Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹71.5 LAccepted-AOC CAMP VILLAGE DEVGAI POST KUDRI SHADOL MP PIN 484110 | SHAHDOL | MADHYA PRADESH | 484110 | ₹71.5 L | L-1 | Accepted-AOC Accepted as L-1 |
| 2 | L-2₹86.5 L+₹15.0 L (21.0%)Rejected-Finance | ₹86.5 L+₹15.0 L (21.0%) | L-2 | Rejected-Finance Rejected as L-2 |
| 3 | L-3₹1.1 Cr+₹36.4 L (50.9%)Rejected-Finance | ₹1.1 Cr+₹36.4 L (50.9%) | L-3 | Rejected-Finance Rejected as L-3 |
| 4 | L-4₹1.1 Cr+₹37.0 L (51.7%)Rejected-Finance WARD NO 06 RANJCET DAFAI AMLAI COLLIERY DISTT ANUPPUR M P | ANUPPUR | ANUPPUR | MADHYA PRADESH | ₹1.1 Cr+₹37.0 L (51.7%) | L-4 | Rejected-Finance Rejected as L-4 |
| Sl No | Description | Qty | Unit | UDAY RAJ SINGH L4 | ASHUTOSH KUMAR SINGH L2 | SURENDRA KUMAR SINGH L3 | RAVI KUMAR JAISWAL L1 |
|---|---|---|---|---|---|---|---|
| 1.00PARTICULAR | |||||||
| 1.01 | Cleaning/ removal of debris/stone from galleries and stacking within 50m distance | 138.06 | cubic mtr | 82,697.94 ₹97,583.57 | 64,911.67 ₹76,595.77 | 81,455.4 ₹96,117.37 | 48,321 ₹57,018.78 Lowest |
| 1.02 | Cutting in soft stone by Chisel & Hammer | 28.67 | cubic mtr | 1,73,740.2 ₹2,05,013.44 | 1,36,127.17 ₹1,60,630.06 | 1,73,596.85 ₹2,04,844.28 | 1,00,345 ₹1,18,407.1 Lowest |
| 1.03 | Cutting of coal by using chisel/pick-axe | 86 | cubic mtr | 1,43,018 ₹1,68,761.24 | 1,12,107.02 ₹1,32,286.28 | 1,42,760 ₹1,68,456.8 | 86,000 ₹1,01,480 Lowest |
| 1.04 | RCC (1:2:4) in wall/roof ceiling of air crossing/ stopping (any thickness) in u/g (Excluding centring, shuttering, reinforcement cutting, bending, placing in position and binding etc all complete as well as cost of RCC materials) | 389.84 | cubic mtr | 21,11,763.28 ₹24,91,880.67 | 16,54,539.44 ₹19,52,356.54 | 21,10,983.6 ₹24,90,960.65 | 13,83,932 ₹16,33,039.76 Lowest |
| 1.05 | Cement concrete/PCC (1:2:4) in foundation /plinth / flooring/wall (any thickness) in u/g (Excluding centring, shuttering and cost of CC materials) | 8.19 | cubic mtr | 36,093.33 ₹42,590.13 | 28,294.81 ₹33,387.88 | 36,076.95 ₹42,570.8 | 20,475 ₹24,160.5 Lowest |
| 1.06 | Centring, shuttering, finishing and reinforcement including cutting, bending, placing in position and binding and strutting, propping etc complete. | 2,029.48 | square meter | 21,08,629.72 ₹24,88,183.07 | 16,54,452.39 ₹19,52,253.82 | 21,06,600.24 ₹24,85,788.28 | 12,98,867.2 ₹15,32,663.3 Lowest |
| 1.07 | 06 mm Thick cement plaster/cement punning (1:4) to RCC/PCC work in u/g including curing etc complete(exclusive cost of materials) | 2,475.45 | square meter | 9,33,244.65 ₹11,01,228.69 | 7,34,688.81 ₹8,66,932.79 | 9,28,293.75 ₹10,95,386.63 | 5,56,976.25 ₹6,57,231.98 Lowest |
| 1.08 | White washing in u/g with white lime to give an even shade on old work/new work | 1,416.83 | square meter | 24,652.84 ₹29,090.35 | 19,637.26 ₹23,171.97 | 24,086.11 ₹28,421.61 | 11,334.64 ₹13,374.88 Lowest |
| 1.09 | Loading of all kinds of building materials into Tub at Incline/pit mouth on surface with lead of 50m
CEMENT | 2,726 | bag | 28,623 ₹33,775.14 | 23,688.94 ₹27,952.95 | 28,623 ₹33,775.14 | 17,719 ₹20,908.42 Lowest |
Tender Value
₹98.8 L
EMD Value
₹1.2 L
Closing Date
23 May 2026, 5:00 pmClosed
STAFF OFFICER MINING
OFFICE OF THE STAFF OFFICER MINING
Construction of 39 Nos. RCC Isolation stoppings in proposed depillaring Panel ( CM Panel-C3 and C4) in VI Top Seam at Bangwar UG Mine
2026_SECL_359169_1
SECL/SGP/SO(M)/2025-26/NIT-727 dated 06-05-2026
Open Tender
Civil Works - Others
Item Rate
365 days
BANGWAR UG MINE
as per NIT
8 documents required · 8 mandatory
₹1.2 L
8 Sept 2026
6 May 2026
25 May 2026
6 May 2026
23 May 2026
7 May 2026
6 May 2026 - 16 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PARTICULAR | |||||
| 1.01 | Cleaning/ removal of debris/stone from galleries and stacking within 50m distance | - | cubic mtr | 545.17 | - |
| 1.02 | Cutting in soft stone by Chisel & Hammer | - | cubic mtr | 5,510.07 | - |
| 1.03 | Cutting of coal by using chisel/pick-axe | - | cubic mtr | 1,512.57 | - |
| 1.04 | RCC (1:2:4) in wall/roof ceiling of air crossing/ stopping (any thickness) in u/g (Excluding centring, shuttering, reinforcement cutting, bending, placing in position and binding etc all complete as well as cost of RCC materials) | 1 | cubic mtr | 4,925.15 | ₹4,920.22 |
| 1.05 | Cement concrete/PCC (1:2:4) in foundation /plinth / flooring/wall (any thickness) in u/g (Excluding centring, shuttering and cost of CC materials) | 1 | cubic mtr | 4,008.8 | ₹4,004.79 |
| 1.06 | Centring, shuttering, finishing and reinforcement including cutting, bending, placing in position and binding and strutting, propping etc complete. | - | square meter | 945.21 | - |
| 1.07 | 06 mm Thick cement plaster/cement punning (1:4) to RCC/PCC work in u/g including curing etc complete(exclusive cost of materials) | 1 | square meter | 343.79 | ₹343.45 |
| 1.08 | White washing in u/g with white lime to give an even shade on old work/new work | 1 | square meter | 15.86 | ₹15.84 |
| 1.09 | Loading of all kinds of building materials into Tub at Incline/pit mouth on surface with lead of 50m
CEMENT | - | bag | 9.69 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.76 MB
Tendernotice_2.pdf
PDF • 1.47 MB
BOQ_372037.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .