| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.4 LAccepted-AOC 690 MELA STREET AGARAM ALAGAPURAM PO ANDIMADAM TK ARIYALUR DIST 608901 | ANDIMADAM | ARIYALUR | TAMIL NADU | 608901 | L1 | Accepted-AOC L1 | |
| 2 | L2₹41.6 L+₹15,944.75 (0.39%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹42.0 L
EMD Value
₹43,000
Closing Date
23 May 2024, 3:00 pmClosed
Additional Collector (Development)
DRDA, Salem
Salem District - Tharamangalam Block - Strenthening the Road from Mallikuttai Nangavalli Feeder Road to Periyahounanur via Mallikuttai BT Road Package No.SLM-09/2023-24 under MGSMT- Savings Fund - 2023-24
2024_RDTN_449137_9
Roc.No.1304/2024/A3
Open Tender
Civil Works - Roads
Item Wise
180 days
DRDA
As per tender Document
3 documents required · 3 mandatory
₹0
₹43,000
DRDA, Salem
25 Jun 2024
15 Mar 2024
23 May 2024
15 Mar 2024
23 May 2024
15 Mar 2024
22 Mar 2024
Amount
STRENGTHENING THE ROAD FROM MALLIKUTTAI NANGAVALLI FEEDER ROAD TO PERIYAGOUNDANUR VIA MALLIKUTTAI BT ROAD H/O MALLIKUTTAI
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. KM 0/0-1/225
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS KM 0/0-1/225
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq m KM 0/0-1/225
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. KM 0/0-1/225 KM 0/0-1/225
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. KM 0/0-1/225
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., KM 0/0-1/225
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 KM 0/0-1/225
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including eflectorishing glass beads @250 gms per sqm area ,thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35 ,The finished surface to be leveluniform and free fromstreaks and holes etc ,complete as per MORTH &H Specification No 803 KM 0/0-1/225
Provision for KM Stone
Provision forHM Stone
60cm Equilateral triangle
Provision for Name Board including painting,and Lettering including cost and conveyance of all materials and labours etc., complete
Provision for Photographic charges
SUB ESTIMATE RETAINING WALL
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Provision for PVC Pipe for seepage
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
ACM AND CO
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .