Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.7 LAccepted-AOC 19 GIDC ESTATE MAKARPURA VADODARA GUJARAT 390010 UDYAM GJ 24 0006703 24AABCF1382N1ZK R M M MII STATUS AS VERIFIED | VADODARA | GUJARAT | 390010 | ₹32.7 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L1₹1.3 CrAccepted-AOC 217 HANS BHAWAN BAHADUR SHAH ZAFAR MARG NEW DELHI HANS BAHWAN ITO ITO CENTRAL DELHI DELHI 110002 | CENTRAL DELHI | DELHI | 110002 | ₹1.3 Cr | L1 | Accepted-AOC L1 Bidder |
| 3 | L2Rejected-Finance 204 206 DHEERAJ HERITAGE S V ROAD SANTACRUZ WEST SANTACRUZ MUMBAI MAHARASHTRA 400054 | MUMBAI SUBURBAN | MAHARASHTRA | 400054 | - | L2 | Rejected-Finance L2 Bidder |
Tender Value
Refer Docs
Closing Date
25 May 2022, 3:00 pmClosed
Mr. Nilesh Sathe
thyssenKrupp Industrial Solutions (India) Private Limited (Formerly Uhde India Private Limited) Uhde House, L B S Marg, Vikhroli (W), Mumbai - 400083, India.
SUPPLY OF COALESCER FOR P25 PROJECT AT IOCL PANIPAT REFINERY
2022_REFHQ_149700_1
6745-PPM-405-CA-MQ29
Limited
Mechanical - Pressure vessels and other fabrications
Tender cum Auction
240 days
IOCL Panipat Refinery
Please refer Tender documents.
6 documents required · 6 mandatory
Exempted
26 Feb 2024
7 Apr 2022
26 May 2022
7 Apr 2022
25 May 2022
28 Apr 2022
SUPPLY OF COALESCER
Design, Supply of Material, Fabrication, Inspection, Testing, Painting, Documentation, Preparation for Shipment & Transportation to Site of the Fuel Gas Filter / Coalescer (405-LZ-1001 ) along with Accessories, Commissioning spares, Special tools & Tackles and Third party Inspection for EPCM-2, P25 PROJECT at IOCL PANIPAT REFINERY as specified in Material Requisition.
Design, Supply of Material, Fabrication, Inspection, Testing, Painting, Documentation, Preparation for Shipment & Transportation to Site of the Purge Gas Coalescer (406-V-0001) along with Accessories, Commissioning spares, Special tools & Tackles and Third party Inspection for EPCM-2, P25 PROJECT at IOCL PANIPAT REFINERY as specified in Material Requisition.
Design, Supply of Material, Fabrication, Inspection, Testing, Painting, Documentation, Preparation for Shipment & Transportation to Site of the Primary Absorber Water Draw Off Coalescer I (412-V-2006) along with Accessories, Commissioning spares, Special tools & Tackles and Third party Inspection for EPCM-2, P25 PROJECT at IOCL PANIPAT REFINERY as specified in Material Requisition.
Design, Supply of Material, Fabrication, Inspection, Testing, Painting, Documentation, Preparation for Shipment & Transportation to Site of the Primary Absorber Water Draw Off Coalescer II (412-V-2007) along with Accessories, Commissioning spares, Special tools & Tackles and Third party Inspection for EPCM-2, P25 PROJECT at IOCL PANIPAT REFINERY as specified in Material Requisition.
Design, Supply of Material, Fabrication, Inspection, Testing, Painting, Documentation, Preparation for Shipment & Transportation to Site of the Feed Coalescer (417-V-0001) along with Accessories, Commissioning spares, Special tools & Tackles and Third party Inspection for EPCM-2, P25 PROJECT at IOCL PANIPAT REFINERY as specified in Material Requisition.
Design, Supply of Material, Fabrication, Inspection, Testing, Painting, Documentation, Preparation for Shipment & Transportation to Site of the Sweet LPG Coalescer(417-V-0005) along with Accessories, Commissioning spares, Special tools & Tackles and Third party Inspection for EPCM-2, P25 PROJECT at IOCL PANIPAT REFINERY as specified in Material Requisition.
Multitex Filtration Engineers Limited
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .