Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹2.6 Cr
Closing Date
6 Jul 2026, 3:00 pm
Design, supply, erection, testing and commissioning of OHE modification and feeder wire work of 2x25 kV traction system for capacity upgradation of UTR-MWP section (184 RKM/368 TKM) in Lucknow division of Northern Railway.
CEEPROJECT-NER-UTR-MWP
CEEPROJECT-NER-UTR-MWP
Open
24 Months
Lucknow, Uttar Pradesh
₹0
₹2.6 Cr
6 Jun 2026
6 Jun 2026
22 Jun 2026
12 Jun 2026
1-OHE SOR ITEMS
2- NON SCHEDULE ITEM
Item Breakup - 1-OHE SOR ITEMS
Per Track Erection KM 8(b)(iii) Supply without Insulator and erection of material for termination of all aluminium 25KV Feeder / return conductor (Single SPIDER)
Each 8(b)(ix)Supply without insulator and erection of materials for termination of copper cross feeder with gantries.
Set 11(a)(i) Supply without Insulator and erection of cut-in(9Tonne) Insulator
Each 11(a)(ii) Supply without Insulator and erection of a suspension (9Tonne) Insulator
Each 11(b) Supply without Insulator and erection of 25 KV Post Insulator
Each 17(b) Extra for special embedment of earth electrode.
Each 31(a) Transfer of equipment from one mast or support to another.
Each 31(b)Provision of an additional bracket assembly/ assemblies on a mast or support.
Each 31(c)Re-adjustment of head-span
Each 31(e)Dismantling of Feeder/ Return Conductor
Kilometre 31(f)Splicing & extension of an anchored overhead equipment.
Each 31(i)Dismantling of an Isolator
Each 36 (a) Unloading of all type of Steel Structures.
MT 36 (b)Loading of all type of Steel Structures.
MT 32(a) Extra on erection rates (Items of sub-section - I) for work under a power block @ 100% (As per Annexure A in FORM-5 of attached tender document) (description of power block items (As below) given in SECTION-1 (GENERAL) of FORM-5 of attached tender document)
500.00 return conductor (Single SPIDER)
150.00 gantries.
Kilometre Total 20600570.00 Item- 2 SECTION 2 CONCRETE S No. Item No Description of Item Unit Qty Rate Amount 2(a)(i)Concrete for foundation and plinth in hard soil
cum 2(b)In other than hard soil and rock
cum Total 76596894.00 Item- 3 SECTION 3 FERROUS S No. Item No Description of Item Unit Qty Rate Amount 3(a)(ii)Supply & Erection of traction masts, main masts of switching stations, Booster transformer station, fabricated from Rolled mild steel joist (RSJ) of size 203mm x 152 mm x 52.0 Kg/m and galvanised in various lengths .
MT NER HQ-ELECTRICAL/NORTH EASTERN RLY 3(b)(i) Supply and erection of fabricated and galvanised structures (O,N & R type portals) with necessary components other than masts.
MT 3(b)(ii)Supply and erection of Structure steel(traction masts) fabricated and galvanised Type : B-Series Mast
MT 3(b)(iii)Supply & Erection of special fabricated and galvanised steel structures other than Portals & traction- Masts not covered under items 3(b) (i) &3(b)(ii)
MT 3(c)Supply only of fabricated steel other than masts
MT 3(e)(i)Supply and erection of a Guy Rod Assembly
Each 3(i)Supply and erection of 25KV Caution Boards including staff caution Board
Each 4(a)(i)Supply without insulator and erection of Single bracket assembly.
Each 8(a)(v)Supply and erection of Regulating Equipment (3-Pulley type) with counter weight assembly for conventional/ composite OHE.
Each 8(b)(ii) Supply without Insulator and erection of materials for termination of Double overhead equipment conductor.
Each 8(b)(v)Supply without Insulator erection of materials for termination of Earth wire
Each 9(a)Supply without Insulator and erection of anticreep with galvanized steel wire.
Each 16(a)(i) Supply and erection of a structure bond.
Each 16(c) Supply & erection of a transverse and special bond.
Each 17(a) Supply & erection of a single earth electrode.
Each 32(b)Extra on erection rates (Items of sub-section - III) for work under a power block @ 100% (As per Annexure A in FORM-5 of attached tender document
84.00 transformer station, fabricated from Rolled mild steel joist (RSJ) of size 203mm x 152 mm x 52.0 Kg/m and galvanised in various lengths .
270.00 with necessary components other than masts.
2580.00 Type : B-Series Mast
150.00 than Portals & traction- Masts not covered under items 3(b)(i) &3(b)(ii)
Each 33(b)Extra on erection rates for steel work manually under item 3(a)(i), 3(a) (ii), 3(b)(i),3(b)(ii) &3(b)(iii) @ 50%.(As per Annexure B in FORM-5 of attached tender document
84.00 transformer station, fabricated from Rolled mild steel joist (RSJ) of size 203mm x 152 mm x 52.0 Kg/m and galvanised in various lengths .
270.00 with necessary components other than masts.
2580.00 Type : B-Series Mast
150.00 than Portals & traction- Masts not covered under items 3(b)(i) &3(b)(ii) Total 212857072.00 Item- 4 SECTION 4 NON-FERROUS S No. Item No Description of Item Unit Qty Rate Amount 6(az)Supply and erection of Over Head equipment only
Kilometre NER HQ-ELECTRICAL/NORTH EASTERN RLY
Kilometre 7(d)Supply and Manual Erection of all aluminium 25KV Feeder/ Return conductor (Single Spider)
Kilometre 7(e)Supply and Erection of copper cross feeder wires (37/2.25 mm HDBC) across the track at SP/SSP/FP/BT locations
Kilometre 10(az)Extra on item 6(az) for supply and erection of additional fittings at a turn-out, diamond crossing or overlap
Each 12(az)Supply without Insulator & erection of a section insulator assembly
Each 12(d)Supply & Erection of a Ceramic/beaded Glass Fibre type (PTFE) Short Neutral section assembly
Each 15(a)(i)upply & erection of large copper jumpers
Each 15(a)(ii) Supply & erection of small copper jumpers
Each 15(b)Supply and erection of an aluminum jumper.
Each 15(d)Supply of materials and erection of Large copper jumper 160 Sq. mm between Aluminium bus and cross feeders
Each 15(e)Supply of materials and erection of Large copper jumper 160 Sq. mm between cross feeder and OHE
Metre 32(c)Extra on erection rates (Items of sub-section - IV) for work under a power block @ 100% (As per Annexure A in FORM-5 of attached tender document)
5.00 track at SP/SSP/FP/BT locations
14.00 section assembly
550.00 and cross feeders
250.00 OHE Total 52143598.00 Item- 5 SECTION 5 INSULATOR S No. Item No Description of Item Unit Qty Rate Amount 4(ax)Supply of insulators for item 4(a)(i) & 4(a)(iii)
Each 8(bx) Supply of 9- Tonne insulators for item 8(b)(i),(ii),(iii), (iv),(vi),(vii), (viii)& (ix)
Each 11(ax) Supply of 9- Tonne insulator for item 11(a)(i) &11(a)(ii)
Each 11(bx) Supply of 25 KV post insulator for item 11(b)
Each Total 18389572.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Tenderdocument.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_7ACS-7.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_8ACS-8.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_9ACS-9.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_10ACS-10.pdf
ATTACHMENT
2026_03_13IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_111_compressed.pdf correction
ATTACHMENT
Prebidmeeting.pdf
ATTACHMENT
2022_CE-I_CT_GCC-2022Policy14_07_2022.pdf
ATTACHMENT
2022_12_13RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril2022ACSNo_2.pdf
ATTACHMENT
correction
ATTACHMENT
correction
ATTACHMENT
correction
ATTACHMENT
2023_12_21IndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_6ACS-61.pdf
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27_04_22.pdf
ATTACHMENT
PSIGuideline.pdf
ATTACHMENT
OHEguidelinessignedandapproved1_compressed.pdf
ATTACHMENT
2023_04_26RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_3ACS-311.pdf
ATTACHMENT
2023_04_26RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_4ACS-4.pdf
ATTACHMENT
2023_10_20RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_5ACS-53.pdf
ATTACHMENT
2026_03_13IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_111_compressed.pdf
ATTACHMENT
Download all tender documents and submit your bid