Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.1 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹7.7 L+₹1.6 L (25.7%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹7.8 L+₹1.7 L (28.4%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹8.1 L+₹2.0 L (33.3%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹9.7 L
EMD Value
₹19,440
Closing Date
11 Sept 2026, 6:00 pmClosed
Executive Engineer REW Jammu
Executive Engineer REW Jammu
Plastering, Flooring, Woodwork and Other allied Works of Community Hall Near Sita Ram Mandir Nikowal pyt Nikowal Block Suchetgarh under District Capex Budget PRI Component for the year 2026-27
2026_RDPR_322757_8
e_NIT No. 507 -REWJ of 2026-27 dated 29-08-2026
Open Tender
Civil Works
Percentage
45 days
Executive engineer REW Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹19,440
24 Sept 2026
29 Aug 2026
12 Sept 2026
29 Aug 2026
11 Sept 2026
29 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 23.44 | cum | 7,571.55 | ₹1,77,477.13 |
| 2 | Extra for brick work in superstructure above plinth level upto floor V level. (By manual means) | 23.44 | cum | 1,455.65 | ₹34,120.44 |
| 3 | 12 mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) | 237.57 | sqm | 266.2 | ₹63,241.13 |
| 4 | 6MM CEMENT PLASTER
6 mm cement plaster to ceiling of mix 1 : 3 (1 cement : 3 fine sand) | 63.46 | sqm | 241.25 | ₹15,309.73 |
| 5 | Painting with synthetic enamel paint of approved brand and manufacture
to give an even shade.Two or more coats on new work and Applying priming coat:With ready mixed pink or grey primer of approved brand
and manufacture on wood work. | 51.19 | sqm | 196.25 | ₹10,046.04 |
| 6 | MARBLE STONE FLOORING
Flooring with marble stone of specified thickness as per sample of
marble approved by Engineer-in-charge, over 20 mm (average) thick
base of cement mortar 1:4 (1 cement:4 coarse sand) laid and jointed with
grey cement slurry including rubbing, polishing and curing complete
with: Makrana white. 18 mm thick | 117.75 | sqm | 3,300.65 | ₹3,88,651.54 |
| 7 | Distempering with 1st quality acrylic distemper (ready mixed)having
VOC content less than 50 gms/litre,two or more coats on new work of
approved manufacturer, of required shade and colour complete as per
manufacturer’s specifications | 657.74 | sqm | 89.9 | ₹59,130.83 |
| 8 | EXTERIOR FINISHING
Finishing walls with water proofing cement paint of required shade on
New work (two or more coats applied @ 3.84 kg/10sqm) | 97.3 | sqm | 98.75 | ₹9,608.38 |
| 9 | CIB (citizen information Board ) | 1 | Nos | 3,500 | ₹3,500 |
| 10 | Providing and fixing pressed steel door frames conforming to IS: 4351, manufactured from commercial mild steel of 1.25mm/1.60mm thickness including hinges jamb, lock, jamb, bead , including M.S pressed butt hinges 2.5mm thick with mortar guards, lock strike-plate and shock absorbers as specified and applying a coat of approved steel primer after pre-treatment of the surface as directed by Engineer-in-charge Profile B Fixing with adjustable lugs with split end tail to each jamb | 104.27 | m | 460.6 | ₹48,026.76 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.46 MB
BOQ_1084082.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .