| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.4 LAccepted-AOC | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹24.5 L+₹8,133 (0.33%)Rejected-Finance | L2 | Rejected-Finance L2 bidder | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical EMD/Fee not received | |
| 4 | Not Admitted-Fee/PreQual/Technical 173 SHAMLI SHIV VIHAR RAIL PAR SHAMLI UTTAR PRADESH 247776 | SHAMLI | UTTAR PRADESH | 247776 | - | Not Admitted-Fee/PreQual/Technical EMD/Fee not received |
Tender Value
₹28.3 L
EMD Value
₹57,000
Closing Date
10 Oct 2020, 3:00 pmClosed
DGM
Admin Building, Omkareshwar Power Station NHDC Ltd
Painting of Draft Tube Gates and Draft tube Groove Covers at Omkareshwar Power Station
2020_NHDC_584952_1
NHDC/3/C/086/NIT-475/20/1600 dated 18/09/2020
Open Tender
Machineries/ Mechanical Engg Items
Works
120 days
Omkareshwar Power Station, Siddhwarkut, NHDC Ltd
Please refer Tender documents.
10 documents required · 10 mandatory
₹590
Yes
NHDC Limited
₹57,000
Yes
16 Feb 2021
19 Sept 2020
14 Oct 2020
19 Sept 2020
10 Oct 2020
19 Sept 2020
19 Sept 2020 - 3 Oct 2020
Amount
Painting of Spillway gates, sluice gates, canal gates (both vertical or radial),stop log gates, exposed embedded parts and all un machined ferrous surface (hoist cylinders, cylinder heads,hydraulic piping, pipe fittings, bonnet covers), exposed to water as per IS 14177,for which surface preparation by blast cleaning of class "B" primer coat (one coat) of inorganic zinc silicate (preferably airless spray)or alternatively, two coats of zinc rich primer(containing not less than 85% zinc on dry film) to give dry film thickness of 70 ± 5 micron and finish coat (two coats) of solvent less coal tar epoxy paint using airless spray to provide dry film thickness of 150±5 micron per coats. Thus, total dry film thickness of all the coats, including primer coating, should not be less than 350 microns, this will be include expenses on mobilisation and demobilisation of equipments. For maintenance painting the surface preparation shall be done by appropriate hand and power tool cleaning, prior to hand power tool cleaning. Any heavy layer of rust should be removed by chipping visible oil, grease, dirt and other foreign material be cleaned using solvents like clean mineral spirits, xylot or white gasoline. After hand and power tool cleaning the surface should be cleaned of loose dust and debris and/or blast cleaned as laid down in para 7.0 of IS code 14177. After the surface preparation the primer and finishing coats shall be carried out as provided above for painting etc. complete. Upto 1.5 m height
Painting of Spillway gates, sluice gates, canal gates (both vertical or radial),stop log gates, exposed embedded parts and all un machined ferrous surface (hoist cylinders, cylinder heads,hydraulic piping, pipe fittings, bonnet covers), exposed to water as per IS 14177,for which surface preparation by blast cleaning of class "B" primer coat (one coat) of inorganic zinc silicate (preferably airless spray)or alternatively, two coats of zinc rich primer(containing not less than 85% zinc on dry film) to give dry film thickness of 70 ± 5 micron and finish coat (two coats) of solvent less coal tar epoxy paint using airless spray to provide dry film thickness of 150±5 micron per coats. Thus, total dry film thickness of all the coats, including primer coating, should not be less than 350 microns, this will be include expenses on mobilisation and demobilisation of equipments. For maintenance painting the surface preparation shall be done by appropriate hand and power tool cleaning, prior to hand power tool cleaning. Any heavy layer of rust should be removed by chipping visible oil, grease, dirt and other foreign material be cleaned using solvents like clean mineral spirits, xylot or white gasoline. After hand and power tool cleaning the surface should be cleaned of loose dust and debris and/or blast cleaned as laid down in para 7.0 of IS code 14177. After the surface preparation the primer and finishing coats shall be carried out as provided above for painting etc. complete. Beyond 1.5 m height
Painting of machinery, including gearing, housing, shafting, bearing, pedestals, oil tanks, control cabinets, hoist beams, pipe support, clamps, ladders etc., of hoists and supporting structures, as per IS 14177, for which surface preparation by blast cleaning of class 'B', primer coat (one coat) of Zinc phosphate paint to give a minimum dry film thickness of 50 ± 5 microns and finish coat(three coats) of aluminium paint or synthetic enamel paint, using airless spray, to provide a dry film thickness of 25 ± 5 microns per coat. Thus, total dry film thickness of all the coats, including primer coat, should not be less than 125 microns. This will include expenses on mobilisation and demobilisation of equipment’s. For maintenance painting, the surface preparation shall be done by appropriate hand and power tool cleaning. Prior to hand and power tool cleaning, any heavy layer of rust should be removed by chipping. Visible oil, grease, dirt and other foreign material be cleaned using solvents like clean mineral spirits, xylol or white gasoline. After hand and power tool cleaning, the surface should be cleaned of loose dust and debris and / or blast cleaned as laid down in para 7.0 of IS Code14177. After the surface preparation, the primer and finishing coats shall be carried out as provided above for painting etc. complete. Upto 1.5 m Height
Vishal Engineering
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .