| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹88.0 LAccepted-AOC NOT SPECIFIED | ₹88.0 L Quoted ₹74.6 L | L1 | Accepted-AOC Work order issued |
| 2 | L2₹76.0 L+₹1.4 L (1.91%)Rejected-Finance | ₹76.0 L+₹1.4 L (1.91%) | L2 | Rejected-Finance L2 |
| 3 | L3₹81.2 L+₹6.6 L (8.80%)Rejected-Finance | ₹81.2 L+₹6.6 L (8.80%) | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹1.8 L
Closing Date
18 May 2026, 3:00 pmClosed
EE
Nagar Nigam Gorakhpur
Ward Number 11 vargon Mein Maurya Chauk se bamanti Mata Mandir Hote Hue Raju ke Makan Tak RCC nalika Nirman
2026_DOLBU_1133793_2
Jal Nikasi Sr. 13 Ward 11
Open Tender
Civil Works
Percentage
120 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
Nagar Nigam Gorakhpur
₹1.8 L
29 Aug 2026
12 May 2026
18 May 2026
12 May 2026
18 May 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1A | |||||
| 1.01 | Dismentling of old C.C. | 1 | Cu.M | 850 | ₹849.15 |
| 1.02 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in charge upto a distance of 30 M. from the foundation trenches.SI No.251a | 1 | Cu.M | 120 | ₹119.88 |
| 1.03 | Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.(S.I No-273) | - | Cu.M | 4,007 | - |
| 1.04 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in supply of all materials, labour, Tools & plants etc. required for proper completion of the work.(S.I No-289) | 1 | Cu.M | 9,082 | ₹9,072.92 |
| 1.05 | M.S. (Tor steel or plain) in plain work such as R.C.C or R.B work including bending for proper shape as necessary including bending for proper completion of the work and including supply of all steel & wastage, bend, hooks, and authorised overlapping shall be measured. (S.I-504) | - | Qtl. | 7,690 | - |
| 1.06 | P/fixing of road barricating i/c.all complete of work. | 30 | R.M | 118 | ₹3,540 |
| 1.07 | Dewatering by pump | - | hr | 105 | - |
| 1.08 | Cartage of surplus earth ,malva.with all complete | 1 | Cu.M | 165 | ₹164.84 |
| 1.09 | Cleaning of site | - | Job | 50,000 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.01 MB
t.pdf
Tender Documents • 6.19 MB
BOQ_2147300.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .