Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.8 CrAccepted-Finance | ₹14.8 Cr | L1 | Accepted-Finance Lowest Bid |
| 2 | L2₹16.0 CrAccepted-Finance | ₹16.0 Cr | L2 | Accepted-Finance Higher Bid |
| Sl No | Description | Qty | Unit | B.M.Enterprises L1 | Ms Sha Enterprise L2 |
|---|---|---|---|---|---|
| 1.00SH : FORMATION CUTTING | |||||
| 2.00 | Excavation in Soil with Dozer with lead upto 100 metres (Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. | 41,752.27 | Cum | 241.3 ₹1.0 Cr | 269.24 ₹1.1 Cr |
| 3.00 | Excavation in Ordinary Rock with Dozer with lead upto 100 metres (Excavation for roadway in ordinary rock by deploying a dozer, 80 HP including cutting and pushing the cut earth to site of embankment upto a distance of 100 metres ( average lead 50 metres ), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross sections.) | 13,917.42 | Cum | 455.8 ₹63.4 L | 455.8 ₹63.4 L |
| 4.00SH:- CROSS DRAINAGE | |||||
| 5.00a) RCC S/ Culvert 2.00 m Span - 2.00 m Ht)-2 Nos | |||||
| 6.00Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) | |||||
| 7.00Ordinary soil | |||||
| 8.00Manual Means | |||||
| 9.00 | upto 3 m depth | 185.4 | Cum | 337.5 ₹62,572.50 | 340 ₹63,036 |
| 10.00 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) | 47.52 | Cum | 10,993 ₹5.2 L | 11,074.48 ₹5.3 L |
Tender Value
Refer Docs
EMD Value
₹15.0 L
Closing Date
9 Apr 2026, 11:00 amClosed
Executive Engineer
Office of the Executive Engineer, PWD, Tali Division.
Construction of Road from Rikung in Upper Subansiri District to Tedung via Pilua in Kra Daadi District (L-60.00 Km)Ph-IV.
2026_PWDAP_3347_1
TD/W-12/RIDF/2025-26/ 07
Open Tender
Civil Works
1095 days
Kra Daadi
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
EE, PWD, Tali Division
₹15.0 L
16 Apr 2026
27 Mar 2026
9 Apr 2026
27 Mar 2026
9 Apr 2026
27 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SH : FORMATION CUTTING | |||||
| 2Excavation in Soil with Dozer with lead upto 100 metres (Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. | |||||
| 3Excavation in Ordinary Rock with Dozer with lead upto 100 metres (Excavation for roadway in ordinary rock by deploying a dozer, 80 HP including cutting and pushing the cut earth to site of embankment upto a distance of 100 metres ( average lead 50 metres ), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross sections.) | |||||
| 4SH:- CROSS DRAINAGE | |||||
| 5a) RCC S/ Culvert 2.00 m Span - 2.00 m Ht)-2 Nos | |||||
| 6Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) | |||||
| 7Ordinary soil | |||||
| 8Manual Means | |||||
| 9upto 3 m depth | |||||
| 10PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
TenderDocument.pdf
Tender Documents • 6.42 MB
BOQ_3543.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid