| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.9 LAccepted-AOC BASE CAMP CHORAYA JHAMARKOTRA MINES 313015 UDAIPUR RAJ | UDAIPUR | UDAIPUR | RAJASTHAN | 313015 | ₹23.9 L | L1 | Accepted-AOC DLOA issued |
| 2 | L2₹24.0 LRejected-Finance BASE CAMP CHAURAHA JHAMARKOTRA MINES UDAIPUR 313015 RAJ | 313015 | ₹24.0 L | L2 | Rejected-Finance quoted rate on higher side |
| 3 | L3₹25.1 LRejected-Finance 126 ZINC SMELTER CHOURAHA DEBARI UDAIPUR RAJ 313024 | UDAIPUR | RAJASTHAN | 313024 | ₹25.1 L | L3 | Rejected-Finance quoted rate on higher side |
| 4 | L4₹26.7 LRejected-Finance | ₹26.7 L | L4 | Rejected-Finance quoted rate on higher side |
Updated dates
Tender Value
₹26.7 L
EMD Value
₹53,400
Closing Date
6 Jan 2026, 3:00 pmClosed
Group General Manager (contracts)
RSMML Corporate office 4 Meera Marg Udaipur, Rajasthan
Construction of boundary wall from base camp chauraha to welcome gate of Jhamarkotra Mines Udaipur
2025_RSMML_515517_1
Contract 12
Open Tender
Civil Works
180 days
Jhamarkotra Udaipur
as per tender
14 documents required · 14 mandatory
₹1,180
RSMML
₹53,400
Yes
6 Apr 2026
25 Nov 2025
7 Jan 2026
25 Nov 2025
6 Jan 2026
25 Nov 2025
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: Group General Manager (Contracts), Corporate Office,RSMML, Udaipur
Name of Work: Construction of Boundary Wall from Base Camp Chauraha to Welcome Gate of Jhamarkotra Mines, Udaipur (Raj.)
Contract No: e-Tender No. RSMM/CO/GGM(Cont)/Cont-12/2025-26 Dated 25.11.2025
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description G-schedule .T1. Part-A of this G-schedule is based on Rajasthan Integrated PWD BSR-2022 (Building) and Part-B is based on PWD BSR-2022 (Electrical) Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes in Rs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
1 Part-A: PWD BSR Items Earth work in excavation by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils (B1-44/1.8) 232.65 cum 178 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
2 Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40 mm nominal size). (B3-54/3.1.6) 31.02 cum 3302 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
3 Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in: cement mortar 1:6 (1 cement: 6 sand) (B6-69/6.1.6) 244.28 cum 2838 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
4 Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level; M15 grade Nominal Mix 1: 2: 4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20mm nominal size). (B3-54/3.1.2) 17.45 cum 4624 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
5 Random Rubble stone masonary for super structure above plinth level one storey height above 30 cm thick wall in cement mortar 1:6 (1 cement: 6 sand) (B6-69/6.2.6) 279.61 cum 3479 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
6 Add extra for Random Rubble stone masonary with hard stone in square or rectangular pillars (B6-69/6.3.1) 37.06 cum 173 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
7 Providing and laying cement concrete including curing, compaction etc. complete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, levelling course etc up to floor five level excluding the cost of centering and shuttering.; M15 grade Nominal Mix 1: 2: 4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20mm nominal size). (B3-55/3.2.2) 18.38 cum 5112 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
8 Pointing on stone masonry in cement sand mortar 1:3 (1 cement: 3 sand) Raised and cut pointing. (B12-143/12.31.2) 1794.1 sqm 233 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
9 Finishing wall with water proofing cement paint of approved brand and manufacture and or required shade to give an even shade including all scaffolding: New work (Two or more coats applied @ 3.84 kg/10 sqm). (B12-145/12.41.1) 2463.12 sqm 53 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
10 Miscellaneous Works 1 lumpsum 114277.45 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
11 Part-B: Non-BSR ItemsProviding and fixing broken glass pieces in cement concrete on top of boundary wall and pillars for security purpose. (Cost of cement concrete paid in item for coping) 517 mtr 30 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
Total in Figures 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Quoted Rate in Figures Select
Quoted Rate in Words
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_919880.xls
BOQ • 0.20 MB
cont12tender.pdf
Tender Documents • 1.09 MB
Download all tender documents and submit your bid