| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.7 LAccepted-AOC | ₹26.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹28.8 LRejected-Finance | ₹28.8 L | L2 | Rejected-Finance L2 |
| 3 | L3₹29.2 LRejected-Finance VINOD VIHAR COLONY HATHRAS | HATHRAS | UTTAR PRADESH | 202139 | ₹29.2 L | L3 | Rejected-Finance L3 |
| 4 | L4₹29.2 LRejected-Finance | ₹29.2 L | L4 | Rejected-Finance L4 |
| 5 | L5₹29.9 LRejected-Finance | ₹29.9 L | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S PUSHPENDER KUMAR SHARMA L2 | Sath Shaib Associates L4 | M/S SAVITRI CONSTRUCTION L5 | m/s. devendra kumar L1 | SUNIL KUMAR CONTRACTOR L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material as per direction of Engineer-in-charge | 31.92 | Cum | 18 ₹574.56 | 500 ₹15,960 | 200 ₹6,384 | 382.28 ₹12,202.38 | 418 ₹13,342.56 |
| 2.00 | Dismantling reinforced cement concrete including stacking of material including all cost of material, labour and T&P etc complete | 9.2 | Cum | 33 ₹303.60 | 500 ₹4,600 | 633 ₹5,823.60 | 467 ₹4,296.40 | 533 ₹4,903.60 |
| 3.00 | Earth work in foundation in all type of soil i/c all lift & lead and i/c back filling ,watering & ramming of exavated earth in to tranch or in to the space between the structure & the side of foundation tranches or in to the plinth with removal & disposal or surplus earth as directed by Engg.-in-Charge. | 131.34 | Cum | 40 ₹5,253.60 | 80 ₹10,507.20 | 50 ₹6,567 | 73.8 ₹9,692.89 | 80 ₹10,507.20 |
| 4.00 | Earth work in Filling or in embankment in ordinary soil, excavation to be in the form of irregular pits and earth work in embankments to be in 20 cm. layers, including ramming and dressing the surface to the required levels, slopes and also including all lift and all lead upto195m, the earth from cutting to be used in making embankment or to be deposited as spoil banks as directed by Engineer-in-charge. | 2,875.46 | Cum | 77.5 ₹2.2 L | 50 ₹1.4 L | 40 ₹1.2 L | 114.39 ₹3.3 L | 105 ₹3.0 L |
| 5.00 | Centering and shuttering for RCC/RB work including cost of centering & shuttering material, labour and T & P required for proper completion of the work for slab ,lintels ,sun shades, columns & walls etc. | 302.46 | Sqm | 400 ₹1.2 L | 400 ₹1.2 L | 805 ₹2.4 L | 594 ₹1.8 L | 450 ₹1.4 L |
| 6.00 | Providing and laying C.C. (A20M15)(1:2:4) including all cost of materials, labour and T&P etc complete. | 40.52 | Cum | 5,800 ₹2.4 L | 5,600 ₹2.3 L | 6,472 ₹2.6 L | 4,777 ₹1.9 L | 5,606 ₹2.3 L |
| 7.00 | Providing and laying R.C.C. (A20M25)(1:1:2) including all cost of materials, labour and T&P etc complete. | 162.27 | Cum | 6,800 ₹11.0 L | 6,800 ₹11.0 L | 8,124 ₹13.2 L | 5,996 ₹9.7 L | 6,402 ₹10.4 L |
| 8.00 | Supplying and laying TMT Steel bar reinforcement (Fe-550D) including removal of rust, cutting, bending, binding, placement with proper overlapping, providing chairs etc. required.The item includes cost of all material, labour charges, providing & binding with 24 BWG binding wire, T&P, taxes etc. required for proper completion of the required work. | 11.67 | M.T. | 65,000 ₹7.6 L | 71,000 ₹8.3 L | 69,000 ₹8.1 L | 53,078 ₹6.2 L | 62,001 ₹7.2 L |
| 9.00 | Providing and fixing P.V.C. pipe 100mm dia & 6Kg./Sq.cm I.S.I. Mark including all cost of materials, T&P and labour etc. | 2.2 | R.M. | 10 ₹22 | 60 ₹132 | 280 ₹616 | 207 ₹455.40 | 280 ₹616 |
| 10.00 | Providing & laying 1st class (M-150) Brick work pitching in 1:4 cement mortar including all cost of materials, labour and T&P etc complete. | 72.46 | Cum | 5,300 ₹3.8 L | 5,200 ₹3.8 L | 2,200 ₹1.6 L | 4,112 ₹3.0 L | 5,377 ₹3.9 L |
Tender Value
₹36.3 L
EMD Value
₹73,000
Closing Date
1 Nov 2025, 4:00 pmClosed
SE 1st IWC Meerut
SE Office 1st IWC Meerut
As per the NIT
2025_UPIDC_1068184_22
02/SE-1/2025-26
Open Tender
Civil Works
90 days
Meerut
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹73,000
SE Office 1st IWC Meerut
25 Dec 2025
27 Oct 2025
1 Nov 2025
27 Oct 2025
1 Nov 2025
27 Oct 2025
31 Oct 2025
Amount
Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material as per direction of Engineer-in-charge
Dismantling reinforced cement concrete including stacking of material including all cost of material, labour and T&P etc complete
Earth work in foundation in all type of soil i/c all lift & lead and i/c back filling ,watering & ramming of exavated earth in to tranch or in to the space between the structure & the side of foundation tranches or in to the plinth with removal & disposal or surplus earth as directed by Engg.-in-Charge.
Earth work in Filling or in embankment in ordinary soil, excavation to be in the form of irregular pits and earth work in embankments to be in 20 cm. layers, including ramming and dressing the surface to the required levels, slopes and also including all lift and all lead upto195m, the earth from cutting to be used in making embankment or to be deposited as spoil banks as directed by Engineer-in-charge.
Centering and shuttering for RCC/RB work including cost of centering & shuttering material, labour and T & P required for proper completion of the work for slab ,lintels ,sun shades, columns & walls etc.
Providing and laying C.C. (A20M15)(1:2:4) including all cost of materials, labour and T&P etc complete.
Providing and laying R.C.C. (A20M25)(1:1:2) including all cost of materials, labour and T&P etc complete.
Supplying and laying TMT Steel bar reinforcement (Fe-550D) including removal of rust, cutting, bending, binding, placement with proper overlapping, providing chairs etc. required.The item includes cost of all material, labour charges, providing & binding with 24 BWG binding wire, T&P, taxes etc. required for proper completion of the required work.
Providing and fixing P.V.C. pipe 100mm dia & 6Kg./Sq.cm I.S.I. Mark including all cost of materials, T&P and labour etc.
Providing & laying 1st class (M-150) Brick work pitching in 1:4 cement mortar including all cost of materials, labour and T&P etc complete.
Providing struck deep pointing in 1:2 cement mortar including cost of all material labour and T&P etc complete.
Providing and laying Thermacol sheet in expansion joint including cost of all material, T&P and labour.
Distempring two coat with oil bound distemper of approval brand and manufacture and of required shade on undercoated wall surface to given an even shade an including a priming coat cement primenr of approved brand and manufecture such as barger,j&n,asian paint after thoroughly brushing the surface free from mortar dropping and other foreign matters and also including preparing the surface even with plaster of paris or approved synthetic material and sand papered smooth including cost of all materials labour and T&P etc complete.
Painting Letter including cost of material for writing chainage of vrb & name i/c cost of material labour and T&P etc complete.
Providing and fixing of (30x90 cm left/right Object Hazard) retro-reflectorised cautionary, mandatory and informatory sign including all cost of materials, labour and T&P etc complete
Removing Bandha etc. including all lift and all lead with ramming and dressing, proper completion of work .
M/S PUSHPENDER KUMAR SHARMA (BID ID -5639749)
SUNIL KUMAR CONTRACTOR (BID ID -5640864)
Sath Shaib Associates (BID ID -5642857)
M/S SAVITRI CONSTRUCTION (BID ID -5643097)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.70 MB
BOQ_1990091.xls
BOQ • 0.28 MB
TDUPLOAD5.pdf
Tender Documents • 6.93 MB
Download all tender documents and submit your bid