| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 LAccepted-Finance | L1 | Accepted-Finance Lowest quoted | |
| 2 | L2₹5.7 L+₹5,199.01 (0.93%)Rejected-Finance | L2 | Rejected-Finance Highest quoted |
| Sl No | Description | Qty | Unit | T Vaithy L1 | Sri Vaideeswara & Co L2 |
|---|---|---|---|---|---|
| 1.00Earth work excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales murams and ordinary gravel and hard dravel including shoring, strutting, baling or pumping out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick and depositing the surplus earth at places as directed by the departmental officers with initial lead and lift | |||||
| 1.10 | a). Narrow Foundation | 19 | m3 | 216 ₹4,104 Lowest | 218 ₹4,142 |
| 1.20 | b). Open Excavation | 7 | m3 | 108 ₹756 Lowest | 109 ₹763 |
| 1.30 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 2 | m3 | 1,556 ₹3,112 Lowest | 1,571 ₹3,142 |
| 1.40 | Plain cement concrete 1:4:8 mix (One cement four sand and eight aggregate) using 40mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete | 3 | m3 | 5,174 ₹15,522 Lowest | 5,226 ₹15,678 |
| 1.50Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using M.S Sheets of size 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over (silver oak joists) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete | |||||
| 1.60 | a). Square Columns | 29.76 | m2 | 1,148 ₹34,164.48 Lowest | 1,159 ₹34,491.84 |
| 1.70 | b). Grade Beam | 19 | m2 | 522 ₹9,918 Lowest | 528 ₹10,032 |
| 1.80 | Plain Cement Concrete 1:1.5:3 (One part of Cement, one and half part of Crushed Sand (M- Sand), three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 2 | m3 | 7,122 ₹14,244 Lowest | 7,193 ₹14,386 |
| 1.90 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 605 | Kg | 91.5 ₹55,357.5 Lowest | 92 ₹55,660 |
Tender Value
₹6.8 L
EMD Value
₹6,800
Closing Date
14 Feb 2025, 3:00 pmClosed
THE COMMISSIONER
Salem City Municipal Corporation, Fort Main Road, Salem.
Construction of Compound Wall, Repairs and Maintanance to the ICDS Building, Ward Office, Collection Centre and Unani Hospital at Car Street Corporation School in Division No 32 of Ammapet Ward Office.
2025_MAWS_523827_1
E6-Est No 435-B-2024-2025
Open Tender
Civil Works
Lump-sum
30 days
Salem city Municipal Corporation
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹6,800
29 Aug 2025
8 Feb 2025
14 Feb 2025
8 Feb 2025
14 Feb 2025
8 Feb 2025
Amount
Earth work excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales murams and ordinary gravel and hard dravel including shoring, strutting, baling or pumping out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick and depositing the surplus earth at places as directed by the departmental officers with initial lead and lift
a). Narrow Foundation
b). Open Excavation
Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification.
Plain cement concrete 1:4:8 mix (One cement four sand and eight aggregate) using 40mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete
Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using M.S Sheets of size 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over (silver oak joists) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete
a). Square Columns
b). Grade Beam
Plain Cement Concrete 1:1.5:3 (One part of Cement, one and half part of Crushed Sand (M- Sand), three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors.
Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers -
a). Foundation & Basement
Brick work in cement mortar 1:5 mix using Fly Ash bricks of 230x110x70mm (8 3/4" x 41/4" x 23/4") from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications
a). Foundation & Basement
b) Ground Floor
Plastering with cement mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 10mm thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications
Plastering with cement mortar 1:5 mix, 12mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete . complying with std. specifications
Supply and fixing of M.S Grills with Doors and Windows with one coat of Red oxide with Primer including all costs such as welding,grinding and fabrication charges, cost and conveyance of all materials to site etc,complete as per standard specification.
Painting two coats with ready mixed Plastic Emulsion Paint approved quality and colour over a priming coat, including thorough scrapping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required etc, complete as per standard specification. - 10 sq.m
Painting two coats with Ready Mixed Enamel Paint over the new iron works of approved quality and colour without priming coat including the cost all materials etc.,complete, in all floors.
Painting two coats with best synthetic enamel paint of approved Colour for old wood work the rate is inclusive of all materials, brushes and scaffolding charges etc., complete complying with standard specification(paint should be got approved by the Departmental Engineer befor use on work.
Dismantling the Brick work in cm clearing away from the site etc, complete.
Clean removal of cement plaster from walls, clearing from site etc, complete.
Providing two legged scaffolding using 15cm diameter blue-gum props or casurina props or best quality bamboo props of 4m overall length (3m height + 0.50m into the ground + 0.50m projection) the distance between the two rows being 2m in both the rows with two horizontal props with 0.50m overlap on either side and braces at 2m c/c including longitudinal and transverse middle braces to step up and providing a platform with country wood planks of 40mm thick and 1m width etc complete from using coir and nails etc complete.
Rate upto 3m height
Wiring with 2 x 1.5 sqmm (22 /0.3 ) PVCinsulated single core unsheathed copper conductor cable of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 3mm thick hylum sheet cover with TW switch box and 5A F.T. switchm with continuous earth wire connection of 14 SWGTC wire for making good of the concealed portion with suitable colour for PVC concealed light point / Fan point (For Electronic regulator). etc, complete as per standard specifications.SD23
Wiring with 2 x 1.5 sqmm (22 /0.3 ) PVCinsulated single core unsheathed copper conductor cable of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVCaccessories inflush with wall with 150 x 100 x 113 mm TW switch box with 3mm hylum sheet cover for SA 3 pin non inter locking CS plug with continuous earth wire connection of 14 SWGTC wire and making good of the concealed portion with suitable colour for concealed PVC plug point.etc, complete as per standard specifications SD38
Supply and run of 2 of 1.5 sqmm (22/0.3) PVCinsulated SC unsheathed Cu.Conductor of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with continuous earth wire connection of 14 SWGTC wire and making good of the concealed portion with suitable colour.etc, complete as per standard specifications SD54
Supply and fixing of single box type 4'36 W flu fitting complete with copper choke and condensor with TW round blocks on wall or ceiling with flu tube with PVC unsheathed Copper leads from terminals to the fitting etc, complete as per standard specifications SD87
Supplying and fixing of 1200mm ( 48" ) sweep AC ceiling fan complete with regulator with 1Mdown rod including S & F of fan clamp with side plates and cross arm etc, complete as per standard specifications SD 107
Sri Vaideeswara & Co (BID ID -1250454)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .