Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC THIMIRIKOTTAI MECHERI SALEM DT | L1 | Accepted-AOC lowest price | |
| 2 | Not Admitted-Fee/PreQual/Technical NO 6 173 2 EARIKARAI KALAPARAPATTY PO SALEM SOUTH TALUK VEMBADITHALAM VIA SALEM 637504 | SALEM | TAMIL NADU | 637504 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
4 Jul 2023, 3:00 pmClosed
Executive Officer
Kadayampatty Town Panchayat, Salem
Providing B.T.Road and Construction of Storm Water Drain at ward No.10 Danishpettai main road to TVC Nagar in Kadayampatty Town Panchayat.
2023_DTP_333236_1
43/2023
Open Tender
Civil Works - Roads
Works
90 days
Kadayampatty Town Panchayat
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,000
Yes
18 Mar 2025
28 Jun 2023
4 Jul 2023
28 Jun 2023
4 Jul 2023
28 Jun 2023
Amount
Earth Work Excavation for foundation in all types of soils and sub soils to full depth (such as Soils in Rock / Silt / Light Black Cotton Soil / Ordinary Soil ) except in rock requiring blasting but inclusive of shoring, shuttering and bailing out water wherever necessary and refilling the sides of foundation with excavated earth other than sand in layers of 150 mm thick well rammed and consolidated, depositing the surplus earth in places shown by the Departmental Officers with initial lead of 10 m and initial lift of 2 m. Complete as per TNDSS 23 & 24, V, VI (S2), VII, 9,10
Plain Cement Concrete of mix 1 : 4 : 8 (One part Cement, four part sand & eight part of aggregates) using 40mm gauge hard broken metal from approved quarry including all cost, conveyance of materials to site with proper mixing, compacting, finishing and curing etc., complete as per standard specification. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII
Supplying and errecting centering for Sides and Soffits including necessary supports and strutting upto3.29mt height for plane surfaces as detailed below in all floors with all cross bracings using mild steel sheets of size 90mm x60mm and 10BG stiffened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia supported at not more than 75cm centre to centre etc complete Complying with standard Specification without Strutting.TNDSS No. 30(S) 86 86 A V, VI(S3)VII
Plain Cement Concrete 1:2:4 Mix (one part cement, two part M-sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site and labour charges for mixing, laying and curing etc., complete as per standard specifications. TNDSS NO: 28 & VI (S2) VI (S5A) VII
Providing Granolithic floor finish of the 25mm thickness with plain cement concrete 1:2:4 (One Cement, Two M-sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers.
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam specification including premixing the materials with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying inuniform layers with paver sin Sub Base/Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5
Providing and laying Prime Coat over WMM surface using 7Kg of Emulsion Bitumen (SS1) per 10sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50Kg of Bitumen Emulsion (RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying 50mm Consolidated thick Dense Bituminous Mecadam using 0.24 cum of 26.50 – 13.20 mm Graded metal and 0.25 cum of 13.20 – 2.36 mm Grade metal and 0.23 cum of 2.36 mm & below with 53.20 kgs of 60/70 Grade Bulk bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 505 of MORTH Rev-5
Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 46.28 kgs of 60/70 Grade Bulk bitumen & 4.024 kgs of Shredded plastic for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
Providing and laying Well Gravel to the specified thick including cost and conveyance of Well gravel from approved quarry and stocking the same at road side to Departmental guage for premeasurement as directed by the Departmental Officers including labour charges for spreading in layers not exceeding 75 mm thick (or) as specified by the departmental officers, levelling, sectioning etc., and all other charges for tools and plants employed for the work and all other incidental charges such as barricading and providing danger lights etc., complete as per standard specification. as per clause 301 & 305 of MORTH
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .