Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 LAccepted-AOC HN 422 32 NEW TULSI NAGAR NEAR RAM NAGAR STATE BANK ETAWAH 206001 UTTAR PRADESH | ETAWAH | UTTAR PRADESH | 206001 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹6.5 L+₹42,900 (7.05%)Rejected-AOC MOHALLA MISHRANA PIHANI HARDOI | PIHANI | HARDOI | UTTAR PRADESH | L2 | Rejected-AOC Rejected | |
| 3 | L3₹6.5 L+₹46,450 (7.63%)Rejected-AOC | L3 | Rejected-AOC Rejected | |
| 4 | L4₹6.6 L+₹49,340 (8.11%)Rejected-AOC | L4 | Rejected-AOC Rejected | |
| 5 | L5₹7.8 L+₹1.7 L (28.6%)Rejected-AOC 01 KATYANI CONSTRUCTION COMPANY H NO 1 SHOP NO 1 RATAN LAL NAGAR KANPUR NAGAR UTTAR PRADESH 208022 | KANPUR NAGAR | UTTAR PRADESH | 208022 | L5 | Rejected-AOC Rejected |
Tender Value
₹9.4 L
EMD Value
₹18,760
Closing Date
12 Nov 2021, 12:00 pmClosed
Superintending Engineer
Electricity Transmission Circle-II Panki Kanpur.
Erection of New 40MVA 132/33KV T/F Bay Bus Coupler Bay and Shifting of Line Bay at 132KV S/S Dibiyapur(Auraiya) under ETD Etawah
2021_UPTCL_610803_1
E-Tender No.28/ETC-II(K)/2021-22
Open Tender
Electrical Works
Fixed-rate
60 days
Etawah
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
Executive Engineer ETD-II Kanpur
₹18,760
31 Oct 2022
13 Aug 2021
12 Nov 2021
13 Aug 2021
12 Nov 2021
13 Aug 2021
Amount
Erection of main & auxiliary structures consisting of columns, beams, peaks mast etc. Auxiliary structure required for installation of isolators CTs , PTs, LAs and all other equipments. The job consists of shifting all material i.e. structure parts, nuts & bolts, washers etc from site store to erection site. erection of structure as per relevant drawing and practices a using flat and spring washers with each bolt. Matching of holes, cutting, matching of members if required shall also be done by the contractor without any extra cost to complete the work satisfactory,all material to be erected shall be supplied by UPPTCL free of cost but all men and T&P required for satisfatorily completion of work shall be arrange by the contractor at his own cost .
Dismentalling of following equipments after opening of jumpers and earthing as per instruction manual of various equipments & technical specification including shifting of material/equipments from old Bay to new bay including all other associated work to complete the job satisfactorily
Erection of following equipments as per instruction manual of various equipments & technical specification including shifting of material/equipments from site store to erection site including all other associated work to complete the job satisfactorily
33kv Circuit Breaker
132kv C.T. Junction box
132kv P.T. Junction box
33kv C.T. Junction box
132kv T/F Control & relay panel
132kv DPP Control & relay panel
132kv Bus Coupler Control & relay panel
132kv Soild Core Post Insulator
Stringing of 3phase jack bus bar of 132kv with Panther conductor of following length mention below including tension fitting clamp, hoisting of insulators, cutting of conductor and also shifting of all material from store to site & all other associated work to complete the work satisfactorily as per technical specification.
Shifting of 132 KV Panki-Dibiyapur Line to new Bay
Destringing of 3Nos Conductor from Dead End Tower to S/S Gantry Span Approx. 66 mtr
Stringing of 3 Nos Conductor From Dead End Tower to New S/S Gantry
Stringing of 3phase Main bus bar of 132kv with Zebra conductor of following length mention below including tension fitting clamp, hoisting of insulators, cutting of conductor and also shifting of all material from store to site & all other associated work to complete the work satisfactorily as per technical specification.
Stringing of 3phase Main bus bar of 33kv with Moose conductor of following length mention below including tension fitting clamp, hoisting of insulators, cutting of conductor and also shifting of all material from store to site & all other associated work to complete the work satisfactorily as per technical specification.
Stringing of 3phase Transfer bus bar of 33kv with Panther conductor of following length mention below including tension fitting clamp, hoisting of insulators, cutting of conductor and also shifting of all material from store to site & all other associated work to complete the work satisfactorily as per technical specification.
Complete fabrication of jumper, interconnection & jumpering work of 132kv & 33kv bay of new transformer, 132kv bus coupler bay, Bidhuna bay, 40MVA T/F-I&II bay, 132kv Panki bay etc. with Moose/Zebra/Panther conductor with the help of clamps including measuring, cutting, straightening & bending work including all associated work to complete the job satisfactorily
Cutting, straightening, bending, laying 600mm below inside ground and above ground as per acctual requirement of following size M.S. Flat for earthing of 40MVA transformer, main & auxiliary structures and equipments including welding, with main earthmate & with object to be earthed. excavation of trenches and its back filling , painting with black bituminous paint at all under ground joints and painting of earthing m.s. flat by applying two coat of bus green enamel paint after one coat of red oxide and all other works to complete the job satisfactory .
M.S. Flat 75x10mm
M.S.Flat 50x6mm
M.S.Flat 25x6mm
Complete earthing with grid making with the help of 06 Nos 3mtr. long electrode of M.S. Rod, 40mm and M.S. flat size 75x10mm for 120KV LA (as per drawing & technical specification)
Complete earthing with grid making with the help of 04 Nos 3mtr. long electrode of M.S. Rod, 40mm and M.S. flat size 75x10mm for 30KV LA (as per drawing & technical specification)
Laying of following size control cable in the cable trench from various equipment to control/relay panel and junction boxes etc with proper dressing and saddling of cable at every 75mm distance
Termination of cable in various equipments (132kv CB & CT, 33kv CB & CT), transformer control and relay panel etc. making the hole of proper size fixing of glands and providing ferrule and wiring as per drawing, dressing as per requirement .(glands will be provided by the department free of cost and ferrule will be provided by the contactor at his own cost. )
2x2.5 mm2/4x2.5 mm2/6x2.5 mm2
Termination of cable in various equipments of bus coupler bay, 40MVA T/F-I&II bay, 132kv Panki & Bidhuna line bay (132kv CB & CT, PT, Isolator) . Bus Coupler Panel, 132kv double feeder control panel & DPP Panel making the hole of proper size fixing of glands and providing ferrule and wiring as per drawing, dressing as per requiment.(glandes will be provided by the department free of cost and ferrule will be provided by the contactor at his own cost).
2x2.5 mm2/4x2.5 mm2/6x2.5 mm2
AWASTHI ENTERPRISES
BARKATI ENTERPRISES
M/S DHIRENDRA SINGH
Katyani Construction Co.
TAJ ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .