Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.4 LAccepted-Finance SCHEME NO 07 BLOCK NO 22 FLAT NO 03 NEW GURDASPUR DISTT GURDASPUR PB 143521 | GURDASPUR | PUNJAB | 143521 | L1 | Accepted-Finance Lowest | |
| 2 | L2₹38.8 L+₹42,400 (1.11%)Rejected-Finance 29 MODEL TOWN BEHIND GURUDWARA PATHANKOT | PATHANKOT | PATHANKOT | PUNJAB | 145001 | L2 | Rejected-Finance Other than lowest | |
| 3 | L3₹48.2 L+₹9.8 L (25.6%)Rejected-Finance | L3 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | P S BUILDERS L3 | kailu construction co L2 | HARPAL ENGINEERS AND BUILDERS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Attending of day to day electrical complaints pertaining to internal electrification received through telephone/ Armaan or in person on detailment at MES Service centre located at Tibri Mil Stn area by locating and rectification of fault from and including electric meter/DB onwards in respect of sub main/point wiring including provisioning of small pieces of electric cable of size 1.5/2.5 Sqmm to 10 Sqmm single core copper conductor and length not exceeding 0.50 mtrs and fixtures for power and light socket/light, fan and bell etc and carrying out repairs to the extent of tightening of loose connections, disconnection and dismantling of faulty wires, battens, conduits, boxes, main switches, MCB's, DB's and other E/M fixtures including providing necessary screws / nuts / bolts / nails for the rectification of defect and refixing of existing dismantled serviceable items and replacement of defective items with new ones complete all as specified and directed.
(Note - (i) Cost of labour for the fixing/replacement of unserviceable item shall deemed to be included in item No 1 and cost of store replaced shall be measured as supply only against relevant items). | 14,000 | Per complaint | 9.58 ₹1,34,120 Lowest | 20 ₹2,80,000 | 23 ₹3,22,000 |
| 1.01(ii) Complaint pertaining to location and rectification of fault in more than one length of point wiring/sub main wiring/DB's/fitting or fixtures etc shall be considered as an independent complaint. Similarly complaint pertaining to replacement of two fixtures in one Qtr will also be measured and paid as one complaint. (iii) Replacement of more than two fixtures/items but multiple of three fixtures or part thereof in one Qtr/Bldg will be measured as an additional complaint. (iv) In case a Qtr/room is found locked when tradesman is detailed to attend the complaint, the complaint shall be treated as one till its completion. (v) Necessary tools for tradesman shall be provided by the contractor. (vi) Transportation for tradesman and normal stores required for complaints shall be arranged by the contractor. (vii) Complaints of normal nature shall be attended and rectified within 3 hours of receipt of complaint. However, complaints of emergent nature i.e no light, short circuit, earth fault etc shall be attended immediately on receipt of complaint round the clock. (viii) Bldgs requiring rewiring of small qty of point wiring if ordered will be measured and paid separately under respective items below | ||||||
| 1.02(ix) Bldgs requiring rewiring of small qty of point wiring if ordered will be measured and paid separately under respective items. (x) Contractor will deposit all the items to EM Store in advance and unsv items will be collected by the contractor as schedule of credit (xi) Electrician will report to AGE EM complaint cell at 9 O'Clock daily for collecting of complaints. Complaint received on Armaan application will be done in the same day and after completion of complaint Electrician will report to Armaan Cell for uploading the completion report. (xii) Contractor shall deploy local electrician for the job so that urgent nature of complaints like no light, short circuit and earth fault will also done on Holidays/ Sunday. | ||||||
| 2.00 | Supply only in replacement switch piano flush type 5 Amps One-way, AC 230V on existing switch board all as specified and as directed. | 1,500 | Each | 18 ₹27,000 Lowest | 20 ₹30,000 | 18 ₹27,000 Lowest |
| 3.00 | Supply only in replacement of switch piano flush type 15 Amps single pole one-way, 230V complete all as specified and as directed. | 450 | Each | 78 ₹35,100 | 90 ₹40,500 | 70 ₹31,500 Lowest |
| 4.00 | Supply only in replacement switch piano type two ways AC 230 volts 6 Amps as per on existing switch board . | 50 | Each | 18 ₹900 Lowest | 25 ₹1,250 | 30 ₹1,500 |
| 5.00 | Supply only in replacement socket out let 2-in-1, 3 Pin 6 Amps flush type 230 volts complete all as specified and as directed. | 800 | Each | 28 ₹22,400 Lowest | 35 ₹28,000 | 40 ₹32,000 |
| 6.00 | Supply only in replacement socket outlet, flush type, 2-in-1, 3 pins, 6 & 16 Amps multipurpose complete all as specified and as directed. | 700 | Each | 78 ₹54,600 | 90 ₹63,000 | 60 ₹42,000 Lowest |
| 7.00 | Supply only in replacement bell push switch piano, flush type, 5 Amps complete all as specified and as directed. | 200 | Each | 18 ₹3,600 Lowest | 25 ₹5,000 | 30 ₹6,000 |
| 8.00 | Supply only in replacement batten type angular/ Batten lamp holder insulated body with back plate suitable for batten fitting including PVC round block complete all as specifed and as directed. | 400 | Each | 38 ₹15,200 | 25 ₹10,000 Lowest | 40 ₹16,000 |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
10 Jun 2026, 6:00 pmClosed
Garrison Engineer, Gurdaspur.
Garrison Engineer, Gurdaspur (Tibri)
Day to day complaint of internal electric supply and allied works at Tibri Mil Stn under GE Gurdaspur
2026_MES_763625_1
GE GSR-24/2026-2027
Open Tender
Electrical and Maintenance Works
Item Rate
240 days
Garison Engineer
As per Tender Documents
8 documents required · 8 mandatory
₹500
GE Gurdaspur
₹98,000
25 Jun 2026
6 May 2026
17 Jun 2026
6 May 2026
10 Jun 2026
26 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Attending of day to day electrical complaints pertaining to internal electrification received through telephone/ Armaan or in person on detailment at MES Service centre located at Tibri Mil Stn area by locating and rectification of fault from and including electric meter/DB onwards in respect of sub main/point wiring including provisioning of small pieces of electric cable of size 1.5/2.5 Sqmm to 10 Sqmm single core copper conductor and length not exceeding 0.50 mtrs and fixtures for power and light socket/light, fan and bell etc and carrying out repairs to the extent of tightening of loose connections, disconnection and dismantling of faulty wires, battens, conduits, boxes, main switches, MCB's, DB's and other E/M fixtures including providing necessary screws / nuts / bolts / nails for the rectification of defect and refixing of existing dismantled serviceable items and replacement of defective items with new ones complete all as specified and directed.
(Note - (i) Cost of labour for the fixing/replacement of unserviceable item shall deemed to be included in item No 1 and cost of store replaced shall be measured as supply only against relevant items). | 14,000 | Per complaint | - | - |
| 1.01 | (ii) Complaint pertaining to location and rectification of fault in more than one length of point wiring/sub main wiring/DB's/fitting or fixtures etc shall be considered as an independent complaint. Similarly complaint pertaining to replacement of two fixtures in one Qtr will also be measured and paid as one complaint.
(iii) Replacement of more than two fixtures/items but multiple of three fixtures or part thereof in one Qtr/Bldg will be measured as an additional complaint.
(iv) In case a Qtr/room is found locked when tradesman is detailed to attend the complaint, the complaint shall be treated as one till its completion.
(v) Necessary tools for tradesman shall be provided by the contractor.
(vi) Transportation for tradesman and normal stores required for complaints shall be arranged by the contractor.
(vii) Complaints of normal nature shall be attended and rectified within 3 hours of receipt of complaint. However, complaints of emergent nature i.e no light, short circuit, earth fault etc shall be attended immediately on receipt of complaint round the clock.
(viii) Bldgs requiring rewiring of small qty of point wiring if ordered will be measured and paid separately under respective items below | - | - | - | - |
| 1.02 | (ix) Bldgs requiring rewiring of small qty of point wiring if ordered will be measured and paid separately under respective items.
(x) Contractor will deposit all the items to EM Store in advance and unsv items will be collected by the contractor as schedule of credit
(xi) Electrician will report to AGE EM complaint cell at 9 O'Clock daily for collecting of complaints. Complaint received on Armaan application will be done in the same day and after completion of complaint Electrician will report to Armaan Cell for uploading the completion report.
(xii) Contractor shall deploy local electrician for the job so that urgent nature of complaints like no light, short circuit and earth fault will also done on Holidays/ Sunday. | - | - | - | - |
| 2 | Supply only in replacement switch piano flush type 5 Amps One-way, AC 230V on existing switch board all as specified and as directed. | 1,500 | Each | - | - |
| 3 | Supply only in replacement of switch piano flush type 15 Amps single pole one-way, 230V complete all as specified and as directed. | 450 | Each | - | - |
| 4 | Supply only in replacement switch piano type two ways AC 230 volts 6 Amps as per on existing switch board . | 50 | Each | - | - |
| 5 | Supply only in replacement socket out let 2-in-1, 3 Pin 6 Amps flush type 230 volts complete all as specified and as directed. | 800 | Each | - | - |
| 6 | Supply only in replacement socket outlet, flush type, 2-in-1, 3 pins, 6 & 16 Amps multipurpose complete all as specified and as directed. | 700 | Each | - | - |
| 7 | Supply only in replacement bell push switch piano, flush type, 5 Amps complete all as specified and as directed. | 200 | Each | - | - |
| 8 | Supply only in replacement batten type angular/ Batten lamp holder insulated body with back plate suitable for batten fitting including PVC round block complete all as specifed and as directed. | 400 | Each | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
24TenderDocuments.pdf
Tender Documents • 0.98 MB
BOQ_855345.xls
BOQ • 0.81 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .