| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.8 LAccepted-AOC | ₹16.8 L | L1 | Accepted-AOC AOC |
| 2 | L2₹17.8 LRejected-AOC AT PO SARADHAPUR PS ITAMATI DT NAYAGARH ODISHA | NAYAGARH | ODISHA | 752024 | ₹17.8 L | L2 | Rejected-AOC L2 |
| 3 | L3₹17.9 LRejected-AOC | ₹17.9 L | L3 | Rejected-AOC L3 |
| 4 | L4₹18.1 LRejected-AOC PLOT NO N 6 485 P O IRC VILLAGE P S NAYAPALLI DIST KHORDHA PIN 751015 | KHORDHA | ODISHA | 751015 | ₹18.1 L | L4 | Rejected-AOC L4 |
| 5 | L5₹18.3 LRejected-AOC AT ANDOLA P O SRIDHARPUR PS JAJPUR TOWN DIST JAJPUR ODISHA 755062 | JAJAPUR | ODISHA | 755062 | ₹18.3 L | L5 | Rejected-AOC L5 |
Tender Value
₹22.3 L
EMD Value
₹22,347
Closing Date
4 May 2026, 5:30 pmClosed
Executive Engineer
RURAL WORKS DIVISION, NAYAGARH
Construction work of Neelamadhab Mahavidyalaya building at Kantilo for the year 2025-26
2026_CERWI_128396_1
TENDERONLINEDNAYAGARH022526
Open Tender
Civil Works - Buildings
120 days
Nayagarh
2 documents required · 2 mandatory
₹6,000
₹22,347
Yes
10 Jun 2026
23 Apr 2026
5 May 2026
23 Apr 2026
4 May 2026
23 Apr 2026
23 Apr 2026 - 4 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
Earth work in excavation of foundation in all kinds of soil in the structures upto 3m depth as per drawing and technical specification clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials, dressing of sides and bottom and backfilling with approved materials including cost, conveyance, royalty of all materials, labour charges, T&P etc. required for the work complete as per specification and direction of the Engineer-in-Charge. | - | cum | - | - | NI-38-9464-1 | |
Providing and filling in foundation and plinth with sand including watering & ramming with cost, conveyance, royalities of all materials with additional charges as decieded by the District Administration, DMF & EMF @15% on royality amount and cost of labour, T&P, etc. required for the work complete as per specification & direction of the Engineer-in-charge. | - | cum | - | - | NI-38-9464-2 | |
Providing and laying of cement concrete of prop. (1:3:6) using 4cm size black hard granite crusher broken stone aggregate including watering, curing and ramming with cost, conveyance, royalities of all materials with additional charges as decieded by the District Administration, DMF & EMF @15% on royality amount, labour charges, T&P etc. required for the work complete as per specification and direction of the Engineer-in-Charge. | - | cum | - | - | NI-38-9464-3 | |
Masonry work using Flyash Bricks of size 250mm X 125mm X 80mm having crushing strength not less than 75 kgs/ cm2 in cement mortar (1:6) with portland slag cement (PSC) immersing the bricks for minimum 6 hours in water before use with necessary projections, splays, cutting, circular moulding, corbelling etc. including with cost, conveyance, royalities of all materials with additional charges as decieded by the District Administration, DMF & EMF @15% on royality amount and cost of labour, T&P, etc. required for the work complete as per specification & direction of the Engineer-in-charge. | - | cum | - | - | NI-38-9464-4 | |
R.C.C. work of M-25 grade using 20mm and down graded size black hard granite crusher broken stone chips including hoisting, lowering, laying, compacting concrete, watering & curing for 28 days with centering & shuttering & finishing the exposed surface smooth providing grooves for beads wherever necessary including cost,conveyance, royalities of all materials with additional charges as decieded by the District Administration, DMF & EMF @15% on royality amount & cost of all labour, T&P etc. required for the work complete in all respect but excluding cost of M.S.rods or Tor Steel & binding wieres & labour charges for bendng & binding & tying the grills as per specification & direction of the Engineer-in-charge. (A) Column Base | - | cum | - | - | NI-38-9464-5 | |
R.C.C. work of M-25 grade using 20mm and down graded size black hard granite crusher broken stone chips including hoisting, lowering, laying, compacting concrete, watering & curing for 28 days with centering & shuttering & finishing the exposed surface smooth providing grooves for beads wherever necessary including cost,conveyance, royalities of all materials with additional charges as decieded by the District Administration, DMF & EMF @15% on royality amount & cost of all labour, T&P etc. required for the work complete in all respect but excluding cost of M.S.rods or Tor Steel & binding wieres & labour charges for bendng & binding & tying the grills as per specification & direction of the Engineer-in-charge. (B) Plinth Band | - | cum | - | - | NI-38-9464-6 | |
R.C.C. work of M-25 grade using 20mm and down graded size black hard granite crusher broken stone chips including hoisting, lowering, laying, compacting concrete, watering & curing for 28 days with centering & shuttering & finishing the exposed surface smooth providing grooves for beads wherever necessary including cost,conveyance, royalities of all materials with additional charges as decieded by the District Administration, DMF & EMF @15% on royality amount & cost of all labour, T&P etc. required for the work complete in all respect but excluding cost of M.S.rods or Tor Steel & binding wieres & labour charges for bendng & binding & tying the grills as per specification & direction of the Engineer-in-charge. (C ) Column | - | cum | - | - | NI-38-9464-7 | |
R.C.C. work of M-25 grade using 20mm and down graded size black hard granite crusher broken stone chips including hoisting, lowering, laying, compacting concrete, watering & curing for 28 days with centering & shuttering & finishing the exposed surface smooth providing grooves for beads wherever necessary including cost,conveyance, royalities of all materials with additional charges as decieded by the District Administration, DMF & EMF @15% on royality amount & cost of all labour, T&P etc. required for the work complete in all respect but excluding cost of M.S.rods or Tor Steel & binding wieres & labour charges for bendng & binding & tying the grills as per specification & direction of the Engineer-in-charge. (D) Lintel | - | cum | - | - | NI-38-9464-8 | |
R.C.C. work of M-25 grade using 20mm and down graded size black hard granite crusher broken stone chips including hoisting, lowering, laying, compacting concrete, watering & curing for 28 days with centering & shuttering & finishing the exposed surface smooth providing grooves for beads wherever necessary including cost,conveyance, royalities of all materials with additional charges as decieded by the District Administration, DMF & EMF @15% on royality amount & cost of all labour, T&P etc. required for the work complete in all respect but excluding cost of M.S.rods or Tor Steel & binding wieres & labour charges for bendng & binding & tying the grills as per specification & direction of the Engineer-in-charge. (E) Chajja | - | sqm | - | - | NI-38-9464-9 | |
R.C.C. work of M-25 grade using 20mm and down graded size black hard granite crusher broken stone chips including hoisting, lowering, laying, compacting concrete, watering & curing for 28 days with centering & shuttering & finishing the exposed surface smooth providing grooves for beads wherever necessary including cost,conveyance, royalities of all materials with additional charges as decieded by the District Administration, DMF & EMF @15% on royality amount & cost of all labour, T&P etc. required for the work complete in all respect but excluding cost of M.S.rods or Tor Steel & binding wieres & labour charges for bendng & binding & tying the grills as per specification & direction of the Engineer-in-charge. (F) Roof Beam | - | cum | - | - | NI-38-9464-10 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_588548.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 2.21 MB
Tendernotice_1.pdf
PDF • 2.07 MB
BOQ_588548.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid