizhan L1 | Manikandan.M L2 |
|---|---|---|---|---|---|
| 1.00Construction of Compost Pit at Jayankondan Panchayat | |||||
| 2.00 | Earthwork excavation depositing on bank with initial lead and lift except hard rock requiring blasting as per ss20B for foundation etc. | 30.64 | Cum | 220 ₹6,740.8 Lowest | 260 ₹7,966.4 |
| 3.00 | Sand Filling with good river sand including cost and conveyance of all materials to site and all labour charges etc complete | 0.95 | Cum | 1,900 ₹1,805 Lowest | 2,384 ₹2,264.8 |
| 4.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, and curing etc complete | 0.95 | Cum | 5,000 ₹4,750 Lowest | 6,224 ₹5,912.8 |
| 5.00 | Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete | 6.97 | Cum | 6,000 ₹41,820 Lowest | 6,050 ₹42,168.5 |
| 6.00 | Plastering in cement mortar 1:5 mix using 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete | 69.22 | Sqm | 200 ₹13,844 Lowest | 258 ₹17,858.76 |
| 7.00 | Painting two coats Emulsion paint over cement plastered wall including cost and conveyance of all materials to site and all labour charges etc complete | 14 | Sqm | 235 ₹3,290 Lowest | 263 ₹3,682 |
| 8.00 | Provision for Photo charges | 1 | Nos | 300 ₹300 Lowest | 500 ₹500 |
| 9.00 | Provision for Name board charges | 1 | Nos | 2,000 ₹2,000 | 1,000 ₹1,000 Lowest |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} | 1 | GST Amount | 13,419 ₹13,419 Lowest | 14,644 ₹14,644 |
Tender Value
₹1 L
EMD Value
₹1,000
Closing Date
11 Aug 2026, 3:00 pmClosed
Block Developemnt Officer (BP),Melbhuvanagiri
Block Developemnt Officer (BP),Melbhuvanagiri
Construction of Community Composit Pit at Jayankondan Panchayat
2026_RDTN_689150_2
A3/1050/2026 GF(BP) and SBM (G) PH-II 2026 - 2027
Open Tender
Civil Works
Item Rate
90 days
Melbhuvanagiri
As Per Tender
7 documents required · 7 mandatory
₹0
₹1,000
Yes
Panchayat Union, Melbhuvanagiri
1 Sept 2026
28 Jul 2026
12 Aug 2026
28 Jul 2026
11 Aug 2026
28 Jul 2026
31 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Compost Pit at Jayankondan Panchayat | - | - | - | - |
| 2 | Earthwork excavation depositing on bank with initial lead and lift except hard rock requiring blasting as per ss20B for foundation etc. | 30.64 | Cum | - | - |
| 3 | Sand Filling with good river sand including cost and conveyance of all materials to site and all labour charges etc complete | 0.95 | Cum | - | - |
| 4 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, and curing etc complete | 0.95 | Cum | - | - |
| 5 | Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete | 6.97 | Cum | - | - |
| 6 | Plastering in cement mortar 1:5 mix using 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete | 69.22 | Sqm | - | - |
| 7 | Painting two coats Emulsion paint over cement plastered wall including cost and conveyance of all materials to site and all labour charges etc complete | 14 | Sqm | - | - |
| 8 | Provision for Photo charges | 1 | Nos | - | - |
| 9 | Provision for Name board charges | 1 | Nos | - | - |
| 10 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} | 1 | GST Amount | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
technicalbitjayankondan.pdf
Tender Documents • 0.21 MB
BOQ_828388.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .