Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC | ₹5.0 L Quoted ₹5.8 L | L1 | Accepted-AOC L1 BIDDER |
| 2 | L2₹7.0 L+₹1.1 L (19.7%)Rejected-AOC | ₹7.0 L+₹1.1 L (19.7%) | L2 | Rejected-AOC L2 BIDDER |
| 3 | L3₹8.5 L+₹2.7 L (46.7%)Rejected-Finance VILL BASTIYA P O P S EGRA DIST PURBA MEDINIPUR PIN 721429 | EGRA | PURBA MEDINIPUR | WEST BENGAL | 721429 | ₹8.5 L+₹2.7 L (46.7%) | L3 | Rejected-Finance EMD TO BE REFUNDED |
| Sl No | Description | Qty | Unit | GOURI CONSTRUCTION L3 | SINGHA BAHINI DECORATORS L1 | M/s. Banerjee Construction L2 |
|---|---|---|---|---|---|---|
| 1.00 | Hire and labour charges for erection of pandel excluding any raised platform for facilitation counters with strong Salballah/ bamboo structure with tarpaulin shed with cloth ceiling, upto three sides full cover with blue drill, front side cover with 3’-0’’ to 4’-0’’ high, low height partition with both side cloth including roof projection(chajja), bamboo structure and bamboo barricade, as required including cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete. Payment to be made based on carpet area for 2 days. | 1,725 | Sq. Ft | 80 ₹1,38,000 | 55 ₹94,875 Lowest | 65 ₹1,12,125 |
| 2.00 | Hire and labour charges for erection of pandel including raised platform (6" to 10") for facilitation counters with strong Salballah/ bamboo structure with tarpaulin shed with cloth ceiling, upto three sides full cover with blue drill, front side cover with 3’-0’’ to 4’-0’’ high, low height partition with both side cloth including roof projection(chajja), bamboo structure and bamboo barricade, as required including cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete. Payment to be made based on carpet area for 30 days. | 1,216 | Sq. Ft | 200 ₹2,43,200 | 133 ₹1,61,728 Lowest | 150 ₹1,82,400 |
| 3.00 | Hire and labour charge of Chairs with or without handle Armed moulded chair for 2 days. | 150 | each | 60 ₹9,000 | 30 ₹4,500 Lowest | 50 ₹7,500 |
| 4.00 | Hire and labour charge of Chairs with or without handle Armed moulded chair for 30 days. | 16 | each | 300 ₹4,800 | 150 ₹2,400 Lowest | 200 ₹3,200 |
| 5.00 | Hire and labour charge of moulded Table (4’x3’ size) for 2 days. | 29 | each | 150 ₹4,350 | 100 ₹2,900 Lowest | 130 ₹3,770 |
| 6.00 | Hire and labour charge of moulded Table (4’x3’ size) for 30 days. | 6 | each | 600 ₹3,600 | 450 ₹2,700 Lowest | 520 ₹3,120 |
| 7.00 | Flex framing with 2" X 1.5" wooden frame. | 200 | Rft. | 60 ₹12,000 | 35 ₹7,000 Lowest | 45 ₹9,000 |
| 8.00 | Flex including printing and fixing all complete. | 937 | Sq. Ft | 29 ₹27,173 | 23 ₹21,551 Lowest | 30 ₹28,110 |
| 9.00 | Hire and labour charges of clear Chair cover for 2 days. | 150 | each | 60 ₹9,000 | 30 ₹4,500 Lowest | 40 ₹6,000 |
| 10.00 | Hire and labour charges of clear Chair cover for 30 days. | 16 | each | 220 ₹3,520 | 150 ₹2,400 Lowest | 180 ₹2,880 |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
4 Aug 2026, 3:00 pmClosed
EXECUTIVE ENGINEER (CIVIL)
1ST ADMINISTRATIVE BUILDING, CITY CENTRE, DURGAPUR
CIVIL WORKS
2026_ADDA_1034245_1
ADDA/DGP/ED/Q-03/2026-27
Open Tender
CIVIL WORKS
Item Rate
7 days
CITY CENTRE, DURGAPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹10,000
11 Sept 2026
27 Jul 2026
6 Aug 2026
27 Jul 2026
4 Aug 2026
27 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Hire and labour charges for erection of pandel excluding any raised platform for facilitation counters with strong Salballah/ bamboo structure with tarpaulin shed with cloth ceiling, upto three sides full cover with blue drill, front side cover with 3’-0’’ to 4’-0’’ high, low height partition with both side cloth including roof projection(chajja), bamboo structure and bamboo barricade, as required including cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete. Payment to be made based on carpet area for 2 days. | 1,725 | Sq. Ft | - | - |
| 2 | Hire and labour charges for erection of pandel including raised platform (6" to 10") for facilitation counters with strong Salballah/ bamboo structure with tarpaulin shed with cloth ceiling, upto three sides full cover with blue drill, front side cover with 3’-0’’ to 4’-0’’ high, low height partition with both side cloth including roof projection(chajja), bamboo structure and bamboo barricade, as required including cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete. Payment to be made based on carpet area for 30 days. | 1,216 | Sq. Ft | - | - |
| 3 | Hire and labour charge of Chairs with or without handle Armed moulded chair for 2 days. | 150 | each | - | - |
| 4 | Hire and labour charge of Chairs with or without handle Armed moulded chair for 30 days. | 16 | each | - | - |
| 5 | Hire and labour charge of moulded Table (4’x3’ size) for 2 days. | 29 | each | - | - |
| 6 | Hire and labour charge of moulded Table (4’x3’ size) for 30 days. | 6 | each | - | - |
| 7 | Flex framing with 2" X 1.5" wooden frame. | 200 | Rft. | - | - |
| 8 | Flex including printing and fixing all complete. | 937 | Sq. Ft | - | - |
| 9 | Hire and labour charges of clear Chair cover for 2 days. | 150 | each | - | - |
| 10 | Hire and labour charges of clear Chair cover for 30 days. | 16 | each | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.16 MB
BOQ_2540167.xls
BOQ • 0.29 MB
TenderBook.pdf
Tender Documents • 1.98 MB
CORRIGENDUMNOTICE.pdf
PDF • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .