Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.7 LAccepted-AOC VILL NANDA KA NAGLA DHAOLI AGRA 282001 | AGRA | AGRA | UTTAR PRADESH | 282001 | L1 | Accepted-AOC Being lowest bidder | |
| 2 | L2₹25.7 L+₹97,280 (3.94%)Rejected-Finance | L2 | Rejected-Finance Being higher bidder | |
| 3 | L3₹27.8 L+₹3.1 L (12.4%)Rejected-Finance | L3 | Rejected-Finance Being higher bidder | |
| 4 | L4₹27.8 L+₹3.1 L (12.7%)Rejected-Finance DADAWA KURIYAR KHAS BASTI BASTI UTTAR PRADESH 272178 | BASTI | UTTAR PRADESH | 272178 | L4 | Rejected-Finance Being higher bidder | |
| 5 | L5₹29.7 L+₹4.9 L (20.0%)Rejected-Finance 19 TAGORE PUBLIC SCHOOL COMPLEX SEWLA SARAI MALOOK CHAND GWALIOR ROAD AGRA UP 282001 | AGRA | AGRA | UP | 282001 | L5 | Rejected-Finance Being higher bidder |
Tender Value
₹48 L
EMD Value
₹96,000
Closing Date
16 Jun 2023, 6:00 pmClosed
GE AF TECH AREA AGRA
GE AF TECH AREA AGRA
REPAIR AND MAINT TO JOINT FILLING AND EPOXY /ELASTOMERIC CONC TO RUNWAY TAXI TRACK LINKS TARMAC AND DISPERSALS UNDER GE AF TECH AREA AGRA
2023_MES_596603_1
8200-1528/E8
Open Tender
Civil Works
Item Rate
180 days
GE AF TECH AREA AGRA
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE AF TECH AREA AGRA
₹96,000
Yes
12 Jul 2023
19 May 2023
19 Jun 2023
19 May 2023
16 Jun 2023
2 Jun 2023
20 May 2023 - 26 May 2023
Amount
M&L for chipping/cutting of cracked/broken edges of cement concrete pavement by cutting rectangular, section by diamond cutters, removing loose particle, unsound material and cleaning the surface by the air compressor and removal of demolished materials/ debris to a distance out side AF Station and appplying one tack coat of epoxy primer and there after at an interval of 30 to 45 minutes pits shall be filled with the epoxy mortar consisting of the following ratio / composition complete all as specified or all as per manufacturers instructions :-. (a) Epoxy resin primer :- (i) Epoxy resin (Araldite) Gy-250 : 100 Part each by weight. (ii) Aradur 140 : 50 part each by weight (b) Epoxy mortar :- (i) Aradur 140 : 50 part each by Weight (ii) Araldite of Gy 250 : 100 Part each by weight. (iii) Silica sand M-12 grade : 600 Part each by weight.
M &L for racking out joints upto a depth at 25mm, saw cutting the vertical sides of joints for making edges of joints straight upto the possible extent by keeping maximum width of joint 10 to 15mm, including cleaning all loose particles/dust from the joints by using brushes, and with the help of air compressor and removing away the existing sealing compound and all other loose materials inside of AF Station where directed. Fixing masking tape along either side of the joints, placing back up sheet 10 to 12 mm thick of dia 25% more than width of joints/backup rod/de-bonding strip (thickness 10 to 12mm) in position and filled with polyurethane based sealing compound (pitch free) ISI marked single compound having 3mm recess from top of joint after applying suitable primer as per manufacturer's instructions and removing masking tape, complete all as per manufacturer's instructions and directed by Engineer-in-Charge. Note :- PU to be mixed and filled by only OEM.
-Ditto- all as per item No-2 but width of joint 16-25mm complete all as specified and directed.
-Ditto- all as per item No-2 but width of joint 26-40mm complete all as specified and directed.
RAJEEV CONSTRUCTION
shubham traders
Abhi Construction
M/s Srijan Construction Company
Rakesh Kumar
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .