Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.9 LRejected-Finance | L1 | Rejected-Finance EMD REFUND ONLY | |
| 2 | L2₹16.9 L+₹99,470.40 (6.26%)Rejected-Finance | L2 | Rejected-Finance EMD REFUND ONLY | |
| 3 | L3₹17.0 L+₹1.1 L (6.72%)Rejected-Finance | L3 | Rejected-Finance EMD REFUND ONLY | |
| 4 | L4₹17.1 L+₹1.2 L (7.59%)Rejected-Finance GALI NO 1 VILLAGE BAGTHALA TEHSIL BAWAL DISTT REWARI 123501 | BAWAL | REWARI | HARYANA | 123501 | L4 | Rejected-Finance EMD REFUND ONLY | |
| 5 | L5₹22.6 L+₹6.7 L (42.0%)Rejected-Finance NA | NA | NA | 121004 | L5 | Rejected-Finance EMD REFUND ONLY |
Tender Value
₹18.2 L
EMD Value
₹40,000
Closing Date
31 Aug 2021, 5:00 pmClosed
EE Provl. Divn. PWD B and R Narnaul
EE Provl. Divn. PWD B and R Narnaul
Construction of Boundary wall of ITI Sujapur in Mohindergarh District.
2021_HRY_181982_1
Boundary wall of ITI Sujapur Rs. 18.24 lacs
Open Tender
Civil Works - Buildings
Item-rate/Agreement basic
90 days
Works
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹40,000
Yes
13 Nov 2021
2 Aug 2021
1 Sept 2021
3 Aug 2021
31 Aug 2021
3 Aug 2021
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. (HSR 4.12.1) All kinds of soil
Filling available excavated earth (excluding rock) in trenches, cum plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m..(HSR 4.32)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: (HSR 6.1.6) 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: (HSR 6.1.2) 1:2:4 (1 cement : 2 coarse sand (zone-Ill) : 4 graded cum stone aggregate 20 mm nominal size
Reinforced cement concrete work in beams, suspended floors roofs having slope up to 15 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1: 1.5:3 (1 cement : 1.5 coarse sand(zone-111) : 3 graded stone aggregate 20 mm nominal size). (HSR 6.16)
Centering and shuttering including strutting, propping etc. and removal of form for (HSR 6.30.1) Foundations, footings, bases of columns, etc. for mass concrete
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement-All work up to plinth level : (HSR 6.14.1) 1 : 1. 5: 3 ( 1 cement : 1. 5 coarse sand (zone-Ill): 3 cum graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for (HSR 6.30.5) Lintels, beams, plinth beams, girders, bressumers and cantilevers
Centering and shuttering including strutting, propping etc. and removal of form for (HSR 6.30.6) Columns, Pillars, Piers, Abutments, Posts and Struts
Brick work with common burnt clay non-modular bricks of class designation 7.5 in foundation and plinth in: (HSR 7.21.1) Cement mortar 1:4 (1 cement: 4 coarse sand)
Brick work with common burnt clay non-modular bricks of class designation 7 .5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : (HSR 7.22.1) Cement mortar 1:4 (1 cement: 4 coarse sand)
Plastering on wall 12 mm cement plaster of mix 1 :6 (1 cement: 6 fine sand) : (HSR 11.5.4)
Applying priming coat With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel work (second coat) (HSR 11.68.4)
Painting over the wooden/metal surface with aluminium paint of approved brand and manufacture to give an even shade. (HSR 11.84.1) Two or more coats on new work
Finishing walls with water proofing cement paint of required shade (HSR 11.93.1) New work (Two or more coats applied@ 3.84 kg/10 sqm)
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. (HSR 13.29.2) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level. Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, over1aps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. (HSR 6.34.6) Thermo-Mechanically Treated bars of grade Fe-500D or more.
The Neta Ji CoOp LC Society
THE JAI MAHAKAL COOP L/C SOCIETY LTD.
THE BASTI RAM CO OPRETIVE LABOUR AND CONSTRUCTION SOCIETY LIMITED
THE GHATAL DEVTA CO OP L AND C SOCIETY LTD
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .