Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹25.2 LAdmitted-Finance | -0.18% | ₹25.2 L | L1 | Admitted-Finance |
| 2 | L2₹25.2 LAdmitted-Finance GRAM NANEHA ASHA TEHSIL DEVBAND DISTRICT SAHARANPUR MOBILE 9927733433 | -0.07% | ₹25.2 L | L2 | Admitted-Finance |
| 3 | L3₹25.2 LAdmitted-Finance | -0.05% | ₹25.2 L | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹2.5 L
Closing Date
10 Jun 2026, 10:00 amClosed
PO DUDA BIJNOR
O/O PO DUDA BIJNOR
NEHRU STAIDUM STHIT TARAN TALL KE DONO AUR SWIMING POOL KE PAS UPER SAID V LOHE KI JALI LAGANE KA WORK
2026_TACPD_1156542_2
107
Open Tender
Civil Works
Percentage
180 days
BIJNOR
PLEASE REFER TENDER DOCUMENT
2 documents required · 2 mandatory
₹854
PO DUDA BIJNOR
₹2.5 L
11 Jun 2026
3 Jun 2026
10 Jun 2026
3 Jun 2026
10 Jun 2026
3 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in soil mixed with mooram/shingle kankar including supply of all material,labour and T&P etc.required for proper completion of work Chapter 4 S.I. NO 253 B | 10.13 | M3 | 200 | ₹2,026 |
| 2 | Concrete with 4cm gauge approved Stone ballast, coarse sand and cement in proportion of 8:4:1 including supply of all materials labour and completion of the work .S I no 281 | 1.07 | M3 | 6,850 | ₹7,329.5 |
| 3 | R.C.C. work with cement C-sand and stone grit in 1:1.5:3 in lintels etc excluding s/o rainforcement and its binding but including fixing binding centering and shuttering including supply of all materials labourand T&P etc required for proper completion of the work as per S.I.No.-288 | 5.47 | M3 | 8,025 | ₹43,896.75 |
| 4 | M.S. or Iron work in plain work such as R.C.C. or R.B. work including bending for proper completion of work and including supply of steel as per complete S.I.no.504 | 4.3 | Qtl | 7,050 | ₹30,315 |
| 5 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. as per DSR 2023 10.16.1 | 12,414.84 | kg | 142.88 | ₹17,73,832.34 |
| 6 | Providing P.V.C sheet roofing i/c including supply of all material,labour and T&P etc complete as per M.R. | 1,205 | M2 | 450 | ₹5,42,250 |
| 7 | M.S. or Iron work in plain work such as Jal including bending for proper completion of work and including supply of steel as per complete S.I.no.504 | 15.75 | Qtl | 7,050 | ₹1,11,037.5 |
| 8 | App primer coat on new Steel Surface including supply of all materials labour and completion of the work .S I noCh 15 New Item No 1a | 90 | Qtl | 23 | ₹2,070 |
| 9 | Applying two coat enaimel paint over priming coat on wood or steel and other metal surface including supply of all material,labour and T&P etc required for proper completion of work S.0.R/ CH 15 S.I. 1(A)+2+3(III) | 90 | M2 | 54 | ₹4,860 |
| 10 | S/F Sine Board at site including material labour and T&P etc.as per direction of Engineer incharge. etc complete. | 1 | Nos | 3,150 | ₹3,150 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_2167104.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].