Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹40.2 LAccepted-AOC PLOT NO 41 SECTOR D BAGRODA INDUSTRIAL AREA BHOPAL MP 462026 | BHOPAL | MADHYA PRADESH | 462026 | L-1 | Accepted-AOC Being L-1 | |
| 2 | L-2₹45.4 L+₹5.1 L (12.8%)Rejected-AOC SP 52 MPPGCL COLONY BIRSINGHPUR DISTT UMARIA 484 552 M P | BIRSINGHPUR | UMARIA | MADHYA PRADESH | 484552 | L-2 | Rejected-AOC Being L-2 | |
| 3 | Rejected-Technical MATHARDEV WARD PATHAKHEDHA SARNI BETUL MP 460001 | BETUL | MADHYA PRADESH | 460001 | - | Rejected-Technical Desired shortfall documents not submitted |
Tender Value
₹37.8 L
EMD Value
₹94,600
Closing Date
8 Nov 2021, 3:00 pmClosed
CE Gen
STPS Sarni
Breakdown Maintenance Of Boiler Pressure Part Of 250 MW capacity Unit No. 10 and 11 of PH-IV, STPS, Sarn.
2021_MPPGC_158912_1
WT-3566
Open Tender
Miscellaneous Works
Item Rate
365 days
work
As per NIT
5 documents required · 5 mandatory
₹1,000
Yes
₹94,600
Yes
11 Mar 2022
30 Sept 2021
11 Nov 2021
30 Sept 2021
8 Nov 2021
30 Sept 2021
Preparation of scaffolding above Economiser Hopper for inspection & attending of Economiser Lower Bank Coil
Cleaning of Ash in Dead Chamber, Penthouse, Cat House
Inspection and repairs of doors/windows & peep holes of Boiler
CLEANING & REPAIRING OF WINDBOX
Repair of Windbox by patching
Dismantling of Steel Structures/Installation of new steel plate
Rectification, Replacement & Refixing of protection sleeve (shielding) in various areas of Boiler tubes
WELDING OF HP JOINTS OF BOILER TUBES
Waterwall tubes, Screen tubes, Hanger tubes, Rear Arch tubes etc.
Platen super heater/ Roof Tubes/ Spacer Tubes/FSH
Reheater
Economiser tubes
LTSH and associated steam cooled wall
Alignment of tubes of Platen Superheater/Reheater
Alignment of Economiser tubes/LTSH coils
Peparation of HP tube bends
Welding of Fins of HP tubes of W/W & SCW
Pad Welding (Metal Buit up) of Thinned tubes
REMOVING & REAPPLICATION OF REFRACTORY AT VARIOUS LOCATION OF BOILER
Re- enforcement of Welding Joints
Replacement of Valves (Size-10mm to 350 mm)
Complete Servicing /Gland packing of HP Valves (Size- 25NB to 350NB)
Complete Servicing of Spring Loaded Safety Valves/ERV
Boiler Drum
Main Steam line/ CRH LINE/HRH LINE/SOOT BLOWER LINE Safety Valve
Servicing of Main Steam Stop Valve
REPAIR OF PENT HOUSE
Repair of Pent House by patching
Dismantling of Steel Structures/Installation of new steel plate
REPAIR OF DEAD CHAMBER
Repair of Dead Chember by patching
Dismanteling of Steel Structures/Installation of new steel plate
Preparation of Scaffolding in Bottom Ash Hopper Area
Preparation of Scaffolding in Boiler Horizontal Pass ( Including Goosneck Part, Screen Tubes , REHEATER, FSH, PSH etc.)
DP Test
Repair/Refixing/fixing of SS Wire Mesh inside Bottom Ash Hopper
INSULATION & GI SHEETING
ONLY GI SHEETING ON INSULATION
Fabrication & Erection Work of Platform & Approach ( As & where required in Boiler)
Fixed station Stay charges (per month)
K K POWER CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .