| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.3 CrAccepted-AOC | ₹6.3 Cr | 1 | Accepted-AOC The rate quoted by the bidder is less than Put to tender value |
| 2 | 2₹6.6 Cr+₹33.4 L (5.33%)Rejected-AOC | ₹6.6 Cr+₹33.4 L (5.33%) | 2 | Rejected-AOC The rate quoted by the bidder is higher than Put to tender value |
Tender Value
₹6.3 Cr
EMD Value
₹3.2 L
Closing Date
31 Jan 2025, 2:00 pmClosed
Executive officer
Arulmigu Aatcheswarar Swamy Temple ,Achirapakkam
Repair and Renovation Of Moolavar sannathi with its first praharam in Arulmigu Vijaya Varadharaja Perumal Temple,Baburayanpettai,Madhuranthakam Taluk ,Chengalpattu District
2025_HRCE_518057_1
01/2025
Open Tender
Civil Works - Others
Lump-sum
365 days
baburayanpettai
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹3.2 L
Yes
28 Mar 2025
10 Jan 2025
31 Jan 2025
10 Jan 2025
31 Jan 2025
10 Jan 2025
Amount
Dismanting the brick work in roof top One Course of Terrace Bricks Roof finish for first praharam including removing all debris from site of work, etc., all complete complying with standard specifications
Carefully dismantling the existing damaged lime concrete (weathering course) which was already laid without disturbing the existing structure of the temple and incluidng charges for removing all debris from the site of work, etc., all complete complying with standard specifications
Labour charge for Removing the existing damaged brick work / stone masonry in lime mortar walls under 3m hight including removing all debris from site of work, etc., all complete complying with standard specifications
Labour charge for removing the existing damaged or dislodged stone element like pavukkal and restacking it for later use etc., all complete complying with standard specification.
Labour charge for removing the existing damaged the uthiram, bothiyal and thoon or dislodged stone element and restacking it for later use etc., all complete complying with standard specification.
Providing Two legged Scaffolding using 15cm Dia blue Gum post or Best quality Bamboo / casurina post of 4m overall length (3m ht + 0.5m Projection + 0.50m into the Ground), 3.50 -6.00m and 6.00 to 8.50 the Distance between the Two rows being 1.25m and the spacing of post being 2m ht both upto 18.00m ht etc., complete complying as per standard specification
Labour charge for removing the existing damaged cement flooring from the praharam and removing all debris from the site of work inclusive cost and convayance charge etc., all complete complying with standard specification.
Removing the existing damaged Plain cement concrete from below the existing flooring of the sannathi including removing all debris from site of works, etc., all complete complying with standard specifications
Dismantling the existing cut stone flooring of the sannathi including removing all debris from site of works, etc., all complete complying with standard specifications
Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 3 mts. and clearing and levelling the site, etc., complete complying with standard specification.
Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Lime concrete 1:5:10 (One part of cement five part of M-sand and ten part of HBG jelly )for foundation using 40mm gauge HBG jelly inclusive of shoring strutting and baling out water where ever necessary ramming and curing etc.,complete as per standard specification and as directed by the departmental officers The heritage limne should be purchased from Pollachi which is highly iron fortified and suitable for Structural and Masonary work
Supply of cut stone for carrying out temple structure works such as of wall, thoon, bothiyal, uthiram, pavukkal, nilaikkal and etc,. all comple complying with standard specification.
Temple structures upto 5'-00" length
Temple structures from 5'-00" -10'-00" length
Labour charge for dressing the new stones for first praharam including labour charge excluding the cost of cut stones etc., all complete complying with standard specification.
Dhindu course
Wall stones (Ulvari)
Thoon
Bothiyal
Uthiram
Pavukkal
Kodungai
Fixing charges for old and new stones on sannathi including cost of labour cost excluding cost of stones etc., all complete complying with standard specification.
Dhindu course
Wall stones (Ulvari)
Thoon
Bothiyal
Uthiram
Pavukkal
Kodungai
Filling the core wall with in Lime mortar 1:3 (one part of lime and three part of sand) using second class ground moulded Chamber bricks size 9" x 43/8" x 23/4" including cost and conveyance of all materials and labour charges and all other incidental charges etc completc complying with standard specification. Ground floor
Brick masonry lime mortar 1:2 (one part of lime and two part of sand) using Second class ground moulded Chamber bricks size 9" x 43/8" x 23/4" including all varivargams, moulds, sthambams, mukapathrams, koodu, nasi and all ornamental brick work complete, all pancharams, agarais, karnakoodus, etc., forming core walls of Rajagopuram/ Vimanams complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete 100 cft for vimanam / gopuram The heritage limne should be purchased from Pollachi which is highly iron fortified and suitable for Structural and Masonary work kalkaran upto 15'0" for sannathi
Re-fixing the removed cut stone slabs from praharam and the same to be dressed with single line and pointing using lime mortar 1:1.5 (one part of lime and one point five) including cost of labour cost excluding cost of stones etc., all complete complying with standard specification.The heritage limne should be purchased from Pollachi which is highly iron fortified and suitable for Structural and Masonary work
Flooring with cut stone slab of size 600 x 600mm and other sizes suitable for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and labour charges for paving and pointing with lime mortar 1:1.5 (one part of lime and one point five) etc all complete complying with standard specification.The heritage limne should be purchased from Pollachi which is highly iron fortified and suitable for Structural and Masonary work
Dressing one line
Dressing three line
Plain lime Concrete 1:2:4 (one part of lime two part of M-sand and four part of HBG jelly) for all plain cement concrete works using 20mm brick jelly in position excluding centering and shuttering but including laying, curing and finishing etc.,complete. with standard specification.The heritage limne should be purchased from Pollachi which is highly iron fortified and suitable for Structural and Masonary work
Pointing the cut stone masonary joints with lime mortar 1:1.5 (one part of lime and one point five) including cost of special tiles such brush and watering, curing etc.,complete as per standard specification and as directed by the departmental officers The heritage limne should be purchased from Pollachi which is highly iron fortified and suitable for Structural and Masonary work
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the pavukkal in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.The heritage limne should be purchased from Pollachi which is highly iron fortified and suitable for Structural and Masonary work ground floor
Providing flat bricks on the terrace top using two layer of specially manufactured superior quality chamber moulded terrace brick of size 150x75x25mm for heritage works laid with lime mortar 1:1.5 and the joints of bricks raked up to receive lime mortar plastering to be done over the roof surface. The flat bricks should be laid in such a manner with proper slope and gradient that the rain water gets discharged easily through rain water outlet pipes freely. The quality of lime to be procured from Pollachi shall be of best and high calcium oxide content quality. This flat bricks shallbe subjected to curing for a period of 7 to 10 days and after which loose lime particles will be removed and the joints raked up to take up lime mortar plastering (two layers) The heritage limne should be purchased from Pollachi which is highly iron fortified and suitable for Structural and Masonary work
Plastering with lime mortar 1:1.5 (one part of lime and one point five part of sand), 25mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications.The heritage limne should be purchased from Pollachi which is highly iron fortified and suitable for Structural and Masonary work
Plastering with lime mortar 1:1.5 (one part of lime and one point five part of sand), 20mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications.The heritage limne should be purchased from Pollachi which is highly iron fortified and suitable for Structural and Masonary work
Scraping the decayed lime plaster from the surface of Vimanams and Gopurams, carefully including isolated bricks or brickwork without damaging the vari vargams, racking out the joints, cleaning the surface with water, including all working in heights, hire charges for special tools, brushes complete superficial area including all folds complete compyling standard specifications Vimanams / Gopurams up to 50' 0" height (excluding Kalkaram)
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with lime mortar 1:1.5 (one part of lime and one point five part of sand) complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Cement Mortar1:4and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. for kalkaramThe heritage limne should be purchased from Pollachi which is highly iron fortified and suitable for Structural and Masonary work
For kalkaram
Vimanam / gopuram of ht. Up to 25'0" excluding Kalkaram
Providing new sudhai vigrahams in the vimanams and Rajagopurams with Copper rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in lime mortar 1:1.5 (one part of lime and one point five part of sand) finishing the same with lime mortar 1:1.5 (one part of lime and one point five part of sand) bringing to the correct shape (Lakshana) in conformist with silpa sastra inclusive of special ornaments, weapons, peedam etc., complete and providing cement mortar. Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as cement broken bricks, and Copper rods. binding wire all labour for working in heights, curing lifting of materials etc., complete including Exterior Emulsion painting two coats over a primary coat (one vigraham is accountable with one head, four hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is provided the rate with peetam may be adopted as detailed hereunder)The heritage limne should be purchased from Pollachi which is highly iron fortified and suitable for Structural and Masonary work
Sudhai size Up to 1' 0"
Sudhai size above 1' 0" up to 2' 6"
Sudhai size above 2' 6" up to 3' 6"
Painting two coat with approved water based exterior emulsion over the cement plastered wall surface, ceiling and other new surface including clearing preparing the surface, curing in all floors including brushes etc., complete compyling as per standard specification.
Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with Non Flamable Shaded coverings, providing ladder arrangements, country wood plant for working, inspection etc, complete hire charges only for erection, maintenance and removing the same on completion of the work1 sq,ft.
Vimanam/ Gopuram upto 15'-00" ht
Vimanam/ Gopuram upto 25'-00" ht
Supply and fixing of green shade net over the moolavar vimanam for construction including cost and conveyance etc., all complete complyinh with standard specification.
Supplying & fixing Teak wood temple type door including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc complete with std. Specifications.
Considering door size 1.04m x 1.38m = 1.64sqm
Considering door size 1.18m x 2.13m = 2.51 sqm
Considering door size 1.71m x 2.60m = 4.45sqm
Varnishing the new wood work with two coats of Varnish of good quality and color over one coat of primer over new wood work include costs of all materials, brushes charges etc, complete complying with standard specifications.
sub total
SHRI ABHIRAMI CONSTRUCTION (BID ID -1239335)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_616510.xls
BOQ • 0.35 MB
160558100.pdf
Tender Documents • 0.14 MB
160558104.html
Tender Documents • 0.06 MB
161906772.pdf
Tender Documents • 0.38 MB
PQ.pdf
Tender Documents • 0.55 MB
conditions.pdf
Tender Documents • 0.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .