| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC 93 SOUTH ZONE COIMBATORE CORPORATION | TIRUPPUR | TAMIL NADU | 638459 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹2.5 L+₹34.20 (0.01%)Rejected-AOC | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | SARGURU ENTERPRISES L1 | R KANNAN L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work for CC Flooring to required depth, either by cutting and disposal of excavated soil to areas of fill or by filling with earth suitable for filling brought from areas of cutting or borrow pits in all kinds of soils except rock requiring blasting | 15 | Cum | 181.1 ₹2,716.5 Lowest | 181.1 ₹2,716.5 Lowest |
| 2.00 | Conveyance the excess earth or earth not suitable for refilling, dumping and spreading, levelling of the same at places of dump approved by departmental officers and as directed including lorry hire charges, labour for loading, unloading, spreading, leveling, making approaches for areas of dumps etc., complete. | 15 | Cum | 67.8 ₹1,017 Lowest | 67.8 ₹1,017 Lowest |
| 3.00 | Cement concrete 1:4:8 (one cement, four sand and eight aggregate ) using 40mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 15 | Cum | 5,590 ₹83,850 Lowest | 5,590 ₹83,850 Lowest |
| 4.00 | Supplying and erecting centering for sides and soffits including supports and strutting for plain surfaces such as reinforced cement concrete slabs, walls etc., with all cross bracing etc., including decentering after curing period,complete complying with standard specifications, at all leads inside the building, at all heights. | 7.2 | Sqm | 489 ₹3,520.8 Lowest | 489 ₹3,520.8 Lowest |
| 5.00 | Plain cement concrete 1:2:4 mix (One part of cement, two parts of sand and four aggregates) using 20mm gauge hard stones complying with standard specification. | 11 | Cum | 6,963 ₹76,593 Lowest | 6,963 ₹76,593 Lowest |
| 6.00 | Centering for Bed block, Lintel, Beam, Slab and Staircase slab plain surface including struttingslabs plain surface including strutting etc., complete cost and conveyanceof all materials to site and all labourcharges etc., complete. | 15 | Sqm | 1,086.8 ₹16,302 Lowest | 1,086.8 ₹16,302 Lowest |
| 7.00 | Supply and fabrication of R.T.S. rods in various dia including cutting bending placing in position and tying etc. | 3.5 | Qtl | 9,321.5 ₹32,625.25 Lowest | 9,321.5 ₹32,625.25 Lowest |
| 8.00 | Supply and fixing of SFRC Man hole 450 x 450 mm with cover as per the direction of departmental officer., | 4 | Nos | 946.7 ₹3,786.8 Lowest | 946.7 ₹3,786.8 Lowest |
| 9.00 | Cement concrete 1:1.5:3 (one cement, one and a half sand and three aggregate) using 20mm gauge hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete and also including fixing fan clamps and fixtures in RCC works wherever necessary as directed by departmental officer etc., complete. | 3.5 | Cum | 8,751.7 ₹30,630.95 Lowest | 8,751.7 ₹30,630.95 Lowest |
| 10.00Add :- GST @ 18% | |||||
Tender Value
₹3 L
EMD Value
₹3,000
Closing Date
30 Oct 2025, 3:00 pmClosed
Assistant Commissioner, South Zone
South Zone, Coimbatore Corporation, Kuniyamuthur, Coimbatore 641008
Restoration of cement concrete flooring for damaged surface due to UGSS and HSC pipe line works at Periyasamy servai street in Ward No 96, South Zone
2025_MAWS_616185_35
E6 / South Zone / 2025
Open Tender
Civil Works
Works
120 days
South Zone, Coimbatore Corporation
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹3,000
1 Dec 2025
25 Oct 2025
31 Oct 2025
26 Oct 2025
30 Oct 2025
26 Oct 2025
Amount
Earth work for CC Flooring to required depth, either by cutting and disposal of excavated soil to areas of fill or by filling with earth suitable for filling brought from areas of cutting or borrow pits in all kinds of soils except rock requiring blasting
Conveyance the excess earth or earth not suitable for refilling, dumping and spreading, levelling of the same at places of dump approved by departmental officers and as directed including lorry hire charges, labour for loading, unloading, spreading, leveling, making approaches for areas of dumps etc., complete.
Cement concrete 1:4:8 (one cement, four sand and eight aggregate ) using 40mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete.
Supplying and erecting centering for sides and soffits including supports and strutting for plain surfaces such as reinforced cement concrete slabs, walls etc., with all cross bracing etc., including decentering after curing period,complete complying with standard specifications, at all leads inside the building, at all heights.
Plain cement concrete 1:2:4 mix (One part of cement, two parts of sand and four aggregates) using 20mm gauge hard stones complying with standard specification.
Centering for Bed block, Lintel, Beam, Slab and Staircase slab plain surface including struttingslabs plain surface including strutting etc., complete cost and conveyanceof all materials to site and all labourcharges etc., complete.
Supply and fabrication of R.T.S. rods in various dia including cutting bending placing in position and tying etc.
Supply and fixing of SFRC Man hole 450 x 450 mm with cover as per the direction of departmental officer.,
Cement concrete 1:1.5:3 (one cement, one and a half sand and three aggregate) using 20mm gauge hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete and also including fixing fan clamps and fixtures in RCC works wherever necessary as directed by departmental officer etc., complete.
Add :- GST @ 18%
SARGURU ENTERPRISES (BID ID -1499438)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
0.66 MB
Additional Documents
Additional Documents • 0.20 MB
Tender Documents
Tender Documents • 0.56 MB
BOQ
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .