| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 CrAccepted-AOC | ₹6.5 Cr | L1 | Accepted-AOC Being L1 |
| 2 | L2₹6.6 Cr+₹15.7 L (2.42%)Rejected-AOC | ₹6.6 Cr+₹15.7 L (2.42%) | L2 | Rejected-AOC Not Being L1 |
| 3 | L3₹6.8 Cr+₹32.0 L (4.93%)Rejected-AOC FLAT NO 03 PANCHAVATI BUILDING ADARSH NAGAR CHICALIM GOA 403711 | SOUTH GOA | GOA | 403711 | ₹6.8 Cr+₹32.0 L (4.93%) | L3 | Rejected-AOC Not Being L1 |
| 4 | L4₹6.9 Cr+₹45.1 L (6.96%)Rejected-AOC | ₹6.9 Cr+₹45.1 L (6.96%) | L4 | Rejected-AOC Not Being L1 |
| 5 | L5₹6.9 Cr+₹46.3 L (7.14%)Rejected-AOC FLAT NO 5 10 3 73 6 AMAR APARTMENTS TEACHERS COLONY EAST MARREDPALLY SECUNDERABAD 500026 | SECUNDERABAD | HYDERABAD | TELANGANA | 500026 | ₹6.9 Cr+₹46.3 L (7.14%) | L5 | Rejected-AOC Not Being L1 |
| Sl No | Description | Qty | Unit | Indu Electricals L2 | M/s. P S REDDY L3 | B.N.S Constructions L5 | K M SUBHANAIAH L4 | Saiansh Associates L1 |
|---|---|---|---|---|---|---|---|---|
| .50BOQ Dated Jun 2025 | ||||||||
| .75GENERAL SUMMARY NOTE: Schedule ‘A’ Part I to XIV are prepriced by MES under Ser No. 1 to 14. Bidders shall insert their lumpsum amount in the Green coloured field under Col-6 only. | ||||||||
| 1.00 | Lumpsum price worked out by the contractor for “BUILDINGS OR WORKS” as listed in Schedule ‘A’ Part–I | 1 | Lumpsum | 5,20,00,000 ₹5,20,00,000 Lowest | 5,22,56,000 ₹5,22,56,000 | 5,22,56,000 ₹5,22,56,000 | 5,49,00,000 ₹5,49,00,000 | 5,32,00,000 ₹5,32,00,000 |
| 2.00 | Lumpsum price worked out by the contractor for “INTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part–II | 1 | Lumpsum | 1,85,800 ₹1,85,800 Lowest | 2,32,181.4 ₹2,32,181.4 | 2,85,300 ₹2,85,300 | 2,25,000 ₹2,25,000 | 2,70,000 ₹2,70,000 |
| 3.00 | Lumpsum price worked out by the contractor for “INTERNAL ELECTRIC SUPPLY" as listed in Schedule ‘A’ Part–III | 1 | Lumpsum | 20,81,000 ₹20,81,000 | 22,88,860.94 ₹22,88,860.94 | 21,96,000 ₹21,96,000 | 19,89,000 ₹19,89,000 | 12,00,000 ₹12,00,000 Lowest |
| 4.00 | Lumpsum price worked out by the contractor for “SITE CLEARANCE" as listed in Schedule ‘A’ Part -IV . | 1 | Lumpsum | 2,41,000 ₹2,41,000 | 2,40,210.62 ₹2,40,210.62 | 1,95,300 ₹1,95,300 | 2,25,000 ₹2,25,000 | 60,000 ₹60,000 Lowest |
| 5.00 | Lumpsum price worked out by the contractor for "ROAD/PATH/HARDSTANDING" as listed in Schedule ‘A’ Part -V . | 1 | Lumpsum | 53,07,000 ₹53,07,000 | 53,06,809.41 ₹53,06,809.41 | 55,67,400 ₹55,67,400 | 53,05,669 ₹53,05,669 | 40,00,000 ₹40,00,000 Lowest |
| 6.00 | Lumpsum price worked out by the contractor for “SEWAGE DISPOSAL” as listed in Schedule ‘A’ Part – VI. | 1 | Lumpsum | 4,30,000 ₹4,30,000 | 4,29,286.47 ₹4,29,286.47 | 4,48,200 ₹4,48,200 | 3,96,000 ₹3,96,000 | 3,05,000 ₹3,05,000 Lowest |
| 7.00 | Lumpsum price worked out by the contractor for “AREA DRAINAGE” as listed in Schedule ‘A’ Part – VII. | 1 | Lumpsum | 16,27,000 ₹16,27,000 | 16,26,730.16 ₹16,26,730.16 | 14,48,910 ₹14,48,910 | 15,39,000 ₹15,39,000 | 13,00,000 ₹13,00,000 Lowest |
| 8.00 | Lumpsum price worked out by the contractor for “RAIN WATER HARVESTING PIT” as listed in Schedule ‘A’ Part – VIII. | 1 | Lumpsum | 1,53,700 ₹1,53,700 | 1,53,614.31 ₹1,53,614.31 | 1,49,140 ₹1,49,140 | 1,54,000 ₹1,54,000 | 95,000 ₹95,000 Lowest |
Tender Value
₹6.1 Cr
EMD Value
₹6.3 L
Closing Date
11 Sept 2025, 6:00 pmClosed
Chief Engineer AF Bangalore
Chief Engineer AF Bangalore No. 2 DC Area MES Road Yeshwantpur Post Bangalore 560022
CONSTRUCTION OF DEFICIENT LIVING IN ACCOMMODATION AND AIRMEN MESS AT AFS HAKIMPET
2025_MES_717633_1
801635/AF/E8
Open Tender
Civil Works
Lump-sum
540 days
GE(AF)HAKIMPET
AS PER NIT
8 documents required · 8 mandatory
₹3,000
GE(AF) HAKIMPET
₹6.3 L
Yes
16 Oct 2025
30 Jun 2025
18 Sept 2025
30 Jun 2025
11 Sept 2025
28 Aug 2025
1 Jul 2025 - 11 Jul 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.5 | BOQ Dated Jun 2025 | - | - | - | - |
| 0.75 | GENERAL SUMMARY
NOTE: Schedule ‘A’ Part I to XIV are prepriced by MES under Ser No. 1 to 14. Bidders shall insert their lumpsum amount in the Green coloured field under Col-6 only. | - | - | - | - |
| 1 | Lumpsum price worked out by the contractor for “BUILDINGS OR WORKS” as listed in Schedule ‘A’ Part–I | 1 | Lumpsum | 5,22,56,000 | ₹5,22,56,000 |
| 2 | Lumpsum price worked out by the contractor for “INTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part–II | 1 | Lumpsum | 1,50,532.92 | ₹1,50,532.92 |
| 3 | Lumpsum price worked out by the contractor for “INTERNAL ELECTRIC SUPPLY" as listed in Schedule ‘A’ Part–III | 1 | Lumpsum | 20,59,389.67 | ₹20,59,389.67 |
| 4 | Lumpsum price worked out by the contractor for “SITE CLEARANCE" as listed in Schedule ‘A’ Part -IV . | 1 | Lumpsum | 2,40,210.62 | ₹2,40,210.62 |
| 5 | Lumpsum price worked out by the contractor for "ROAD/PATH/HARDSTANDING" as listed in Schedule ‘A’ Part -V . | 1 | Lumpsum | 53,06,809.41 | ₹53,06,809.41 |
| 6 | Lumpsum price worked out by the contractor for “SEWAGE DISPOSAL” as listed in Schedule ‘A’ Part – VI. | 1 | Lumpsum | 4,29,286.47 | ₹4,29,286.47 |
| 7 | Lumpsum price worked out by the contractor for “AREA DRAINAGE” as listed in Schedule ‘A’ Part – VII. | 1 | Lumpsum | 16,26,730.16 | ₹16,26,730.16 |
| 8 | Lumpsum price worked out by the contractor for “RAIN WATER HARVESTING PIT” as listed in Schedule ‘A’ Part – VIII. | 1 | Lumpsum | 1,53,614.31 | ₹1,53,614.31 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tenderdocument.pdf
Tender Documents • 1.53 MB
Tenderdocument_2.pdf
Tender Documents • 12.76 MB
Tenderdocument_3.pdf
Tender Documents • 13.25 MB
BOQ.xls
BOQ • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .