| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.3 LAccepted-AOC NO 103 KAMARAJ NAGAR 1ST STREET BHAVANI 638301 ERODE DT | BHAVANI | ERODE | TAMIL NADU | 638301 | ₹37.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹38.2 LRejected-AOC 57 KAMARAJ STREET KOLAPPALUR GOBICHETTIPALAYAM ERODE 638 456 | GOBICHETTIPALAYAM | ERODE | TAMIL NADU | 638456 | ₹38.2 L | L2 | Rejected-AOC L2 |
| 3 | L3₹39.6 LRejected-AOC | ₹39.6 L | L3 | Rejected-AOC L3 |
| 4 | L4₹40.3 LRejected-AOC 27 KARUPANAN STREET NAICKEN KADU GOBI 638 476 ERODE DIST | GOBI | ERODE | TAMIL NADU | 638476 | ₹40.3 L | L4 | Rejected-AOC L4 |
| 5 | L5₹42.8 LRejected-AOC 13 1 3 PUDHUSAMPALLI RAMAN NAGAR METTUR DAM 636 403 | METTUR DAM | SALEM | TAMIL NADU | 636403 | ₹42.8 L | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | MANICKAVASAGAM L6 | sai pranesh infrastructures L2 | H.Venkateswaran L3 | mk constructions L1 | creepers engineering contractors L8 | P.V.CONSTRUCTIONS L4 | PA and CO L5 | Haribalakrishnan L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Supplying of MS Tower Parts | 17 | MT | 92,000 ₹15.6 L | 85,000 ₹14.4 L | 95,000 ₹16.1 L | 92,000 ₹15.6 L | 90,000 ₹15.3 L | 97,500 ₹16.6 L | 1,00,000 ₹17 L | 95,000 ₹16.1 L |
| 2.00 | Supplying of various size bolt & nuts | 0.95 | MT | 1,00,000 ₹95,000 | 1,10,000 ₹1.0 L | 1,10,000 ₹1.0 L | 1,20,000 ₹1.1 L | 1,20,000 ₹1.1 L | 1,10,000 ₹1.0 L | 95,000 ₹90,250 | 1,25,000 ₹1.2 L |
| 3.00 | Supplying of Name Board | 3 | No | 350 ₹1,050 | 500 ₹1,500 | 2,000 ₹6,000 | 1,100 ₹3,300 | 500 ₹1,500 | 400 ₹1,200 | 500 ₹1,500 | 1,600 ₹4,800 |
| 4.00 | OPGW 46 fiber cable tension fitting | 6 | set | 4,000 ₹24,000 | 6,000 ₹36,000 | 10,000 ₹60,000 | 5,000 ₹30,000 | 7,500 ₹45,000 | 5,000 ₹30,000 | 5,000 ₹30,000 | 6,000 ₹36,000 |
| 5.00 | OPGW coiling bracket | 1 | set | 5,000 ₹5,000 | 7,000 ₹7,000 | 10,000 ₹10,000 | 5,000 ₹5,000 | 1,500 ₹1,500 | 6,000 ₹6,000 | 6,000 ₹6,000 | 12,000 ₹12,000 |
| 6.00 | Clearing the Light jungle in way leave including cost of all labour, lead, lift etc complete. | 1,675 | m2 | 5 ₹8,375 | 1 ₹1,675 | 1 ₹1,675 | 2 ₹3,350 | 10 ₹16,750 | 1 ₹1,675 | 1 ₹1,675 | 0.1 ₹167.50 |
| 7.00 | HGS SS.20.A. Earth work excavation for foundation and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS.20B and as per standard specification | 29.25 | m³ | 100 ₹2,925 | 250 ₹7,312.50 | 200 ₹5,850 | 150 ₹4,387.50 | 350 ₹10,237.50 | 100 ₹2,925 | 100 ₹2,925 | 170 ₹4,972.50 |
| 8.00 | SDR - (Not Requiring Blasting) Earth work excavation for foundation and depositing on bank with initial lead of 10 m & initial lift of 2m in Soft disintegrated rock, laterite, soft rock or kankar, not requiring blasting and as per standard specification. | 29.25 | m³ | 100 ₹2,925 | 250 ₹7,312.50 | 200 ₹5,850 | 150 ₹4,387.50 | 550 ₹16,087.50 | 100 ₹2,925 | 100 ₹2,925 | 230 ₹6,727.50 |
| 9.00 | MR & DMR - Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2 m in Medium Rock and Dense Medium Rock not requiring blasting as per standard Specification . | 44 | m³ | 200 ₹8,800 | 250 ₹11,000 | 300 ₹13,200 | 350 ₹15,400 | 600 ₹26,400 | 200 ₹8,800 | 200 ₹8,800 | 330 ₹14,520 |
| 10.00 | MR & DMR - Earth work excavating in Medium Rock and Dense Medium Rock requiring blasting as per standard Specification. | 30 | m³ | 200 ₹6,000 | 250 ₹7,500 | 1,000 ₹30,000 | 900 ₹27,000 | 650 ₹19,500 | 200 ₹6,000 | 200 ₹6,000 | 500 ₹15,000 |
Tender Value
Refer Docs
EMD Value
₹48,000
Closing Date
31 Dec 2025, 2:00 pmClosed
SE GCC CBE
Office of the Superintending Engineer 182 Dr Subbarayan Street Tatabad Coimbatore 641 012
Supply and Erection of 110 KV DC line on DC towers and stringing of 6 Nos Panther conductor 1no Earthwire for making LILO of the existing 110 KV Ingur to Kurukkathi II feeder at the Madavilagam 110 33 11 KV SS
2025_EB_632437_1
ETS No. 53/25-26 of SE GCC Cbe
Open Tender
Civil Works
erode
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹48,000
Yes
13 Mar 2026
15 Dec 2025
31 Dec 2025
15 Dec 2025
31 Dec 2025
15 Dec 2025
Supplying of MS Tower Parts
Supplying of various size bolt & nuts
Supplying of Name Board
OPGW 46 fiber cable tension fitting
OPGW coiling bracket
Clearing the Light jungle in way leave including cost of all labour, lead, lift etc complete.
HGS SS.20.A. Earth work excavation for foundation and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS.20B and as per standard specification
SDR - (Not Requiring Blasting) Earth work excavation for foundation and depositing on bank with initial lead of 10 m & initial lift of 2m in Soft disintegrated rock, laterite, soft rock or kankar, not requiring blasting and as per standard specification.
MR & DMR - Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2 m in Medium Rock and Dense Medium Rock not requiring blasting as per standard Specification .
MR & DMR - Earth work excavating in Medium Rock and Dense Medium Rock requiring blasting as per standard Specification.
Earth work excavating in Hard rock measured in solid including blasting and stacking as per standard Specification.
Earth work excavation for foundation in Removing Hard Rock by wedging, chiseling and trimming to proper shape and stocking for measurement, as per standard specification complete.
Check Survey and pit marking of various tower location inlcuding hire charges for theodolite instrument, cost of all materials labour, lead, lift etc complete.
Labour charges of setting of stub and cleat of (using template / modern technique) KCR Tower with correct level and alignment and hire charges of template, with all labour, lead, lift, etc., as per Standard specification complete.
Plain cement concrete in CC 1:3:6 mix, using 20 mm HB metal for tower foundation concrete without formwork including cost of cement and all materials, labour, curing, lead, lift, etc., complete as per standard specification.
Plain cement concrete in CC 1:2:4 mix using 20 mm HB metal for tower foundation concrete with steel formwork including cost of cement and all materials, labour,curing,lead, lift, etc., complete as per standard specification.
Plain cement concrete in CC 1:2:4 mix, using 20 mm HB metal for Chimney concrete with steel formwork including cost of cement and all materials, labour, curing, lead, lift, Vibration charges etc., complete as per standard specification.
Supplying and fixing of pipe type earthing including necessary excavation for fixing of 3 M long 40 mm dia GI ‘B’ class pipe and refilling with excavated earth mixed with salt and charcoal and connect the GI earth strips with the legs of the stub including cost of pipe refilling charges, fixing charges transport lead, lift, labour, etc., as per standard specification complete.
Supplying and fixing of Terminal earthing including necessary excavation for fixing of 3 M long 40 mm dia GI ‘B’ class pipe and refilling with excavated earth mixed with salt and charcoal and connect the GI earth strips with the legs of the stub including cost of pipe refilling charges, fixing charges transport lead, lift, labour, etc., as per standard specification complete.
Refilling the tower location using excavated earth other than sand consolidation in 150mm layers well watered, consolidation etc. including cost of all labour, lead, lift etc as per instruction of TANTRANSCO Engineer at site complete.
Disposal of Excess surplus earth away in low lying area with a lead of 2km distance including cost of spreading chrages ,levelling charges and transporting charges all labour, lead, lift etc., as per instruction of TANTRANSCO Engineer at site complete.
Plastering with CM 1:3, 12mm thick including cost of all materials, lead, lift, curing etc as per standard specification complete.
Erection of tower parts with bolts and nuts, tightening, punching of bolt and nuts (If necessasary) and rectification of defects in tower parts if any including hire charges of Tools & Plant's, transporting of tower parts from stores to site, sorting out of tower parts, tack welding of bolt and nut upto bottom cross arm level (3 Tack per bolt), Painting using anti corrossive black paint on each tower leg upto1m height from coping level, Final Checking to the satisfaction of field Engineers, loading and loading all labour, lead, lift, etc complete as per standard specification complete .
Tack welding of bolts & nuts in the newly erected towers upto bottom cross arm level including of three tack weld for each bolts & nuts hire charges of welding machine, cost of welding rods, transporting charges and Zinc Chromite painting with cold galvanizing and tightening of bolts wherever necessary including cost of all materials, labour, lead, lift, transporting hire charges etc., complete.
Painting the tower leg with Anti-corrosive black paint upto height of 1m from ground level including cost of paint, labour, lead, lift etc., complete.
Paving out, rough sagging , Tensioning of 6 Nos. ACSR Panther Conductor transporting charges from store to site, loading and unloading charges including hire charges for major & minor Tools & Plant's all labour, lead, lift etc., as per standard Specification complete.
Paving out rough sagging tensioning of 1 No. earth wire for clipping jumper connection including cost of lead lift labour major & minor T&P's etc., complete.
Releasing, lowering of existing 3 Nos panther conductor including cost of all major and minor T&P with all Leads,Lifts, etc. Complete.(under LC Condition)- For one span
Restringing the same conductor including cost of all major and minor T&P with all Leads,Lifts, etc. Complete.(under LC Condition)
Restringing the same earthwire including cost of all major and minor T&P with all Leads,Lifts, etc. Complete.(under LC Condition)
Providing temporary guys for rough sagging and single tensioning with necessary excavation of pits fixing of rail etc., and dismantling stay after completion of work including major & minor T&P's steel ropes with all labour, lead, lift etc., complete as per std., specification.
Arranging and availing line clear in HT/LT/EHT lines during stringing and dismantling works including cost of labour for lowering and retensioning and jumber connections of HT/LT/EHT, lines earthing, lead, lift, T&P's etc., complete.
Transport and Hoisting of 7 units of suspension insulators with fittings transporting from stores to site including cost of all T & P's with all labour, lead, lift etc., complete.
Transporting and Hoisting of 8 units of Single Tension insulators with fittings transporting from stores to site including cost of all T&P's with all labour, lead, lift etc., complete as per standard specification.
Labour charges for Cutting and felling of Large size various type of trees complete.
Labour charges for Cutting and felling of Small size various type of trees complete.
Labour charges for fixing number plates including all cost of labour, lead, lift, etc complete.
Labour charges for fixing phase plates including all cost of labour, lead, lift,etc complete.
Labour charges for fixing danger board including all cost of labour, lead lift etc complete.
Labour charges for Name Board including all cost of labour, lead lift etc complete.
Collection of Field Maps and Revenue records: Towards the charges for collection of field maps, patta, chitta, land owners details, etc., pertaining to both sides of approved alignment as instructed by the Department Officers for survey numbers involved from the starting chainage to ending chainage of this project for the proposed alignment for formation of corridor. (Field work to collect details)
Conversion of Individual FMB into Auto CAD File: Identification of respective lands that are corridored by the Transmission Line by Transect Walking System aiding with GPS devices along the center line of the corridor. Preparation of rough alignment sketch by denoting the Survey Numbers of the land that pass through. Based on the sketch, conversion of indivdual FMB Sketch with Ladder measurements that are corridored by the Transmission Line to be done within the Tolerance Limit in AutoCAD. Tolerance Limit shall be applied as per the Survey of India's Guidelines.
Combining FMB Sketches and converting into KML File: As per prevailing practices/guidelines, width markings to be carried out on either side from mid-line for entire individual FMB Sketches that pass through the Transmission Line Corridor. Further, entire Individual FMB sketches to be combined for forming alignment Topo Drawing. Profiling of the combined FMB Sketches in the field by providing Control Points at every 2km interval using DGPS Instrument. With Reference to the Control Points, the entire Transmission Line Corridor to be compiled as KML File.
Conducting Topographical Surveying: Towards the charges for conducting topographical survey along the Transmission Line to ascertain a corrider width by using Total station (Detailed field survey), including taking of all existing features in the field. The base area of all the towers to be surveyed, Total land area of all the Land owners to be surveyed with the reference of survey stones. Cost of leads, lifts, conveyance, survey tools & plants, hire charges, all labour charges, head loads etc., to be accompanied by the contractor itself.
Sub-Division Work: Towards the charges for marking Transmission Line Corridor, Tower Base in the individual FMB sketches and combined FMB Sketches. Calculation of land areas of Tower base, Transmission Alignment along with Corridor Width and identification of land owners. Sub-division sketches to be formed based on the identified land areas.
Print: Individual FMB, Combined FMB Sketch, Patta, Sub-division FMB, Topo Map - 6 Sets Colour print.
Marking of Village Topo-map: Marking radius of 400m, 800m, 1200m, 1600m from the centre oint of location to be marked in the village Topo-map by using AutoCAD software by using guidelines of the Survey of India.
Preparation of documents for fixing land value: Preparation of 6 sets of documents required for arriving land compensation including obtaining sales value from Registration Department for all survey numbers within 400m radius, 800m (R), 1200m (R) and 1600(R) for fixing the market value of lands for Survey numbers in Tower locations / Transmission Corridor and assisting the Revenue officials at the Collectrate Land Section as per the guidelines of the Revenue Department.
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
53s.pdf
Tender Documents • 0.60 MB
BOQ_756630.xls
BOQ • 0.75 MB
Download all tender documents and submit your bid