| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.7 LRejected-Finance | ₹11.7 L | L1 | Rejected-Finance Due to not agree to draw agreement |
| 2 | L2₹16.0 L+₹4.3 L (37.0%)Rejected-Finance | ₹16.0 L+₹4.3 L (37.0%) | L2 | Rejected-Finance L2 Bidder |
| 3 | L2₹16.0 L+₹4.3 L (37.0%)Rejected-Finance AT BHAKUDA PO BHAKUDA P S BALICHANDRAPUR DIST JAJPUR | BHAKUDA | JAJPUR | ODISHA | ₹16.0 L+₹4.3 L (37.0%) | L2 | Rejected-Finance L2 Bidder |
| 4 | L2₹16.0 L+₹4.3 L (37.0%)Rejected-Finance AT MALADA PO UDAYAPUR DIST JAJPUR | BALESHWAR | ODISHA | 756028 | ₹16.0 L+₹4.3 L (37.0%) | L2 | Rejected-Finance L2 Bidder |
| 5 | L2₹16.0 L+₹4.3 L (37.0%)Rejected-Finance AT BADAROUTPATI PO KENDUPATNA PS SALIPUR CUTTACK ODISHA 754023 | JAJAPUR | ODISHA | 754023 | ₹16.0 L+₹4.3 L (37.0%) | L2 | Rejected-Finance L2 Bidder |
Tender Value
₹16.0 L
EMD Value
₹16,000
Closing Date
12 Mar 2026, 5:00 pmClosed
Superintending Engineer
O/o the Superintending Engineer, Rural Works Division-II, Jajpur at Jaraka
Construction of Higher Secondary Class room building of Bishnu Samataray College Nuahat Arakhpur for the year 2024-25
2026_CERWI_126990_1
TENDER ONLINE JJPR-II-08 OF 2025-26
Open Tender
Civil Works - Buildings
Percentage
120 days
Jaraka
2 documents required · 2 mandatory
₹6,000
₹16,000
Yes
25 Aug 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
12 Mar 2026
7 Mar 2026
7 Mar 2026 - 12 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | R.C.C.work in M20 grade using 20mm & down graded chips etc.complete.as per direction of engineer incharge.---Lintel Beam(First Floor) | 3.01 | cum | 11,745.26 | ₹35,323.88 |
| 2 | Chajja (First Floor) | 0.98 | cum | 13,334.44 | ₹13,042.42 |
| 3 | Coulmn(First Floor) | 9.72 | cum | 17,923.06 | ₹1,74,178.08 |
| 4 | Slab (First Floor) | 22.79 | cum | 13,334.44 | ₹3,03,825.32 |
| 5 | Labour charges for cutting,bending,binding,and layingthe grills including cost of M.S. bar with conveyance charges etc,complete as per direction of engineer incharge.(First Floor) | 34.3 | cum | 9,085.59 | ₹3,11,630.45 |
| 6 | Flyash Brick masonry in C.M. (1:6) for super structure including cost, conveyance, royalties, plumbing, curing and all labour charges etc. complete as per direction of engineer incharge (First Floor) | 15.93 | cum | 6,149.95 | ₹97,959.48 |
| 7 | 12mm Thick cement plaster in C.M (1:6) over superstructure for outside wall including cost, conveyance, royalties, and watering,curing and all labour charges etc.complete.as per direction of engineer incharge(First Floor) | 165.18 | sqm | 201.64 | ₹33,307.04 |
| 8 | 16mm Thick cement plaster in C.M (1:6) over superstructure for inside wall including cost, conveyance, royalties, and watering,curing and all labour charges etc.complete.as per direction of engineer incharge(First Floor) | 319.95 | cum | 286.04 | ₹91,516.99 |
| 9 | Fitting & fixing of M.S door as per drawing at all heights | 352.8 | cum | 80 | ₹28,224 |
| 10 | Fitting & fixing of M.S window as per drawing at all heights | 403.2 | cum | 80 | ₹32,256 |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 3.21 MB
Tendernotice_1.pdf
PDF • 2.81 MB
BOQ_584353.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .