Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹6.9 L+₹915.93 (0.13%)Rejected-Finance | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | S.KUMAR L1 | SPD Constructions L2 |
|---|---|---|---|---|---|
| 1.00Construction of Bus Shelter in Athipakkam Panchayat MP-LADS - 2026 - 2027 Vandavasi Block | |||||
| 2.00 | Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation | 13.31 | Cum | 263 ₹3,500.53 Lowest | 265 ₹3,527.15 |
| 3.00 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 2.81 | Cum | 1,854 ₹5,209.74 Lowest | 1,856 ₹5,215.36 |
| 4.00 | Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 11.22 | Cum | 326 ₹3,657.72 Lowest | 329 ₹3,691.38 |
| 5.00 | Cement Concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges, etc. | 5.12 | Cum | 5,509 ₹28,206.08 Lowest | 5,515 ₹28,236.8 |
| 6.00 | Supply and fabrication of steel for RCC items including cost and conveyance of binding wire, etc., complete | 1 | MT | 91,894 ₹91,894 Lowest | 91,899 ₹91,899 |
| 7.00 | RCC 1:1.5:3 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges, etc. | 11.19 | Cum | 9,240 ₹1,03,395.6 Lowest | 9,242 ₹1,03,417.98 |
| 8.00 | Supplying and erecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angle | 17.26 | Sqm | 546 ₹9,423.96 Lowest | 549 ₹9,475.74 |
| 9.00 | Above GL | 86.42 | Sqm | 1,094 ₹94,543.48 Lowest | 1,096 ₹94,716.32 |
| 10.00 | Brick work in Cement Mortar 1:5 using Country bricks including cost and conveyace of all materials and all labour charges, etc. | 13.19 | Cum | 6,361 ₹83,901.59 Lowest | 6,362 ₹83,914.78 |
Tender Value
₹7 L
EMD Value
₹7,000
Closing Date
21 Sept 2026, 4:00 pmClosed
The Block Development Officer (BP)
The Block Development Office (BP)
Construction of Bus Shelter in Athipakkam Panchayat MPLADS 2026 2027 Vandavasi Block
2026_RDTN_701346_1
AS No A6/2306/2026 Dt.25.08.2026
Open Tender
Civil Works
Lump-sum
180 days
The Block Development Office (BP)
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹7,000
Yes
29 Sept 2026
3 Sept 2026
21 Sept 2026
3 Sept 2026
21 Sept 2026
3 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Bus Shelter in Athipakkam Panchayat MP-LADS - 2026 - 2027 Vandavasi Block | - | - | - | - |
| 2 | Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation | 13.31 | Cum | - | - |
| 3 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 2.81 | Cum | - | - |
| 4 | Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 11.22 | Cum | - | - |
| 5 | Cement Concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges, etc. | 5.12 | Cum | - | - |
| 6 | Supply and fabrication of steel for RCC items including cost and conveyance of binding wire, etc., complete | 1 | MT | - | - |
| 7 | RCC 1:1.5:3 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges, etc. | 11.19 | Cum | - | - |
| 8 | Supplying and erecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angle | 17.26 | Sqm | - | - |
| 9 | Above GL | 86.42 | Sqm | - | - |
| 10 | Brick work in Cement Mortar 1:5 using Country bricks including cost and conveyace of all materials and all labour charges, etc. | 13.19 | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
Tenderdocument.pdf
Tender Documents • 0.44 MB
BOQ_843006.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .