Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹16.1 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹16.2 L+₹4,749.79 (0.29%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹17.1 L+₹1.0 L (6.31%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹17.5 L+₹1.4 L (8.54%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹19.3 L+₹3.2 L (19.6%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
25 Jun 2026, 4:00 pmClosed
Executive Engineer JKTDC
TRC Srinagar
Renovation up-gradation of Zaiqa Restaurant and other allied works at T.E. Kokernag.
2026_Tourm_312396_1
ENIT No. 4 of 2026-27
Open Tender
Civil Works
Percentage
360 days
Srinagar
Renovation up-gradation of Zaiqa Restaurant and other allied works at T.E. Kokernag.
3 documents required · 3 mandatory
₹2,500
FA and CAO JKTDC
₹50,000
2 Jul 2026
13 Jun 2026
27 Jun 2026
14 Jun 2026
25 Jun 2026
14 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Demolishing/Dismantling | |||||
| 1.01 | Demolishing cement concrete manually /by mechanical means i/c disposal upto 50m lead as directed by the competant authority by engagement of labours as per the directions of Engineer-in-charge (1:3:6) or richer mix complete job. | 2 | cum | 1,681.1 | ₹3,362.2 |
| 1.02 | Dismantling tile work in walls and flooring laid in cement mortar i/c stacking of serviceable material and disposal of unserviceable material to a designated place as decided by the competant authority upto 50m lead upto any lead all complete .( tile thickness 10mm to 25mm ) | 25 | sqm | 56 | ₹1,400 |
| 1.03 | Dismantling roofing i/c valleys, gutters complete job. | 60 | sqm | 125 | ₹7,500 |
| 1.04 | Engagement of plumber for carrying various jobs at site sub to actual during execution . | 3 | Nos | 900 | ₹2,700 |
| 1.05 | Engagement of carpenter for carrying various jobs at site sub to actual during execution . | 15 | Nos | 900 | ₹13,500 |
| 1.06 | Engagement of labours for carrying various jobs at site .(sub to act during execution .) | 20 | Nos | 750 | ₹15,000 |
| 2Concrete /Stone Work | |||||
| 2.01 | P/L in position cement concrete of specified grade i/c cuiring but excluding the cost of centering and shuttering in 1:2:4 mix (1cement:2 coarse sand: 4graded stone ggregates 20mm nominal size ) i/c all carriages and head load complete complete job. | 2.5 | cum | 8,400 | ₹21,000 |
| 3REINFORCED CEMENT CONCRETE WORK | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.06 MB
BOQ_1011124.xls
BOQ • 0.89 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .