Tender Value
Refer Docs
EMD Value
₹1.9 L
Closing Date
26 Aug 2026, 3:00 pmDue tomorrow
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
7 conditions · 2 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
1.The quantities/amount mentioned above are rough and for guidance only and are subject to change according to the needs of the railway & variation there of to any extent will not be the basis of any claim against the Railway.2.The work shall be carried out as per standard specifications (Amended up to date).3.The contract shall be governed by General Condition of Contract and Instructions to the Tenders - 2022 (Amended up to date).4.All tools & plants and mechanical equipment as required to execute the work shall be arranged by the contractor.5.Contractor/ suppliers/ service providers/ parties shall register their firms under EPFO & GSTIN (GST Identification Number).6.The above indicated locations are tentative and Railway reserves the right to effect the changes as per exact/actual requirement.
Extension of existing TMC shed in connection with Infrastructure enhancement of Satellite Track Machine Depot, Lalgarh/Bikaner with the provision of staff facilities under ADEN/HQ/Bikaner
134-26-27~NWR
134-26-27
Open
Works - General
8 Months
Bikaner, Rajasthan
₹0
₹1.9 L
5 Aug 2026
5 Aug 2026
12 Aug 2026
72 items across 4 schedules · ₹1,33,51,436.47 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| CONCRETE WORK | — | — | — | — | |
| CEMENT CONCRETE (CAST IN SITU) | — | — | — | — | |
| Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | — | — | — | — | |
| 1 | 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 40 mm nominal size derived from natural sources) | cum | — | 60 7780.3 | 4,66,818 |
| 2 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | cum | — | 101 6812 | 6,88,012 |
| Centering and shuttering including strutting, propping etc. and removal of form work for : | — | — | — | — | |
| 3 | Foundations, footings, bases for columns | Sqm | — | 20 392.15 | 7,843 |
| REINFORCEMENT CEMENT CONCRETE | — | — | — | — | |
| FORM WORK | — | — | — | — | |
| Centering and shuttering including strutting, propping etc. and removal of form for | — | — | — | — | |
| 4 | Foundations, footings, bases of columns, etc. for mass concrete | Sqm | — | 30 392.15 | 11,764.5 |
| 5 | Lintels, beams, plinth beams, girders, bressummers and cantilevers | Sqm | — | 15 736.4 | 11,046 |
| 6 | Columns, Pillars, Piers, Abutments, Posts and Struts | Sqm | — | 15 961.3 | 14,419.5 |
| PRE-CAST RCC | — | — | — | — | |
| 7 | Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but , excluding cost of reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | cum | — | 10 10585.9 | 1,05,859 |
| STEEL REINFORCEMENT | — | — | — | — | |
| Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. | — | — | — | — | |
| 8 | Thermo-Mechanically Treated bars of grade Fe-500D or more. | Kg | 9500 | 107.85 | 10,24,575 |
| Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. | — | — | — | — | |
| 9 | Thermo-Mechanically Treated bars of grade Fe-500D or more. | Kg | 4500 | 107.85 | 4,85,325 |
| DESIGN MIX CONCRETE | — | — | — | — | |
| Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: | — | — | — | — | |
| All works upto plinth level | — | — | — | — | |
| 10 | Concrete of M25 grade with minimum cement content of 330 kg /cum | cum | — | 32 9504.75 | 3,04,152 |
| 11 | Concrete of M30 grade with minimum cement content of 350 kg /cum | cum | — | 6.5 9655.7 | 62,762.05 |
| 12 | Add for using extra cement in the items of design mix over and above the specified cement content therein. | Quintal | — | 50 733.5 | 36,675 |
| Schedule total | ₹32,19,251.05 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Generalcondition01.04.26From01-26-27_compressed.pdf
ATTACHMENT
GCC-2022-uptoACS104.3.25.pdf
ATTACHMENT
GCCACS11_compressed.pdf
ATTACHMENT
specialcondExtensionofexistingTMCshedinconnectionwithInfrastructureenhancementofSatelliteTrackMachineDepot04082026.pdf conditions
ATTACHMENT
specialcondExtensionofexistingTMCshedinconnectionwithInfrastructureenhancementofSatelliteTrackMachineDepot04082026.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].