| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹96.3 Cr Construction of Basement Plus Ground Floor Plus 10 Storied Building for State of the Art, Director General, GSI Office at Plot No. GN-40, Sector-V, Salt Lake, Kolkata. including Civil, Electrical & Mechanical and Horticulture works/Services on EPC Basis (Balance Work) | Construction of Basement Plus Ground Floor Plus 10 Storied Building for State of the Art, Director General, GSI Office at Plot No. GN-40, Sector-V, Salt Lake, Kolkata. including Civil, Electrical & Mechanical and Horticulture works/Services on EPC Basis (Balance Work) | ₹96.3 Cr | L1 |
| 2 | L2₹99.4 Cr+₹3.2 Cr (3.30%) Construction of Basement Plus Ground Floor Plus 10 Storied Building for State of the Art, Director General, GSI Office at Plot No. GN-40, Sector-V, Salt Lake, Kolkata. including Civil, Electrical & Mechanical and Horticulture works/Services on EPC Basis (Balance Work) | Construction of Basement Plus Ground Floor Plus 10 Storied Building for State of the Art, Director General, GSI Office at Plot No. GN-40, Sector-V, Salt Lake, Kolkata. including Civil, Electrical & Mechanical and Horticulture works/Services on EPC Basis (Balance Work) | ₹99.4 Cr+₹3.2 Cr (3.30%) | L2 |
| 3 | L3₹109.7 Cr+₹13.4 Cr (14.0%) Construction of Basement Plus Ground Floor Plus 10 Storied Building for State of the Art, Director General, GSI Office at Plot No. GN-40, Sector-V, Salt Lake, Kolkata. including Civil, Electrical & Mechanical and Horticulture works/Services on EPC Basis (Balance Work) | Construction of Basement Plus Ground Floor Plus 10 Storied Building for State of the Art, Director General, GSI Office at Plot No. GN-40, Sector-V, Salt Lake, Kolkata. including Civil, Electrical & Mechanical and Horticulture works/Services on EPC Basis (Balance Work) | ₹109.7 Cr+₹13.4 Cr (14.0%) | L3 |
| Sl No | Description | Qty | Unit | MACKINTOSH BURN LIMITED L2 | MUKHERJEE ASSOCIATES INFRA PRIVATE LIMITED L1 | NARAYAN KUMAR INFRASTRUCTURE PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|
| 1.1 | Basements for parking and other services along with foundation (of any type as per soil strata & any level of ground water table) complete work in all respect as per scope of work & measured as Plinth (Balance Work)Area as per CPWD guidelines. | 2,629 | Sqm | 19,371 ₹5,09,26,359 | 15,000 ₹3,94,35,000 | 13,529 ₹3,55,67,741 Lowest |
| 1.2 | Balance Super Structure complete in all respect as per scope of work & measured as Plinth Area as per CPWD guidelines including substation building , airconditioning plant , pump room and Furniture work. | 28,377 | Sqm | 27,480 ₹77,97,99,960 | 26,600 ₹75,48,28,200 | 18,300 ₹51,92,99,100 Lowest |
| 2 | Development work to the project as per scope of work complete which broadly includes:
a. Roads, paths, covered path ways, water-supply system, sewerage system i/c waste water recycling plant, waste management system, parking in basement , Drainage system & Rain water Harvesting, Stainless Steel (316 L Grade) Entrance and Exit Gate, Boundry wall, with Guard Room having toilet facility for one person with Access control system, RCC service duct etc.
b. Landscaping of open land area in entire plot of GN-40, all horticulture works inside and outside the building at all levels.
c. C/o Utility services – underground tank, fire under ground tank, all E&M equipments for electric sub-station and DG Set, Air Conditioning Plant, street light, BMS system, HVAC system, solar panels with solar trees, STP and water treatment plant as per scope of work, specifications and attached drawing.
d. All approvals from Local/ Statutory Bodies including Land use change.
e. Running and maintenance of all Civil, E & M services and Horticulture Work for entire plot of GN – 40 during defect liability period of 36 months from actual date of completion i/c supplying of required manpower and consumable materials as per norms. | 1 | Job | 15,46,04,817 ₹15,46,04,817 | 14,63,00,000 ₹14,63,00,000 Lowest | 50,20,00,000 ₹50,20,00,000 |
| 1 | Providing comprehensive maintenance for Two years for keeping Civil , E & M and Horticulture works and services running and functional after completion of the defect liability period as enshrined in respective clause of GCC 2024 for EPC projects, including deputing maintenance staff of required trades & supplying required consumables etc. as per CPWD maintenance manual and norms of OEM suppliers, complete job in all aspects and as per the direction of Engineer-in-charge | 1 | Job | 90,00,000 ₹90,00,000 Lowest | 2,20,00,000 ₹2,20,00,000 | 4,00,00,000 ₹4,00,00,000 |
Tender Value
₹112.8 Cr
EMD Value
₹1.2 Cr
Closing Date
16 Jun 2026, 3:00 pmClosed
EE&SM( C) -2
EE SM(c)-II, Rajarhat, Mezanine Floor, 1st MSO Building, Nizam Palace, 234/4, A.J.C. Bose Road, Kol
Construction of Basement Plus Ground Floor Plus 10 Storied Building for State of the Art, Director General, GSI Office at Plot No. GN-40, Sector-V, Salt Lake, Kolkata. including Civil, Electrical & Mechanical and Horticulture works/Services on EPC Basis (Balance Work)
155924
01/SE & PD/Rajarhat (Kol)/CPWD/2026-2027
OPEN
Civil Works - Buildings
NCB
9 months
Kolkata, West Bengal
1 document required · 1 mandatory
₹1.2 Cr
Not Applicable
16 Jun 2026
25 May 2026
16 Jun 2026
16 Jun 2026
29 May 2026
stage.html
html • 0.07 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT01SEPDRAJARHATCPWD202627.pdf
document • 23.18 MB
Corrigendum-4.pdf
document
Corrigendum-3.pdf
document
Corrigendum-2.pdf
document
FIRE FIGHTING.pdf
document
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .