| # | Company | Rank | Status |
|---|---|---|---|
| 1 | 0Accepted-Finance | 0 | Accepted-Finance ok |
| 2 | 0Accepted-Finance | 0 | Accepted-Finance ok |
| 3 | 0Accepted-Finance | 0 | Accepted-Finance ok |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
6 Apr 2026, 4:00 pmClosed
EXEN CRD SMC
EXEN CRD SMC
Creation of Green Barriers and Buffer Zones at Achan Landfill site
2026_HAUDD_306856_1
ENIT/151/CRD/SMC/DT.27-03-2026
Open Tender
Civil Works
365 days
ACHAN SAIDPORA
REFER TENDER DOCS
2 documents required · 2 mandatory
₹2,600
Yes
MUNICIPAL ACCOUNT
₹3.0 L
Yes
8 Apr 2026
28 Mar 2026
7 Apr 2026
28 Mar 2026
6 Apr 2026
28 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out of GEOTAGGED photographs of size 150mm x 100mm at site before execution of work, during execution and after completion of work including submitting the same to the engineer incharge. | 50 | No. | 20 | ₹1,000 |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. (All kinds of soil). | 14,200 | Cum | 187.3 | ₹26,59,660 |
| 3 | Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated orstacked material All kinds of soil complete. | 14,200 | Cum | 89.75 | ₹12,74,450 |
| 4 | Excavating, supplying and filling of local/ good earth (including royalty) by mechanical transport including transportation, ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete including carriage for an average of14Km beyond basic 5Km complete. | 11,908.25 | Cum | 690.86 | ₹82,26,933.6 |
| 5 | Trees/ PlantsPlantation of Plant Saplings of various verities including cost of digging of pit holes of size: 1'-6" x 1'-6" x 1'-6"), mixing of manure and sand with earth (1:1:3 ratio: 1 Manuar, 1 Sand & 3 Good Earth), refilling of mixed earth, sand and manure in pit holes, ramming, watering complete jobinall respects. Cost shall include transportationof plant material/ saplings fromsource(Govt./Private Nursery)to site of work.ExcludingcostofPlant Saplings, Manuar, Sand & Good earth (where ever required). | 1,775 | No. | 40 | ₹71,000 |
| 6 | Supplying and Filling of Goodearth, including carrying by lorry, placing, dressing and ramming in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer wooden rammers Including of all carriages from source to site complete. including carriageof 14Km1775 x 1'-6" x 1'-6" x 1'-6" = 5990.625 Cft= @ 60% Only = 97.04 cum. | 175 | Cum | 695.56 | ₹1,21,723 |
| 7 | Supplying and Filling of Sand, including carrying by lorry, placing, dressing andramming in layers not exceeding 20cm in depth Including of all carriages fromsource to site complete. including carriage of 25Km1775 x 1'-6" x 1'-6" x 1'-6" = 5990.625 Cft= @ 20% Only = 32.34cum. | 32.35 | Cum | 1,364.88 | ₹44,153.87 |
| 8 | Supplying and stacking atsitedumpmanurefromapprovedsourceincludingcarriage complete (manure measured in stacks will be reduced by 8% for payment)Screened through sieve of I.S. designation 4.75 mm 775 x 1'-6" x 1'-6" x 1'-6" = 5990.625 Cft= @ 20% Only = 32.34 cum. | 32.35 | Cum | 53.56 | ₹1,732.67 |
| 9 | Supplying and Planting of Male Popular plant sapling of approved height, quality. Height of Plant Sapling shall not be less than 10 feet from the trunk. The cost shall include digging pits refillig back earth mixed with sand, manaure as per directions of Engineer Incharge. Girth 30 to 40mm.Male Popular Plants as per the recommendation of DFO SMC. | 1,775 | No. | 90 | ₹1,59,750 |
| 10 | Tube WellDrilling of 125 mm diameter tubewell by air rotary drilling rig unit suitable for lowering of MS casing of 125mm diameter in suitably drilled bore hole as per specifications laid down in IS 2800 (Part-I) with upto date amendments. The job is to be done in all kinds of soils, boulder, rocks, collapsible strata, saturated soils, artisan conditions by ODEX/DTH attachments and exploration of ground water by tapping sufficient aquifer zones. The job includes the cost shifting of drilling accessories, tools, bits, casing shoe, consumables like fuel, lubricants,skilled and unskilled labours and other unforeseen items. The job also includes the cost of pipe materials (MS 125mm) and lowering of casing assembly and its subsequent welding after every 10 feet upto the drilled/desired depth. The casing is to be slotted as per the site requirement and as directed by site engineer.The specifications of the tubewell shall be as under:Dia. of MS pipe to be used…..125 mm Casing pipe shall be as per IS 4270: 2001Drilling method to beused….. Air Rotary MethodDevelopment of tubewell with backwash method with air compressor of minimum capacity 1000 CFM (300 PSI air delivery system) with suitable arrangements till well is thoroughly developed in all respects complete job as directed as per the directions of site engineer including all carriages upto site of work. | 100 | Mtr. | 4,200 | ₹4,20,000 |
stage.html
html • 0.05 MB
technical_996040.pdf
techsummary_996040.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.76 MB
BOQ_996040.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid