Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹96.6 LAccepted-AOC 01 REWARI REWARI HARYANA 123401 | REWARI | HARYANA | 123401 | L1 | Accepted-AOC FIRST LOWEST | |
| 2 | L2₹1.0 Cr+₹3.5 L (3.64%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹1.1 Cr+₹9.5 L (9.82%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹1.1 Cr+₹11.5 L (11.9%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹1.1 Cr+₹13.2 L (13.7%)Rejected-Finance | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S ASHISH KUMAR L1 | M/S BHARAT SINGH CONTRACTORS L3 | RAJ PAL SINGH CONTRACTOR L6 | RAKESH SINGH L2 | M/S PRAMLESH KUMAR DUBEY L5 | M/S ANSH BAJRANG ENTERPRISES L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in foundation in Mar, Kabar, Ranker and Kanker mixed soil with all lead & lift including all cost of labour, T&P etc. complete as per direction of Engineer-in-charge. | 529.12 | M3 | 78 ₹41,271.36 Lowest | 85 ₹44,975.2 | 80 ₹42,329.6 | 80 ₹42,329.6 | 87.69 ₹46,398.53 | 87.97 ₹46,546.69 |
| 2.00 | Laying P.C.C. 1:3:6 with 19 mm stone grit including all cost of material, labour, T&P etc. with mechanical mixing & vibration complete as per direction of Engineer-in-charge. | 91.73 | M3 | 3,900 ₹3,57,747 Lowest | 4,100 ₹3,76,093 | 4,500 ₹4,12,785 | 4,108 ₹3,76,826.84 | 4,309.64 ₹3,95,323.28 | 4,214 ₹3,86,550.22 |
| 3.00 | IInd Class Brick masonary in 1:5 cement mortar including all cost of material, labour, T&P etc. complete as per direction of Engineer-in-charge. | 579.86 | M3 | 4,450 ₹25,80,377 Lowest | 5,100 ₹29,57,286 | 4,800 ₹27,83,328 | 4,900 ₹28,41,314 | 5,191.48 ₹30,10,331.59 | 4,784.52 ₹27,74,351.77 |
| 4.00 | Providing reinforced by organic fibrs and /or inorganic synthetic fibres cement 6mm thick corrugated sheets (as per IS: 14871) roofing upto any pitch and fixing with polymet coated J, or L hooks, bolts and nuts 8mm dia G.I. Plain and bitumen washers or with self drilling fastener and EPDM washers etc. complete (excluding the cost of purlins, rafters and trusses), including cutting sheets to size and shape wherever required. | 776.3 | M2 | 345 ₹2,67,823.5 Lowest | 380 ₹2,94,994 | 900 ₹6,98,670 | 357 ₹2,77,139.1 | 383.87 ₹2,97,998.28 | 390.28 ₹3,02,974.36 |
| 5.00 | P/L R.C.C. 1:1½:3 with 11.20 mm stone grit including all cost of material, labour, T&P etc. with mechanical mixing & vibration complete as per direction of Engineer-in-charge. | 114.6 | M3 | 4,800 ₹5,50,080 | 5,500 ₹6,30,300 | 5,000 ₹5,73,000 | 4,000 ₹4,58,400 Lowest | 5,325.67 ₹6,10,321.78 | 5,331.31 ₹6,10,968.13 |
| 6.00 | P/L C.C. (1:2:4) with 11.20 mm stone grit for apron including all cost of material, labour, T&P etc. with mechanical mixing & vibration complete as per direction of Engineer-in-charge. | 84.37 | M3 | 4,000 ₹3,37,480 | 4,500 ₹3,79,665 | 3,500 ₹2,95,295 Lowest | 4,194 ₹3,53,847.78 | 4,399.46 ₹3,71,182.44 | 4,404.12 ₹3,71,575.6 |
| 7.00 | Dismanteling existing plaster including disposal of refuse material with all lead & lift including all cost of labour, T&P etc. complete as per direction of Engineer-in-charge. | 465.43 | M2 | 40 ₹18,617.2 Lowest | 48 ₹22,340.64 | 500 ₹2,32,715 | 48 ₹22,340.64 | 45.31 ₹21,088.63 | 45.36 ₹21,111.9 |
| 8.00 | 12.50mm thick Cement Plaster in 1:5 cement mortar over brick work including all cost of material, labour, T&P etc. complete as per direction of Engineer-in-charge. | 3,940.53 | M2 | 111 ₹4,37,398.83 Lowest | 120 ₹4,72,863.6 | 225 ₹8,86,619.25 | 134 ₹5,28,031.02 | 127.15 ₹5,01,038.39 | 113.4 ₹4,46,856.1 |
| 9.00 | Providing and Laying steel Reinforcement including cost of steel with cutting, bending, placing & binding with G.I. wire including all cost of materials, labour, T&P etc. complete as per direction of Engineer-in-charge. | 9.35 | MT | 57,000 ₹5,32,950 | 60,000 ₹5,61,000 | 70,000 ₹6,54,500 | 56,000 ₹5,23,600 Lowest | 64,259.59 ₹6,00,827.17 | 64,327.66 ₹6,01,463.62 |
| 10.00 | Centering & Shuttering including all cost of materials, labour, T&P etc. complete as per direction of Engineer-in-charge. | 1,035.72 | M2 | 425 ₹4,40,181 | 380 ₹3,93,573.6 | 300 ₹3,10,716 | 200 ₹2,07,144 Lowest | 469.92 ₹4,86,705.54 | 490 ₹5,07,502.8 |
Tender Value
Refer Docs
EMD Value
₹2.3 L
Closing Date
1 Sept 2025, 3:30 pmClosed
SE ICC MAHOBA
SE ICC BAZARIYA MAHOBA
Renovation/repair work of Type-III temporary residence form B-1 to B-10 and Main boundary wall of Irrigation colony in District Mahoba(Lot-1)
2025_UPIDC_1065174_6
01/SE/2025-26
Open Tender
Civil Works - Buildings
Item Rate
270 days
MAHOBA
As per Tender Document and NIT
2 documents required · 2 mandatory
₹4,092
₹2.3 L
23 Dec 2025
26 Aug 2025
1 Sept 2025
26 Aug 2025
1 Sept 2025
26 Aug 2025
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .