Tender Value
Refer Docs
EMD Value
₹14,190
Closing Date
11 Jun 2024, 11:00 amClosed
Superintending Engineer
office of the S.E., EUDC-II, Sec-18, Noida.
Construction of New 33KV Double Circuit line for energisation of 33KV Metering System at Jewar Airport for ESS Sub-Station
2024_PVVNL_925846_1
E-Tender No. 04/2024-25, EUDC-II, Noida
Open Tender
Electrical Works
Item Rate
90 days
office of the S.E., EUDC-II, Sec-18, Noida.
Attached in DOC
2 documents required · 2 mandatory
₹3,540
S.E. EUDC-II, Noida.
₹14,190
19 Jun 2024
31 May 2024
11 Jun 2024
31 May 2024
11 Jun 2024
31 May 2024
Amount
Construction of New 33KV Double Circuit line for energisation of 33KV Metering System at Jewar Airport for ESS Sub-Station
Safe Cartage of following centralised stock material from any of the Store Center of PVVNL to work site including Loading from Store and safe unloading at site for Item No. 3 to 14
33KV 3x300sqmm XLPE Cable
Heat Shrinkable Indoor and outdoor type end termination cable jointing kit suitable for 33KV XLPE 3x300 Sq.mm. cable (Make - Raychem/3M/Denson)
ACSR Dog Conductor for Jumpering
ST 11Mtr Pole
Stay Set Complete
Barbed Wire
Stone Pad 300x300x75mm
MS Top Channel 125x65x3200mm
MS Dropper Channel 100x50x2600mm
33KV Pin Insulator with Pin and Nut.
Earthing Complete
33KV Metering System (33KV Pilfer Proof Metering Cubicle, 33KV CT/PT Metering Pole Mounted Unit etc.)
Errection of above Centralised material and Supply and errection of the below De-Centralised material for completing the works as per RESPO.
The excavation of foundation pit in mix soil/normal soil/soft soil & hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750x450)mm and having depth of 1/6th of the full length of the support. Erection of support, complete with providing & fixing of all G.I.Clamps size of 75x10mm, 65x8mm, G.I.Nut bolt & washer, P.G.Clamp, Stone Pad, Al. Binding wire, 'E' bracket 75x10mm, and other accessories as per drawing. The work includes carriage and handling of supports from sectional store to pit site as well as any fabrication work if required & fixing of cross bracing sets 4.3mtr long, from G.I.Angle 65x65x6mm. The work includes cutting holes and providing G.I.Bolt of 16x40mm size, in the middle of the cross bracing with 01No. spring washer of proper size as per drawing/ as per schedule. Double Pole Structures (a) ST/PCC - 11Mtr Long Pole and PCC - 8.5 Mtr. Long Pole
The excavation of foundation pit in mix soil/normal soil/soft soil & hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750x450)mm and having depth of 1/6th of the full length of the support. Erection of support, complete with providing & fixing of all G.I.Clamps size of 75x10mm, 'F' bracket 75x10mm, G.I.Nut bolt & washer, Stone Pad Al. Binding wire and other accessories as per drawing. The work includes carriage and handling of supports from sectional store to pit site as well as an fabrication work if required. Single Pole (a) ST/PCC - 11Mtr Long Pole and PCC - 8.5 Mtr. Long Pole
Grouting of supports in CC 1:3:6 (Cement, sand & 20mm stone grift). Grouting will be done in the block of size (450x450)mm x1/6th of full length of the support, upto ground level, 300mm plinth above the ground level with C.C. 1:3:6 (Cement, Course sand and Stone grift) with muffing as per RESPO. Work includes back filling and proper ramming. Single Pole and Double Pole (a) ST/PCC - 11Mtr Long Pole and PCC - 8.5 Mtr. Long Pole
FIXING OF PIN INSULATOR WITH PIN, COMPLETE WORK IN ALL RESPECT.
FIXING OF MS TOP CHANNEL AS PER SITE REQUIREMENT WITH COMPLETE WORK IN ALL RESPECT.
FIXING OF MS DROPPER CHANNEL AS PER SITE REQUIREMENT WITH COMPLETE WORK IN ALL RESPECT.
FIXING OF STONE PAD AS PER SITE REQUIREMENT WITH COMPLETE WORK IN ALL RESPECT.
FIXING AND MAKING OF JUMPERS BY ACSR DOG CONDUCTOR AS PER SITE REQUIREMENT WITH COMPLETE CONNECTION AND WORK IN ALL RESPECT.
Laying and commissiong of 33KV 3x300sqmm XLPE Cable in Double Ckt. after digging trench of dia 220 mm in two parallel bores for Double Curcuit by manual method at a depth of 1.50 mtrs to 2.50 mtrs. (as requirement at site) below the ground level for laying cable and refilling of trench including connections at both ends after providing and crimping of lugs of proper size for completion of work and Providing & Laying of Ist Class Bricks, along the length on both side of 33KV 3x300 XLPE Cable in Cable Trench (minium 18No. Bricks/Mtr per Cable) and Stone Slab of size 450x600x50mm on top of the each Cable, Providing 150 thickness mm River sand for cushion beneath and 150mm above the cable and Back filling of excavated earth in the cable trench upto the ground level and ramming properly.
Preparation, fixing and Commissioning of 33 KV Power Cable ends: Making of 33 KV XLPE Heat shrinkable Indoor and outdoor jointing kits suitable for 3x300sqmm XLPE Cable after duly plumbing and taping of cable, providing, fixing and crimping of proper size good quality lugs with complete connention in all respect.
Fixing and Driving of MS earth rod of size 20x2500 mm in earth and jointing through G.I. wire of 6 SWG between support and earth electrode by providing proper size of bolts and nuts for pole earthing. Supply Erection, fixing, grouting of stay rod in cement, sand and brick ballast in ration 1:4:8 in Block 600*600*300 mm with binding & nuzzling including providing & fixing of stay insulator complete in all respect with grouting.
Fixing, tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing, including providing & fixing of Stay Insulators and Stay Clamps and Grouting of stay rods (20x1800)mm including all work of excavation, cement concrete in size (0.60x0.60x0.30)m in ratio 1:3:6 cement, sand, 20mm Stone grift) as per drg. Including back filling of soil and proper ramming etc.
PROVIDING AND FIXING OF G.I. PIPE 6" Dia for the Pole risers as per site requirement with complete work in all respect.
PROVIDING AND FIXING OF CLAMS WITH NUT & BOLT s per site requirement with complete work in all respect.
PROVIDING AND FIXING OF G.I. Strip Earthing for Metering System with complete work in all respect.
PROVIDING AND FIXING OF G.I. Pipe Sporting Angle as per site requirement with complete work in all respect.
PROVIDING AND FIXING OF Danger Board with Clamp and Nut & Bolts s per site requirement with complete work in all respect.
Laying and Fixing of Barbed Wire on the 04 Nos. Pole for Safety Purpose as per site requirement with complete work in all respect.
Installation and Commissioning of 33KV Metering System (33KV Pilfer Proof metering cubicle, 33KV CT/PT Metering Pole Mounted Unit and any other releated items) at Site as per site requirement with complete work in all respect.
Construction of New 33KV Double Circuit line for energisation of 33KV Metering System at Jewar Airport for MRSS Sub-Station
Safe Cartage of following centralised stock material from any of the Store Center of PVVNL to work site including Loading from Store and safe unloading at site for Item No. 37 to 48
33KV 3x300sqmm XLPE Cable
Heat Shrinkable Indoor and outdoor type end termination cable jointing kit suitable for 33KV XLPE 3x300 Sq.mm. cable (Make - Raychem/3M/Denson)
ACSR Dog Conductor for Jumpering
ST 11Mtr Pole
Stay Set Complete
Barbed Wire
Stone Pad 300x300x75mm
MS Top Channel 125x65x3200mm
MS Dropper Channel 100x50x2600mm
33KV Pin Insulator with Pin and Nut.
Earthing Complete
33KV Metering System (33KV Pilfer Proof Metering Cubicle, 33KV CT/PT Metering Pole Mounted Unit etc.)
Errection of above Centralised material and Supply and errection of the below De-Centralised material for completing the works as per RESPO.
The excavation of foundation pit in mix soil/normal soil/soft soil & hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750x450)mm and having depth of 1/6th of the full length of the support. Erection of support, complete with providing & fixing of all G.I.Clamps size of 75x10mm, 65x8mm, G.I.Nut bolt & washer, P.G.Clamp, Stone Pad, Al. Binding wire, 'E' bracket 75x10mm, and other accessories as per drawing. The work includes carriage and handling of supports from sectional store to pit site as well as any fabrication work if required & fixing of cross bracing sets 4.3mtr long, from G.I.Angle 65x65x6mm. The work includes cutting holes and providing G.I.Bolt of 16x40mm size, in the middle of the cross bracing with 01No. spring washer of proper size as per drawing/ as per schedule. Double Pole Structures (a) ST/PCC - 11Mtr Long Pole and PCC - 8.5 Mtr. Long Pole
The excavation of foundation pit in mix soil/normal soil/soft soil & hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750x450)mm and having depth of 1/6th of the full length of the support. Erection of support, complete with providing & fixing of all G.I.Clamps size of 75x10mm, 'F' bracket 75x10mm, G.I.Nut bolt & washer, Stone Pad Al. Binding wire and other accessories as per drawing. The work includes carriage and handling of supports from sectional store to pit site as well as an fabrication work if required. Single Pole (a) ST/PCC - 11Mtr Long Pole and PCC - 8.5 Mtr. Long Pole
Grouting of supports in CC 1:3:6 (Cement, sand & 20mm stone grift). Grouting will be done in the block of size (450x450)mm x1/6th of full length of the support, upto ground level, 300mm plinth above the ground level with C.C. 1:3:6 (Cement, Course sand and Stone grift) with muffing as per RESPO. Work includes back filling and proper ramming. Single Pole and Double Pole (a) ST/PCC - 11Mtr Long Pole and PCC - 8.5 Mtr. Long Pole
FIXING OF PIN INSULATOR WITH PIN, COMPLETE WORK IN ALL RESPECT.
FIXING OF MS TOP CHANNEL AS PER SITE REQUIREMENT WITH COMPLETE WORK IN ALL RESPECT.
FIXING OF MS DROPPER CHANNEL AS PER SITE REQUIREMENT WITH COMPLETE WORK IN ALL RESPECT.
FIXING OF STONE PAD AS PER SITE REQUIREMENT WITH COMPLETE WORK IN ALL RESPECT.
FIXING AND MAKING OF JUMPERS BY ACSR DOG CONDUCTOR AS PER SITE REQUIREMENT WITH COMPLETE CONNECTION AND WORK IN ALL RESPECT.
Laying and commissiong of 33KV 3x300sqmm XLPE Cable in Double Ckt. after digging trench of dia 220 mm in two parallel bores for Double Curcuit by manual method at a depth of 1.50 mtrs to 2.50 mtrs. (as requirement at site) below the ground level for laying cable and refilling of trench including connections at both ends after providing and crimping of lugs of proper size for completion of work and Providing & Laying of Ist Class Bricks, along the length on both side of 33KV 3x300 XLPE Cable in Cable Trench (minium 18No. Bricks/Mtr per Cable) and Stone Slab of size 450x600x50mm on top of the each Cable, Providing 150 thickness mm River sand for cushion beneath and 150mm above the cable and Back filling of excavated earth in the cable trench upto the ground level and ramming properly.
Preparation, fixing and Commissioning of 33 KV Power Cable ends: Making of 33 KV XLPE Heat shrinkable Indoor and outdoor jointing kits suitable for 3x300sqmm XLPE Cable after duly plumbing and taping of cable, providing, fixing and crimping of proper size good quality lugs with complete connention in all respect.
Fixing and Driving of MS earth rod of size 20x2500 mm in earth and jointing through G.I. wire of 6 SWG between support and earth electrode by providing proper size of bolts and nuts for pole earthing. Supply Erection, fixing, grouting of stay rod in cement, sand and brick ballast in ration 1:4:8 in Block 600*600*300 mm with binding & nuzzling including providing & fixing of stay insulator complete in all respect with grouting.
Fixing, tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing, including providing & fixing of Stay Insulators and Stay Clamps and Grouting of stay rods (20x1800)mm including all work of excavation, cement concrete in size (0.60x0.60x0.30)m in ratio 1:3:6 cement, sand, 20mm Stone grift) as per drg. Including back filling of soil and proper ramming etc.
PROVIDING AND FIXING OF G.I. PIPE 6" Dia for the Pole risers as per site requirement with complete work in all respect.
PROVIDING AND FIXING OF CLAMS WITH NUT & BOLT s per site requirement with complete work in all respect.
PROVIDING AND FIXING OF G.I. Strip Earthing for Metering System with complete work in all respect.
PROVIDING AND FIXING OF G.I. Pipe Sporting Angle as per site requirement with complete work in all respect.
PROVIDING AND FIXING OF Danger Board with Clamp and Nut & Bolts s per site requirement with complete work in all respect.
Laying and Fixing of Barbed Wire on the 04 Nos. Pole for Safety Purpose as per site requirement with complete work in all respect.
Installation and Commissioning of 33KV Metering System (33KV Pilfer Proof metering cubicle, 33KV CT/PT Metering Pole Mounted Unit and any other releated items) at Site as per site requirement with complete work in all respect.
M/S D R D ENTERPRISES
Kunal Electricals
M/s Ashu Brothers
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .