| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.1 LAccepted-AOC | ₹24.1 L | L1 | Accepted-AOC lowest rate |
| Sl No | Description | Qty | Unit | Usha Enterprises L1 |
|---|---|---|---|---|
| 1.00Excavation of Pole/Stay pits | ||||
| 2.00 | Excavation of pole pit upto 27' (8.0 m) Pole by using JCB or manual | 215 | Each Pit | 450 ₹96,750 |
| 3.00 | Excavation of pole pit above 8.0 Mtr pole PSC/RCC/RSJ pole by using JCB or manual | 51 | Each Pit | 550 ₹28,050 |
| 4.00 | Hard rock without blasting (where houses are located) | 48 | Each Pit | 1,500 ₹72,000 |
| 5.00 | Medium rock and dense Medium rock requires
blasting | 8 | Each Pit | 10 ₹80 |
| 6.00 | Stay pit 4.5' to 5' depth by using JCB or manual | 185 | Each Pit | 450 ₹83,250 |
| 7.00Erection of Poles | ||||
| 8.00 | PSC/ RCC poles/Metal poles upto 8.00m. (27') by using JCB or manual | 256 | Each Pole | 550 ₹1.4 L |
| 9.00 | PSC/ RCC poles/Metal poles above 8.00m by using JCB or manual | 66 | Each Pole | 650 ₹42,900 |
| 10.00 | Erection of stay set complete | 185 | Each Stay | 240 ₹44,400 |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
5 Jan 2026, 2:30 pmClosed
SE/SEDC/Udayapatty/Salem
O/o The SE/SEDC/SALEM
Works contract for Execution of extension, Improvement, DCW and various works in P.N.Palayam Sub Division in respect of Valapady Division
2025_EB_635486_1
SE/SEDC/WC.38/2025-26 Dt 19.12.25
Open Tender
Electrical and Maintenance Works
365 days
Valapady
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹25,000
6 Mar 2026
23 Dec 2025
6 Jan 2026
23 Dec 2025
5 Jan 2026
24 Dec 2025
Excavation of pole pit upto 27' (8.0 m) Pole by using JCB or manual
Stay pit 4.5' to 5' depth by using JCB or manual
Erection of Poles
PSC/ RCC poles/Metal poles upto 8.00m. (27') by using JCB or manual
Erection of stay set complete
Fixing of Line Materials
HT V Cross arms / Channel Cross arms / Guarding Cross arm 3 1/2, 4 1/2
LT 3 Phase cross arm
LT single Phase cross arm
HT / LT TI Fitting
Fixing of HT Pin Insulators (11/22 KV)
Fixing of HT 11KV stain disc
Fixing of LT Pin Insulators
Fixing of LT Shackle
Fixing of Aluminium knob
Paving and stringing of conductor
Concreting of poles:
Earthing of Pole
Guarding arrangements:
Service Erected:
Loading and unloading of poles:
Loading of poles upto 8.0 M/ 27'
Unloading of poles upto 8.0 M/ 27'
Loading of materials
Unloading of materials
Transport of poles/Materials/ conductors and other materials (excluding loading and unloading charges.)
Below 8 Kms
Above 8 Kms. For additional km (Irrespective of weight in tonnage)
Transporting of Poles
Transporting of poles from road side to pole pit including loading and inloading of poles by using JCB or manual upto 100m
Transporting of poles from road side to pole pit including loading and inloading of poles by using JCB or manual beyond 100m
Erection of Transformer:
Labour charges for alteration of Back Clamps/ StayClamps to suit for the works
Drilling of hole in channel only 3/4" & 1"
Dismantling of LT pin Insulator
Dismantling of LT shackle
Dismantling of Aluminium Knob
Structure Erection
G.S.T. @18% should be Entered by the Bidder
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_760564.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid