Block Development Officer
Block Development Officer Thimiri Block 632512
Deepening Desilting, Construction of Retaining wall for baby pond, Construction of Bathing ghat, construction of steps over Bund tank, Bund improvements to Rangan kulam UI 51588P037 SF No 224/4 at Dhonimedu Panchayat Thimiri Block AGAMT-II 2022-23 R
2022_RDTN_265975_1
B1/738/2022 dated 16.11.2022
Open Tender
Civil Works
Works
90 days
Thimiri Block
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹8,400
15 Dec 2022
21 Nov 2022
7 Dec 2022
21 Nov 2022
7 Dec 2022
21 Nov 2022
Amount
Thimiri Block
1.Construction of Retaining Wall for Baby Pond, Construction of Steps Over Tank Bund, Improvements to Rangan Kulam @ Dhonimedu Panchayat In Thimiri Panchayat Union
Clearing the scrub jungle, Julliflora Jungle and disposing of the same as directed by the Engineer incharge of works and as per technical specification [ specification 2.2]
Earth work in all soils except hard rock requiring blasting and conveying and formation of bund with 0 to 100m deploying earth moving machineries and tippers including benching, formation of bunds breaking clods, sectioning, labour and Hire charges for closing breaches for extra watering and consolidation by power roller including hire charges etc complete
Desilting Earthwork Quantity
Channel Earth Quantity
Supplying and fixing of RCC Boundary Stone of size 0.15x0.15x1.60m
Construction of Retaining wall for Baby Pond
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
CC 1:3:6 mix using 40mm metal including cost and conveyance and all labour charges etc.
Plastering with CM 1:4 20 mm Thickness including cost and conveyance and all labour charges etc.,
Construction of Bathing Ghat, Steps, Outer Platform
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
CC 1:3:6 mix using 40mm metal including cost and conveyance and all labour charges etc.
CC 1:3:6 mix using 20mm metal including cost and conveyance and all labour charges etc.
CC 1:2:4 mix using 20mm metal including cost and conveyance and all labour charges etc.
Plastering with CM 1:4 20 mm Thickness including cost and conveyance and all labour charges etc.,
Construction of Steps over Bund
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
CC 1:3:6 mix using 40mm metal including cost and conveyance and all labour charges etc.
CC 1:2:4 mix using 20mm metal including cost and conveyance and all labour charges etc.
Plastering with CM 1:4 20 mm Thickness including cost and conveyance and all labour charges etc.,
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
adhambasha
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .