Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹39.5 LRejected-Finance AURI MOR ANPARA SONEBHADRA ANPARA SONBHADRA UTTAR PRADESH 231225 | SONBHADRA | UTTAR PRADESH | 231225 | 1 | Rejected-Finance TENDER IS BEING DROPPED | |
| 2 | 2₹40.2 L+₹66,701 (1.69%)Rejected-Finance | 2 | Rejected-Finance TENDER IS BEING DROPPED | |
| 3 | 3₹41.2 L+₹1.6 L (4.13%)Rejected-Finance | 3 | Rejected-Finance TENDER IS BEING DROPPED |
Tender Value
₹37.9 L
EMD Value
₹76,000
Closing Date
11 Jul 2022, 1:00 pmClosed
SE O and MC-II, DTPS, Anpara
Office of SE O and MC-II, DTPS
Breakdown Maintenance of Boiler pressure parts, HP valves and Coal/oil/air burner and Nozzle assembly of both the units of 2x 500 MW, DTPS, ANPARA
2022_RVUNL_690552_1
T-04/BMD-I/DTPS/2022-23
Open Tender
Miscellaneous Works
Fixed-rate
365 days
BMD-I, DTPS, Anpara
As per P_QC
3 documents required · 3 mandatory
₹2,950
Dy CAO CFA and BO DTPS
₹76,000
Yes
1 Aug 2022
19 Apr 2022
12 Jul 2022
20 Apr 2022
11 Jul 2022
20 Apr 2022
20 Apr 2022 - 11 Jul 2022
Amount
Repair/rectification of water wall tubes in boiler furnace from boiler bottom header to 74-meter elevation, excluding burner zone.
When the work involves 1 to 10 joints.
When the work involves the number of joints above 10 joints.
Repair/rectification of water wall tubes in boiler furnace in burner zone between 20 meter to 41 meter elevation
When the work involves 1 to 10 joints.
When the work involves the number of joints above10 joints.
Repair/rectification of pressure parts tubes in rear water wall screen tubes, back pass super heater screen tubes, extended bottom & rear arch tubes and penthouse area.
When the work involves 1 to 10 joints.
When the work involves the number of joints above 10 joints.
Repair/rectification of the pressure parts tubes in Ceiling S/H (Roof Wall), Divisional S/H & Platen S/H
When the work involves 1 to 10 joints for SA213 TP347H & SA213T22 material
When the work involves the number of joints above 10 joints for SA213 TP347H & SA213T22 material
When the work involves 1 to 5 joints SA213T 91 materials (Preheating, post heating & SR in contractors’ scope)
When the work involves above 5 joints SA213T 91 material (Preheating, post heating & SR in contractors scope)
Repair / rectification of pressure parts tubes in CRH, HRH, water Wall Hanger Tubes and ceiling super heater associated with these zones.
When the work involves 1 to 10 joints.
When the work involves the number of joints above 10 joints
Repair/rectification of spacer tubes/ binder tubes, drain & vent tubes of superheater and Reheater.
When the work involves 1 to 10 joints.
When the work involves the number of joints above 10 joints.
Repair/rectification due to crack/ pinhole, dents in water wall, steam cooled wall, super heater/reheater attachments, drain line, roof tube or any other pressure parts tubes of Boiler.
Repair/rectification of hand hole cap, Gama plug of headers by removing it by cutting the same if required & welding it with complete NDT as per IBR.
Fixing of sky climbers in boiler furnace after making proper platform on bottom ash hopper, its operation during execution of work & dismantling and removal along with bottom ash hopper platform after completion of pressure part works.
Shifting of sky climber in boiler furnace at different locations for attending and inspection of various pressure parts zones.
Rectification / replacement of damaged clamps, binders, scalloped bars of different zones of pressure parts of Boiler.
Scalloped bars
Binder, support, Lugs.
Flexible connector (male/Female/tangent/sliding/tie support) for SA213 TP 347 H & SA213 T22
When the work involves 10 flexible connector (male/Female/tangent/sliding/tie support) For SA213 T91 (Preheating, post heating & SR in contractors scope)
Rectification/replacement of ash protectors /shielding found damaged /eroded /distorted or providing new protectors in the following pressure parts zone of boiler:
Tubular (half round) protector of superheaters and their Spacer tube. Protectors / shielding shall be rectified / installed.
Tubular protectors / shielding of water wall hanger tubes, water wall, Reheater & superheater screen tube. (For installation of protectors necessary scaffolding has to be made by the agency.)
Stress relieving of tube/header joints of thickness 12 mm and above(or as per NDT manual) .
Fin welding of water wall tubes, steam cooled roof tube as per IBR.
Erection of scaffolding and making approaches for checking of pressure parts tubes and rectification of defects if any, in the following areas/zones and their dismantling after completion of works.
Spacer tube of Divisional superheater coils.
Spacer tubes of Platen superheater coils.
Spacer tubes of CRH coils.
Spacer tubes of HRH coils.
Repair/rectification of Economizer Coil and its hanger (Upper/Middle/Lower)
When the work involves 1 to 10 joints.
When the work involves the number of joints above 10 joints.
Repair/rectification of Primary super heater coil (LTSH) and its hanger. (Upper/Lower)
When the work involves 1 to 10 joints.
When the work involves the number of joints above10 joints.
Lifting and taking out the complete coil in pair of primary super heater Horizontal coil / Economizer coil after cutting of clamps, supports clit, stoppers and releasing from subsequent headers, their restoration and positioning after repair/replacement of coil.
Repair/rectification of Back Pass Rear/Front/ Side wall Tube (steam cooled wall tube)/roof tubes of pressure parts tube for rectification of defects if any,
When the work involves 1 to 10 joints.
When the work involves the number of joints above 10 joints.
Repair / rectification of Header stubs of various headers of pressure parts.
When the work involves 1 to 10 joints.
When the work involves the number of joints above 10 joints.
Rectification/replacement of ash protectors/shielding/cassette baffles found damaged/eroded/distorted or providing new protectors in the following pressure parts zone of the boiler :
Tubular protectors/shielding of primary super heater (LTSH), economizer coils. For installation of protectors necessary scaffolding has to be made by the agency.
Box type protectors/shielding of primary super heater (LTSH), economizer coils. For installation of protectors necessary scaffolding has to be made by the agency.
Fin welding to back pass front, side and rear steam cooled wall tubes by high pressure welding.
Rectification/replacement of damaged hanger strip of economizer coils after cutting of damaged portion by cut rods, grinding of hanger support plate and welding of new/rectified hanger strip by suitable welding electrodes.
Erection of scaffolding and making approaches for checking of pressure parts tubes for rectification of defects if any, in the following areas/zones and dismantling after completion of work.
Super heater/ W.W Screen tube/Pri. Super heater verticals/Eco. Hanger tubes/Eco. Inlet Header at left / right side in single layer / elevation.
Super heater/ W.W Screen tube/Pri. Super heater vertical panels/Eco. Hanger tubes/Eco. Inlet Header from left to right side in single layer / elevation.
Economizer hopper (above)
Repair/rectification of hand hole cap, Gama plug of headers by removing it by cutting the same if required & welding it with complete NDT as per IBR.
Repair/rectification due to crack/ pinhole, dents in steam cooled wall, super heater/economizer attachments, drain line , roof tube etc.
Cutting and removal of skin casing / crown plate by grinder and welding the same with-suitable electrode as per IBR, after completion of repair jobs of pressure parts if any.
Thickness - 8mm.
Thickness - 16mm
Rectification / replacement of damaged clamps, binders, scalloped bars of different zones of pressure parts of Boiler.
Scalloped bars
Binder, support , Lugs.
U Clamp
Fabrication of bends as per site requirement by filling sand and uniform heating by heating torch of following steels:-
Carbon steel.
Alloy steel.
Build-up of eroded portion of pressure parts tubes caused by ash / steam erosion using suitable welding electrode matching with parent metal composition by Arc/Argon welding of 250mm length,35mm width.
Servicing / Revisioning of Boiler Circulation Pump Elbow down stop check valve, Nb – 350/300 mm, Design Pr. – 213.8 Kg/sq.cm
Servicing /Revisioning of manually operated Main steam stop Valve (MSV-1&2). Nb - 500 mm, Design Pr. - 191.5 Kg/ sq.cm.
Servicing/ Revisioning of Economizer Inlet Isolating gate Valve. Nb - 450 mm, Design Pr. - 320 Kg/ sq.cm.
Servicing/ Revisioning of Economizer non return flap Valve. Nb - 450 mm, Design Pr. - 320 Kg/ sq. cm.
Servicing/ Revisioning of SH Spray outlet Isolating valves. Nb -125 mm, Np - 356 Kg/ sq.cm.
Servicing/ Revisioning of pneumatically operated block Valve & Control Valve of Super heater attemparation line. Nb – 125 to 200 mm, Design Pr. –356 Kg/ sq.cm.
Servicing/ Revisioning of pneumatically operated block Valve & Control Valve of Reheater attemparation line. Nb – 65 to 100 mm, Design Pr. – 176 Kg/ sq.cm.
Servicing/ Revisioning of RH Spray outlet Isolating valves. Nb -65 mm, Np - 176 Kg/ sq.cm.
Servicing/ Revisioning of Soot blowing PRV and another similar valve. Nb 50 to 100 mm, Np – 198.9 Kg/ sq.cm
Servicing/ Revisioning of pneumatically operated Thermal drain valve and other similar valves. Nb – 25, Design Pr.- 40 Kg/cm2
Servicing/ Revisioning of High Pressure Hand operated Valves and NRVs. Nb – 10 to 200 mm.
Servicing/ Revisioning of Motor operated High Pressure valves. Nb -20 to 200 mm.
Servicing/ Revisioning of blow down valve Motor operated Valves. Nb – 40 mm , Design Pr.-210.8 kg/cm2.
Servicing/ Revisioning of Diaphragm Actuated Head valve DAHV( pneumatic) .Nb – 50 mm , Design Pr.-40 kg/cm2.
Blanking of Hot reheat and cold reheat isolating device ( Dia. 660 mm) by blanking device and normalizing the same.
Servicing/ Revisioning of Boiler Drum Safety valves. Nb – 3”/6”, Design Pr. - 209 to 216 Kg/ sq. cm.
Servicing/ Revisioning of MS line Safety valves. Nb – 3”/6”, Np - 185.5 Kg/ sq. cm.
Servicing/ Revisioning of MS line Electromagnetic relief valves. Nb – 2.5”/4”, Np – 185 to 187 Kg/ sq. cm. Temp. - 540 deg. C
Servicing/ Revisioning of Hot Re-heat & Cold Re-heat Safety valves. (a) CRH - Nb -6”/10”, Design Pr – 52.4 to 54 Kg/ sq. cm. (b) HRH – Nb -6”/8”, Design Pr – 49 to 50.5 Kg/ sq. cm.
Servicing/ Revisioning of Hot Re-heat Electromagnetic relief valves. Nb – 6”/8”, Np – 48 to 48.5 Kg/ sq. cm. Temp. - 540 deg. C
Servicing/ Revisioning of Soot blower PRV outlet Safety valves. Nb – 2.5”/4”, Np - 40 Kg/sq. cm.
Servicing/ Revisioning of Heavy & Light Oil valves (pneumatic operated) as HOTV, LOTV,HOCV,LOCV,HORTV,LORTV Nb –40-100 mm, Working Pr. -15/ 22 Kg/sq. cm.
Servicing/replacement of Air/HFO/LFO/Steam pneumatically operated Trip valves at all elevations
Servicing/replacement of Air/HFO/LFO/Steam lines valves and NRVs at all elevations
Replacement of gaskets of flanges and bonnets of valves.
Replacement of gland packing of High-pressure valves.
Attending leakage of pipelines and headers etc. of Main Boiler
Cleaning of Oil Strainer of Fuel Oil Station on firing floor.
Servicing of Gear Box of Hand operated Air motor driven valves of Main Steam line, BCP, ERV etc.
Replacement of Safety Valve seat of critical piping such As Boiler Drum, Main Steam line, Reheater line etc.
Replacement of High-pressure valve (motor operated/Hand operated) of critical piping of Boiler of size 15 - 25 mm.
Replacement of High-pressure valve (motor operated/Hand operated) of critical piping of Boiler of size 40 - 50 mm.
Replacement of High-pressure valve (motor operated) hand operated) of critical piping such as Main Steam, Final Super Heater, Primary Super Heater, CBD etc. of size 65 - 150
Replacement of H.P. valves up to 50mm by cutting with grinder, edge preparation and H.P. welding followed by post heating and stress relieving if required.
Replacement of Coal Nozzle Assy. Complete of consisting of coal nozzle casting, Adjustable coal nozzle tip, seal plate, Ribbons by repaired/ new one.
Repairing/ servicing of burner tilting lever.
Replacement of fuel Inlet elbow (short).
Replacement of fuel Inlet elbow (long).
Servicing/ revisioning of Gun Guide Assy. of AB, CD, EF & GH, JK Elevations.
Servicing/ revisioning of Oil Burners of AB, CD, EF, GH & JK Elevations.
Servicing/ revisioning of Igniter Guide pipe Assy.
Servicing/ revisioning of Scanner Guide pipe Assy.
Repairing/ revisioning of Air compartments
Arresting of coal leakage from flange of coal burner at an elevation of corners. Patch size 400 mm x 300 mm
Replacement of damaged bolts of burner compartments by cutting the stuffing box and well and welding bolt head of required size. Restoration of stuffing box by welding.
Replacement of seal tube of oil burner/Igniter/flame/scanner hoses.
Repairing / reclamation of old & used and worn-out SS coal nozzle tips.
Repairing/Reclamation of old & used worn out repairable CS coal nozzle Castings .
Replacement / Servicing of coal elbow gate
M/S BHARAT MECHANICAL AND STRUCTURAL WORKS
M/s Varghese Contractor
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .