Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹204 CrAccepted-AOC PLAT NO 943 54TH STREET T V S COLONY ANNANAGAR WEST EXTENSION CHENNAI PIN 600 101 | CHENNAI | CHENNAI | TAMIL NADU | 600101 | ₹204 Cr | L1 | Accepted-AOC 1st lowest |
| 2 | L2₹228.5 CrRejected-Finance PLOT NO 9 GROUND FLOOR HIGH TECH MADHAPUR KONDAPUR HYDERABAD TELANGANA 500084 | HYDERABAD | TELANGANA | 500084 | ₹228.5 Cr | L2 | Rejected-Finance Rejected as the bid is not L1 (Not Lowest One) |
| 3 | L3₹237.7 CrRejected-Finance | ₹237.7 Cr | L3 | Rejected-Finance Rejected as the bid is not L1 (Not Lowest One) |
Tender Value
Refer Docs
EMD Value
₹10 L
Closing Date
17 Jul 2023, 6:00 pmClosed
Commissioner, Siliguri Municipal Corporation
Siliguri Municipal Corporation Baghajatin road, court more , Siliguri 734001
Survey, Sub-soil Investigation, Design, Construction, Supply, Erection and Commissioning of RCC Raw Water Intake Structure (Fixed type), containing Intake Well allowing at least 211.80 MLD Raw water 2nd call refer detailed Nit.....
2023_MAD_543953_1
3/WBMAD/SMC/AMRUT-2.0/WS/23-24
Open Tender
CIVIL AND ELECTRICAL WORKS
540 days
Siliguri Municipal Corporation
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹10 L
Conference Hall Siliguri Municipal Corporation
21 Dec 2024
23 Jun 2023
19 Jul 2023
23 Jun 2023
17 Jul 2023
23 Jun 2023
23 Jun 2023 - 12 Jul 2023
11 Jul 2023
Amount
Survey, Sub-soil Investigation, Design, Construction, Supply, Erection & Commissioning of RCC Raw Water Intake Structure(Fixed type), containing Intake Well allowing at least 211.80 MLD Raw water withdrawal in 21 hrs pumping, Jetty , Electrical Substation, Pump House on Intake structure including required Pumping machineries, electromechanical equipments, appliances with all related accessories, 27.5 Km(approx) long Raw Water Transmission Main of minimum 1200 mm dia MS pipe with thickness 12.5 (min) , steel Pipe bridges, Jack pushing Works to cross rivers, Jhora, canals, railways, highways etc, wherever required for delivering 138.61 MLD raw water at proposed Water Treatment Plant at Fulbari from Intake well in the river Teesta at upstream of Gajoldoba Barrage on EPC-turnkey basis including 3(Three) months Trial Run and subsequent 60 (Sixty) months Operation and Maintenance complete for Augmentation of Water Supply Scheme (Phase-I) for Siliguri Municipal Corporation & En-route Rural Areas under AMRUT-II.
Cap.EX. iimplies Capital Expenditure for survey design,construction including all required supply, survey,investigation, design, testing,commissioning,trial run,quality assurance as per demand of relevant IS/tender,vetting from prescribed authority,obtaining pre-execution appraisal from technical authority of TIA, complete in EPC mode as per specified scope and norms, in line with the intervention & direction of the Engineer in charge.
Op.EX.implies expenditure for Operation and maintanance of the installed infrastructure, equipments,machineries and appliances for a period of 60 months ensuring smooth and effective run of the comprehensive system under the contract to obtain designed discharge from intake well and delivery of designed quantity (discharge) at inlet of Water treatment Plant at fulbari. Quoted value for Operation and maintenance (Op.Ex.) should no way be less than 1.2% of quoted value for Cap.Ex.
Sudhakara Infratech Private Limited
Rajkamal Builders Infrastructure Pvt. Ltd.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid