Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹14.7 CrAccepted-AOC 121 THIRUMURUGAN NAGAR VEERIYAMPALAYAM ROAD KALAPATTY POST COIMBATORE 641048 | COIMBATORE | TAMIL NADU | 641048 | ₹14.7 Cr Quoted ₹15.5 Cr | L 1 | Accepted-AOC L1 |
Tender Value
Refer Docs
EMD Value
₹26.9 L
Closing Date
18 Feb 2026, 3:00 pmClosed
Chief Engineer
Chief Engineer, Civil Engineering Department, VOC Port Authority.
Construction of Yoga Park and Children Park in Both Sides of Creek (Near Port Community Hall) at V.O.Chidambaranar Port
2026_VOCPT_266913_1
R-39 CE/RCM BM/2025-26
Open Tender
Civil Works
Works
365 days
VOC Port
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹26.9 L
Yes
9 Mar 2026
12 Feb 2026
19 Feb 2026
12 Feb 2026
18 Feb 2026
12 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Schedule - A - Creation of Yoga Park with an area of about 4 acres with recreation area at VOC Port Authority | |||||
| 1.01 | CIVIL Works:
Clearing scrub Jungle and Surface dressing of the Floor. The rate including hire charges of all machineries, removing of all rubbish from site, lead upto 50m, transportat charges and labour charges etc., complete complying with standard specification. | - | Sqm | 6 | - |
| 1.02 | Earth work excavation and desposting on banks with initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel, stony earth and earth mixed with small size boulders etc., As per SS 20B excluding hard rock requiring blasting Inclusive of 17,23 shoring shuttering, baling out water where ever necessary 24 and including refilling consolidation etc., complete in all respects complying with relevent standard specifications and as directed by departmental officers. | - | Cum | 108 | - |
| 1.03 | Supplying and filling of Gravel / Good Earth by lorry in Foundation basement filling and site filling with approved materials excavation from approved quarries and compacted to meet requirement of table 300-1, 300-2 of MORTH, in layers not exceeding 250 mm loose thickness, spreading, breaking clods, removal of roots and other organic materials to the required line, grade and cross-section including watering, spreading by Dozer, grading by motor grader and consolidation by vibratory road roller with desired field density not less than 95% of maximum dry density ,including all lead,lift, loading, unloading, all labour, hire charges of all machineries, Transportation, etc., complete in accordance with MORTH technical specification clause No. 305 and with all other incidental charges and as per the direction of the Engineer-In-Charge.
Back filling with available filling | - | Cum | 108 | - |
| 1.04 | Supplying and filling of Gravel / Good Earth by lorry in Foundation basement filling and site filling with approved materials excavation from approved quarries and compacted to meet requirement of table 300-1, 300-2 of MORTH, in layers not exceeding 250 mm loose thickness, spreading, breaking clods, removal of roots and other organic materials to the required line, grade and cross-section including watering, spreading by Dozer, grading by motor grader and consolidation by vibratory road roller with desired field density not less than 95% of maximum dry density ,including all lead,lift, loading, unloading, all labour, hire charges of all machineries, Transportation, etc., complete in accordance with MORTH technical specification clause No. 305 and with all other incidental charges and as per the direction of the Engineer-In-Charge.
back filling with brought from out side | - | Cum | 345 | - |
| 1.05 | Providing and constructing cast in situ hydraulic bored piles of specified diameter in M30 grade concrete using blended cement - slag cement with minimum cement content of 400kg/m³ in accordance with the structural engineers drawings and directions, but excluding reinforcement including cost of mobalization of all necessary plants, equipment's like piling rigs, temporary casing of appropriate length for setting out cardinal points and the removal of the same, boring in overburden, using bentonite mud circulation technique or any other method duly through all strata upto the foundation level of piles etc., complete all as approved by the departmental engineer. Further include dewatering, placing concrete by tremie pipe method, disposal of bored material outside the site. Including Chipping carefully cut off portion of piles as required without any damage to the piles and dressing the top and removing all the debris away from the site without any extra cost as directed including the cost of all tools, plants, conveyance, all labour, lead and lift required etc .,Conducting standard penetration test to identify the refusal strata for at least 1 pile in group and at least 25% of piles, comparing with refusal strata as identified in soil report and providing socketting into refusal strata by 1.00mt or into hard rock by 100% dia of the pile. (Length of pile for payment shall be measured up to bottom of pile cap).
Pile 24'' Dia | - | Rm | 400 | - |
| 1.06 | Supplying and Filling with M ‐ sand in foundation and others sub structures for 100mm thick and well watered, rammed and consolidated by power compacter. The rate includes the cost of M sand, compacting with mechanical compactors, labour charges for leveling, loading & Unloading and Transportation charges etc., complete and as per the standard specification. | - | Cum | 807 | - |
| 1.07 | Providing and Laying the Plain Cement concrete 1:4:8 (One cement Four sand and Eight broken Machine crushed stone jelly) using HBG Machine crushed stone jelly of size 40mm gauge for foundation and basement including de‐ watering if found necessary and laid in layers of not more than 15cms thick etc., including laying,compacting curing etc.,complete complying with standard specification and as directed by the departmental officers. The rates inclusive of Centering ,shuttering, strutting, propping,removal of form work if it is required and all leads ,lifts etc.. | - | Cum | 1,883 | - |
| 1.08 | Supplying and erecting centering for sides and soffits including supports and strutting up to 3.30 m height with all cross bracing for plane surfaces as detailed below, using mild steel sheets of 90 X 60 cm 10 gauge stiffened with MS angle of 25 X 25 X 3mm for boarding, laid over adjustable span & jacks and supported by 50mm dia pipes for general pipes scaffolding systems @ a spacing of 1.20m c/c and vertical connected at a height of 2.0m c/c including 'C' & 'U' clamps and base receiver cup at bottom for connecting pipes etc and removable systems etc., the rate including cost of all materials, labour charges, wastages, placing, transportation, lead & lifts, tools & plants, fuels, fixing in position at all levels, heights, masking tape in sheet joints, consumables, etc. as complete with all respects complying with relevant standard specification, as directed by the Engineer‐in‐charge. For column etc. | - | Sqm | 935 | - |
| 1.09 | Supplying and erecting centering for sides and soffits including supports and strutting up to 3.30 m height with all cross bracing for plane surfaces as detailed below, using mild steel sheets of 90 X 60 cm 10 gauge stiffened with MS angle of 25 X 25 X 3mm for boarding, laid over adjustable span & jacks and supported by 50mm dia pipes for general pipes scaffolding systems @ a spacing of 1.20m c/c and vertical connected at a height of 2.0m c/c including 'C' & 'U' clamps and base receiver cup at bottom for connecting pipes etc and removable systems etc., the rate including cost of all materials, labour charges, wastages, placing, transportation, lead & lifts, tools & plants, fuels, fixing in position at all levels, heights, masking tape in sheet joints, consumables, etc. as complete with all respects complying with relevant standard specification, as directed by the Engineer‐in‐charge. For Plane surfaces such as RCC floor slab, roof slab, beams, lintels, bed blocks, landing slab, waist slab, portico slabs and beams, etc. | - | Sqm | 1,035 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
retechbidyoga.pdf
Tender Documents • 19.64 MB
BOQ_310240.xls
BOQ • 0.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].