Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹9.6 LAccepted-Finance | L-1 | Accepted-Finance L-1 | |
| 2 | L-2₹12.9 L+₹3.3 L (33.8%)Rejected-Finance | L-2 | Rejected-Finance L-2 | |
| 3 | L-3₹13.0 L+₹3.3 L (34.4%)Rejected-Finance 145 1 0 NEAR OLD LIC SHIV NAGAR VILLAGE TOWN MODIPURAM CITY MEERUT MEERUT UTTAR PRADESH 250110 INDIA | MEERUT | UTTAR PRADESH | 250110 | L-3 | Rejected-Finance L-3 |
Tender Value
₹13 L
EMD Value
₹13,000
Closing Date
12 Apr 2023, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE
400KV S/S Sarnath Varanasi
Construction of 132KV Bay and erection, shifting, installation, centrifuging and all other associated work of 63MVA T/F at 132KV S/S Machlisahar Under ETD Jaunpur
2023_UPTCL_784423_1
E-Tender No. 33 ETC-II(VNS)/2022-23
Open Tender
Electrical Works
Turn-key
120 days
JAUNPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE ETD Ghazipur
₹13,000
18 Aug 2023
15 Mar 2023
13 Apr 2023
15 Mar 2023
12 Apr 2023
15 Mar 2023
Amount
Part- A, Supply of Materials
Single tention fitting suitanble for ACSR Moose
Single tention fitting suitanble for ACSR Panther
Single Suspension fitting suitanble for ACSR Panther
Single Suspension fitting suitanble for ACSR Moose
PG Clamp Suitable for Panther to Panther
PG Clamp Suitable for Moose to Moose
PG Clamp Suitable for Moose to Panther
Bus post clamp Suitable for Single Panther
Bus post clamp Suitable for Twin Panther
Bus post clamp Suitable for Twin Moose
40 mm. M.S. Round Bar
Part -B, Work (Erection of 63 MVA T/F)
Shifting upto 20mtr. of main tank of 63 MVA, 132/33 KV transformer from unloading place to plinth including turning of tank, if required. All T&P and all other associated works of completion of job satisfactory.
Additional shifting of 5mtr. a part therof 75 meter of 63 MVA 132/33 KV Transfomeer @5 meter per job.
Complete erection of 63 MVA, 132/33 KV Transformer by erection of radiators, conservator tank, all bushing, their turrets connecting all pipe lines, cooling fans, motor drive mechanism of tap charger, RTCC panels, oil pumps and associated oil pipe lines etc to complete the job satisfactorily including first filling of oil and topping up of T/F oil (Not circulation) in tank radiators, oil pipe lines, conservator tank etc, and attending the oil leakage, if any and all other associated works for satisfactory completion of job. Crane and T&P shall be provided by the contractor
Centrifusing of fresh transformer oil and filling of balance oil into the transformer with machine ,operator and to provide final BDV & PPM testing results. Machine and operator will be provided by the contractor.
Laying of following size control cable in the cable trench from control relay/ RTCC panel to Transformer marshalling/ Drive Mechanism as per cable schedule, its Saddling as every 75 mm distance with MS saddles of size of size 25x3mm , including carriage of cable drums from store to laying site and all other associated work to complete the job satisfactory.
2C x 2.5 sq.mm
4C x 2.5 sq.mm
6C x 2.5 sq.mm
10C x 2.5 sq.mm
Termination of above cable as per cable schedule including making necessary holes in gland plates of boxes where ever required including Supply and fixing of cable glands of approxinmate size and to provide ferrules and nos. for each core of cable and its termination with all the other associated works to complete the Job.
2C x 2.5 sq.mm
4C x 2.5 sq.mm
6C x 2.5 sq.mm
10C x 2.5 sq.mm
Construction of Delta earthing by piercing 3mtr. long electrodes in earth and then connecting them with each other by 75x10 mm M.S flat and connecting to neutral bushing ,the same with main earthmate at 2 places as required, including cost of M.S flat excluding cost of M.S round bar and all other associated work to completion the job satisfactory.
Earthing of 63 MVA, 132/33 KV Transformer including MB, OLTC, RTCC etc with M.S. flat to be provided by the Department with 50x6 mm and 75x10 mm M.S. flat and connecting the same with main earthmat at two places as required including painting of M.S. strip of one coat red oxide primer and two coat green enamel colour above ground surface. and all other associated work to completion the job satisfactory.
Shifting of main tank of defective 20 MVA, 132/33 KV transformer from dismantle point up to storage plinth, approximate 60 mtrs@ 5.00 meter/job. distance including turning of tank, if required including all T&P and all other works required to complete the job satisfactory as per tech specn.
Dismantling of 250 KVA, 33/0.4 KV Station T/F from Old plinth work includes opening of jumpers, cable termination, Earthing etc. all other associated works complete job satisfactory at 132 KV S/S Machhalishahar & safe shifting of 250 KVA, 33/0.4 KV T/F from old plinth to New plinth with the help of Hydra Crane at 132 KV S/S Machhalishahar with all other associated works..
Installation of 250 KVA, 33/0.4 KV T/F from Machhalishahar Station New plinth work includes connections of jumpers, replacement of burnt 3.5core, 400 squr.mm. cable lugs of all three phases including neutral lug and termination etc., along with checking & tightening of complete 33 KV bay, overhauling of 33 KV Isolator & all other associated works complete job satisfactory.
Part -C, Work (Erection of 63 MVA T/F Bay)
Collection, loading and carriage of subsation structure (7.5MT) from EFU NAINI Pryagraj to 132 KV S/S Machhalishahar and after carriage unloading it at 132 KV S/S Machhalishahar.
Loading of S/S Structure (7.5 MT) at EFU Naini .
Carriage of S/S Structure (7.5 MT ) from EFU Naini to 132 KV S/S Machhalishahar (Approx distance 115 KM).
Unloading of S/S Structure (7.5 MT) at 132KV S/S Machhalishahar.
Erection of Main and auxiliary structure by shifting of structure from store to work site as per relevant drawing and practices using Nut - Bolt and spring washers. The material shall be supplied by department free of cost but the contractor has to manage T & P and all other associated work to complete the job satisfactory.
Stringing of 132 KV Jack Bus bar ( R, Y & B phase ) with ACSR single Panther conductor including cutting, bending and clamping fitting of tension clamp with all associated accessories, hoisting of insulator string after shifting of material from store to work site and all other associated work to complete the work satisfactory.
Erection of following equipments as per instruction manual of various equipments and technical specification including shifting of material from store to work site includig all other associated work to complete the job Satisfactory.
145 KV BSI
145 KV LSI
145 KV Tandom Isolator
145 KV SF6 ,CB
Junction box for 145 KV CT
Junction box for 145 KV LSI, BSI & Tandom
Junction box for 36 KV CT
36 KV VCB
36 KV BSI
Junction box for 36 KV BSI
Rely&control panel for 63 MVA Power Tranformer.
Erection of ABT Energy Metering panel with main and check rack complete in all respect.
Jumpering of transformer and associated equipments using single/double panther/zebra/moose conductor from bus bar to isolators,CB,CT,LA, etc on both sides required.
Laying of follwing size control cables from control & relay panels to various equipment junction boxes etc in switchyard as per cable schedule, its binding at every 1.5 mtr. distance with M.S. saddle including carriage of cable from store to work site and shiftingback to store and all associated works to complete the job satisfactorily .
2C x 2.5 sq. mm
4C x 2.5 sq. mm
6C x 2.5 sq. mm
10C x 2.5 sq. mm
Termination of above cable as per cable schedule including making necessary holes in gland plates of boxes where ever required including Supply and fixing of cable glands of approxinmate size and to provide ferrules and nos. for each core of cable and its termination with all the other associated works to complete the Job.
2C x 2.5 sq. mm
4C x 2.5 sq. mm
6C x 2.5 sq. mm
10C x 2.5 sq. mm
Earthing of 120KV and 30 KV LA's by consisting of 6 Nos. 3.0 Mtr long electrode of 40mm dai having 150mm long conical shape, its placing inside the ground in rectangular shape and connection all 6 Nos electrodes with 75x10/50x6mm MS flat laid on its edge and then this rectangle shape be connected to main earth mat at two place in opposite direction strictly as per drawing, including cost of M.S flat excluding cost of M.S round bar.
Earthing of Main & Auxiliary structure and various type equipments (CT, PT, CB, LA, LSI, BSI etc ) by M.S strips by cutting to proper size, digging of earth from ground level to earthmat then proper welding as per drawing and leveling earth. Painting of M.S Strips of one coat red oxide primer and two coat with green colour and all associated work to complete the job satisfactory . M.S Flat will be provided by the contractor.
M/s S.S. Refregeration
Hi-tech power transmission
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .