| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAccepted-Finance | L1 | Accepted-Finance Admitted | |
| 2 | L2₹8.9 L+₹9,876.53 (1.12%)Accepted-Finance | L2 | Accepted-Finance Admitted |
Tender Value
₹8.9 L
EMD Value
₹9,000
Closing Date
18 Aug 2022, 3:00 pmClosed
Project Director
DRDA Krishnagiri
Krishnagiri DT AGAMT II 2021-22 Kaveripattinam Block- Construction of Cremation Shed and Compound wall at Mollampatti Burial ground H/o Dhamotharahalli TN-04-KRI-348
2022_RDTN_245279_1
RocNo_42_2022_R10_22_07_2022
Open Tender
Civil Works - Buildings
Item Rate
180 days
Krishnagiri
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹9,000
DRDA Krishnagiri
7 Sept 2022
2 Aug 2022
18 Aug 2022
2 Aug 2022
18 Aug 2022
2 Aug 2022
3 Aug 2022
Amount
Construction of Cremation Shed and Compound wall at Mollampatti Burial ground H/o Dhamotharahalli (85m)
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement concrete 1:4:8 (one cement, four sand, and Eight hard broken stone) Using 40mmHBG metal size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Random Rubble Masonry in cement Mortar 1 : 5 for foundation and basement using New Stones including necessary provision for Bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications.
Refilling the foundation and basement with excavated eartth in layer of not more than 15cm thick
Supplying and Filling in foundation and basement wirth filling M-Sand including water consolidating etc.,
Dry Brick work using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and
Plastering with Cement Mortar 1:3 10mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Plastering with Cement Mortar 1:4 20mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Finishing the top of roof with one course of machine pressed tiles of size 20 x 20 x 2 cm of approved quality laid in CM 1:3 12mm thick. With water proofing compound confirming to IS by 2% by weight of cement used & the joint pointed neatly to full depth
Whitewashing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Provision for Name Board
Provision for Compound wall
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement concrete 1:4:8 (one cement, four sand, and Eight hard broken stone) Using 40mm ISS metal size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete
Random Rubble Masonry in cement Mortar 1 : 5 for foundation and basement using New Stones including necessary provision for Bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications.
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Sivan Constructions
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .