Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.5 LAdmitted-Finance B 29 H 4 GOBRA GORASTHAN ROAD BAMUNPARA KOLKATA 700046 | KOLKATA | KOLKATA | WEST BENGAL | 700046 | +0.00% | ₹2.5 L | L1 | Admitted-Finance |
| 2 | L2₹2.5 L+₹2,977.55 (1.20%)Admitted-Finance 29 GOBRA GORISTHAN ROAD KOLKATA 700046 | KOLKATA | KOLKATA | WEST BENGAL | 700046 | +1.20% | ₹2.5 L+₹2,977.55 (1.20%) | L2 | Admitted-Finance |
| 3 | L3₹2.5 L+₹3,101.61 (1.25%)Admitted-Finance 01 CHANGSARI KAMRUP ASSAM 781101 | KAMRUP | ASSAM | 781101 | +1.25% | ₹2.5 L+₹3,101.61 (1.25%) | L3 | Admitted-Finance |
Tender Value
₹2.5 L
EMD Value
₹5,000
Closing Date
12 Jun 2026, 2:00 pmClosed
DyCE_WS-II
5 S.N Banerjee Road, Kol-700013
IMPROVEMENT OF RELIABILITY BY REPLACEMENT OF DEFECTIVE SPARES OF HORIZONTAL SPLIT CASING CENTRIFUGAL PUMP NO. 02 AT G J KHAN BPS
2026_KMC_1025739_1
KMC/WS/GJKBPS/25-26/11
Open Tender
MECHANICAL
Percentage
10 days
GJ Khan BPS
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,000
17 Jul 2026
3 Jun 2026
15 Jun 2026
3 Jun 2026
12 Jun 2026
3 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | DE-COUPLING OF THE HT PUMP FROM THE DRIVE MOTOR BY REMOVING THE COUPLING BOLTS ETC WITH CARE AND CAUTION AND KEPT THE COUPLING BOLTS IN THE DEPARTMENTAL GODOWN AND COMPLETE AS PER DIRECTION OF EIC. RATE ANALYSIS APPROVED BY DG(WS) ON DATED 15/06/2018 | 1,212.12 | IU | 0.45 | ₹545.45 |
| 2 | REMOVAL OF HORIZONTAL/VERTICAL SPLIT TOP VOLUTE AFTER LOOSENING THE NUTS AND BOLTS FROM THE BOTTOM VOLUTE OF THE HT PUMP WITH UTMOST CARE BY USING DEPARTMENTAL OVER HEAD CRANE & KEEP THE TOP VOLUTE AT THE WORKING FLOOR AND AFTER COMPLETION OF THE NECESSARY INSPECTION/WORKS ETC & AGAIN PLACING THE TOP VOLUTE ON THE BOTTOM VOLUTE WITH NECESSARY HYDRAAULIC PAPER ETC ALONG WITH THE SCALING OF BOTH NDE & DE SIDE OF VOLUTE CASING TO PREVENT SUCKING OF AIR & BOLTED UP OF THE TOP AND BOTTOM VOLUTE CASING & COMPLETE AS PER DIRECTION OF EIC. RATE ANALYSIS APPROVED BY DG(WS) ON DATED 15/06/2018 | 1,212.12 | IU | 1.75 | ₹2,121.21 |
| 3 | TAKEN OUT OF THE SHAFT -IMPELLER ASSEMBLY FROM THE BOTTOM VOLUTE OF THE HT PUMP AND KEPT ON THE PEDESTAL WITH CARE & CAUTION & COMPLETE AS PER DIRECTION OF EIC RATE ANALYSIS APPROVED BY DG(WS) ON DATED 15/06/2018 | 205 | KG | 8.5 | ₹1,742.5 |
| 4 | TO & FRO TRANSPORTATION OF COMPLETE SHAFT - IMPELLER ASSEMBLY FROM PUMP-HOUSE WORK SITE TO THE CONTRACTORS WORKSHOP AND VICE- VERSA INCLUDING LOADING AND UNLOADING WITH PROPER CARE AS PER DIRECTION OF EIC.RATE ANNALYSIS APPROVED BY DG(WS) ON DATED15/06/2018 | 205 | KG | 9.5 | ₹1,947.5 |
| 5 | REMOVAL OF HALF COUPLING USING THE HYDRAULIC PULLER & FIXTURES ETC. VERY CAUTIOUSLY FROM THE SHAFT AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. RATE ANNALYSIS APPROVED BY DG(WS) ON DATED 15/06/2018 | 1,212.12 | IU | 0.55 | ₹666.67 |
| 6 | FITTING & FIXING OF THE HALF COUPLING BY HYDRAULIC JACK & SPECILIZED FIXTURE ETC. & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. RATE ANALYSIS APPROVED BY DG(WS) ON DATED 15/06/2018. | 1,212.12 | IU | 0.5 | ₹606.06 |
| 7 | TAKING OUT THE BEARINGS ( HAVING ID 75 MM TO 200 MM) WITH PROPER CARE & CAUTION BY PROVIDING ALL RELEVANT TOOLS & FIXTURES AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. RATE ANALYSIS APPROVED BY DG(WS) ON DATED 15/06/2018. | 217.3 | CM2 | 50 | ₹10,865 |
| 8 | TRUENESS AND ECCENTRICITY CHECKING OF THE SHAFT IMPELLER ASSEMBLY, TRUENESS CHECKING OF THE COUPLING AND DYNAMIC BALANCING THE COMPLETE ASSEMBLY BY ADDING OR REMOVING THE UNBALANCED MASS AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. THE BALANCING CERTIFICATE MUST BE FURNISHED TO THE DEPARTMENT. RATE ANNALYSIS APPROVED BY DG(WS) ON DATED 15-06-2018 | 225 | KG | 27 | ₹6,075 |
| 9 | POSITIONING, FITTING & FIXING THE COMPLETE ROTATING ASSEMBLY ON THE PUMP BOTTOM VOLUTE WITH ALL SEQUENTIAL PROCEEDINGS AND KEEPING UTMOST CARE & CAUTION AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. RATE ANNALYSIS APPROVED BY DG(WS) ON DATED 15/06/2018. | 245 | KG | 25 | ₹6,125 |
| 10 | MAKING ALIGNMENT OF THE SHAFTS OF PUMP & MOTOR BY USING DIAL GAUGE ETC, INCLUDING INSERTION OF REQUISITE DIMENTIONED BRASS SHEETS & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. RATE ANNALYSIS APPROVED BY DG(WS) ON DATED 15/06/2018 | 1,212.12 | IU | 2.25 | ₹2,727.27 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
Techbid.pdf
Tender Documents • 0.45 MB
BOQ_2520358.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .